메뉴 건너뛰기




Volumn 18, Issue 8, 2010, Pages 845-851

Dependency on prioritized data in the delay analysis of foundation fieldbus

Author keywords

Communications systems; Delay analysis; Foundation fieldbus; Mathematical model; Token passing protocol

Indexed keywords

ANALYTICAL MODEL; COMMUNICATIONS SYSTEMS; DATA LATENCIES; DATA LINK LAYER; DATA TRANSMISSION; DELAY ANALYSIS; DELAY PERFORMANCE; FOUNDATION FIELDBUS; SCHEDULED SERVICES; SIMULATION EXPERIMENTS; TOKEN ROTATION TIME; TOKEN-PASSING;

EID: 77955092759     PISSN: 09670661     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.conengprac.2008.11.003     Document Type: Article
Times cited : (8)

References (18)
  • 3
    • 77955095598 scopus 로고
    • Discrete-time analysis of a cyclic service system with gated limited service. Report No. 67, University of Würzburg, Germany.
    • Dittmann, R., & Hübner, F., (1993). Discrete-time analysis of a cyclic service system with gated limited service. Report No. 67, University of Würzburg, Germany.
    • (1993)
    • Dittmann, R.1    Hübner, F.2
  • 4
    • 77955096185 scopus 로고    scopus 로고
    • FOUNDATIONTM Specifications. Data link protocol specifications. Fieldbus Foundation, Austin, TX.
    • FOUNDATIONTM Specifications (1997). Data link protocol specifications. Fieldbus Foundation, Austin, TX.
    • (1997)
  • 5
    • 0028407205 scopus 로고
    • Approximate analysis of timer-controlled priority scheme in the single-service token-passing systems. IEEE/ACM Transactions on Networking,
    • Hong, S. H. (1994). Approximate analysis of timer-controlled priority scheme in the single-service token-passing systems. IEEE/ACM Transactions on Networking, 206-215.
    • (1994) , pp. 206-215
    • Hong, S.H.1
  • 6
    • 0344013009 scopus 로고    scopus 로고
    • Experimental evaluation of a bandwidth allocation scheme for foundation fieldbus
    • Hong S.H., Choi I.H. Experimental evaluation of a bandwidth allocation scheme for foundation fieldbus. IEEE Transactions on Instrument and Measurement 2003, 1787-1791.
    • (2003) IEEE Transactions on Instrument and Measurement , pp. 1787-1791
    • Hong, S.H.1    Choi, I.H.2
  • 7
    • 0034856510 scopus 로고    scopus 로고
    • Time critical data transmission in the foundation fieldbus. In Proceedings of the ISIE 2001,
    • Hong, S. H., & Jang, B. D. (2001). Time critical data transmission in the foundation fieldbus. In Proceedings of the ISIE 2001, pp. 555-559.
    • (2001) , pp. 555-559
    • Hong, S.H.1    Jang, B.D.2
  • 8
    • 0034969571 scopus 로고    scopus 로고
    • A simulation study on the performance analysis of the data link layer of IEC/ISA fieldbus
    • Hong S.H., Ko S.J. A simulation study on the performance analysis of the data link layer of IEC/ISA fieldbus. SIMULATION 2001, 109-118.
    • (2001) SIMULATION , pp. 109-118
    • Hong, S.H.1    Ko, S.J.2
  • 12
    • 0018444424 scopus 로고
    • Multiqueue systems with nonexhaustive cyclic service
    • Kuehn P.J. Multiqueue systems with nonexhaustive cyclic service. The Bell System Technical Journal 1979, 671-698.
    • (1979) The Bell System Technical Journal , pp. 671-698
    • Kuehn, P.J.1
  • 13
    • 0025502587 scopus 로고
    • Polling systems: Applications, modeling and optimization
    • Levy H., Sidi M. Polling systems: Applications, modeling and optimization. IEEE Transactions on Communications 1990, 38(10):1750-1760.
    • (1990) IEEE Transactions on Communications , vol.38 , Issue.10 , pp. 1750-1760
    • Levy, H.1    Sidi, M.2
  • 17
    • 0032681770 scopus 로고    scopus 로고
    • Fieldbuses and interoperability
    • Thomesse J.P. Fieldbuses and interoperability. Control Engineering Practice 1999, 7(1):81-94.
    • (1999) Control Engineering Practice , vol.7 , Issue.1 , pp. 81-94
    • Thomesse, J.P.1
  • 18
    • 0032598181 scopus 로고    scopus 로고
    • Supporting real-time distributed computer-controlled systems with multi-hop P-NET networks
    • Tovar E., Vasques F., Burns A. Supporting real-time distributed computer-controlled systems with multi-hop P-NET networks. Control Engineering Practice 1999, 7(8):1015-1025.
    • (1999) Control Engineering Practice , vol.7 , Issue.8 , pp. 1015-1025
    • Tovar, E.1    Vasques, F.2    Burns, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.