|
Volumn 131, Issue 2, 2009, Pages
|
Performance and cost analysis of advanced gas turbine cycles with Precombustion CO2 capture
a a a b c |
Author keywords
[No Author keywords available]
|
Indexed keywords
COMBINED CYCLE;
COMBINED CYCLE GAS TURBINE PLANTS;
COST ANALYSIS;
COST TARGETS;
CYCLE EFFICIENCY;
CYCLE PERFORMANCE;
DEVELOPMENT PATH;
ENERGY SAVING;
FEASIBILITY ANALYSIS;
FRAME GAS TURBINES;
GAS TURBINE CYCLES;
HIGH EFFICIENCY;
LONG-TERM SOLUTIONS;
LOW CAPITAL COSTS;
LOW EMISSION;
NATURAL GAS REFORMING;
NEW TECHNOLOGIES;
PARTIAL OXIDATIONS;
PERFORMANCE TARGETS;
PRE-COMBUSTIONS;
PRESSURE LEVEL;
SEPARATION MEMBRANES;
SOLVENT BASED;
SYN-GAS;
SYN-GAS GENERATION;
TECHNICAL RISKS;
CARBON DIOXIDE;
COST ACCOUNTING;
COSTS;
GAS PERMEABLE MEMBRANES;
GAS PLANTS;
GAS TURBINES;
NATURAL GAS;
POWER PLANTS;
REFORMING REACTIONS;
SYNTHESIS GAS;
TURBOMACHINERY;
COST BENEFIT ANALYSIS;
|
EID: 77955151125
PISSN: 07424795
EISSN: 15288919
Source Type: Journal
DOI: 10.1115/1.2982147 Document Type: Article |
Times cited : (21)
|
References (11)
|