메뉴 건너뛰기




Volumn 69, Issue 3, 2010, Pages 325-332

Jinping hydropower project: Main technical issues on engineering geology and rock mechanics

Author keywords

Arch dam; Deep underground caverns; Geo stresses; Hydropower; Jinping Project; Yalong River

Indexed keywords

DEEP UNDERGROUND CAVERNS; GEO-STRESSES; HIGH ARCH DAMS; HYDROPOWER; HYDROPOWER PROJECTS; RIVER BEND; SOUTHWEST CHINA; UNDERGROUND CAVERN; UNDERGROUND POWERHOUSE;

EID: 77954955079     PISSN: 14359529     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10064-010-0272-4     Document Type: Article
Times cited : (71)

References (9)
  • 1
    • 77954955616 scopus 로고    scopus 로고
    • Chengdu Hydropower Investigation & Design and Research Institute (2003) The feasibility Report of Jinping I Hydropower Project, Chengdu, China.
  • 2
    • 77954960163 scopus 로고    scopus 로고
    • East China Hydropower Investigation & Design and Research Institute (2005) The feasibility Report of Jinping II Hydropower Project, Hangzhou, China.
  • 3
    • 77954958965 scopus 로고    scopus 로고
    • Gong M, Qi S, Liu J (2009) Engineering geological problems related to high geo-stresses at the Jinping I Hydropower Station, Southwest China. Bull Eng Geol Environ (submitted).
  • 4
    • 77954959705 scopus 로고    scopus 로고
    • Huang R, Lin F, Yan M (2009) Deformation mechanism and stability evaluation for the left abutment slope of Jinping I Hydropower Station. Bull Eng Geol Environ (submitted).
  • 5
    • 77954958826 scopus 로고    scopus 로고
    • Jiang Q, Feng X, Xiang T (2009) Rockburst characteristics and numerical simulation based on a new energy index: a case study of a tunnel at 2500 m depth. Bull Eng Geol Environ (submitted).
  • 6
    • 1842713131 scopus 로고    scopus 로고
    • Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station
    • Qi S, Wu F, Yan F, Lan H (2004) Mechanism of deep cracks in the left bank slope of Jinping first stage hydropower station. Eng Geol 73(1-2): 129-144.
    • (2004) Eng Geol , vol.73 , Issue.1-2 , pp. 129-144
    • Qi, S.1    Wu, F.2    Yan, F.3    Lan, H.4
  • 7
    • 77954954935 scopus 로고    scopus 로고
    • Qi S, Wu F, Zhou Y, Song Y, Gong M (2009) Influence of deep seated discontinuities on the left slope of Jinping I Hydropower Station and its stability analysis. Bull Eng Geol Environ (submitted).
  • 8
    • 77954953452 scopus 로고    scopus 로고
    • Shan Z (2009) High in situ stress break and controlling during excavation of deep-lying tunnel in Jinping II Hydropower Station. Bull Eng Geol Environ (submitted).
  • 9
    • 77954957563 scopus 로고    scopus 로고
    • Wu F, Hu X, Gong M, Liu J, Ren A (2009) Unloading deformation during layered excavation for the underground powerhouse of Jinping I Hydropower Station, southwest China. Bull Eng Geol Environ (submitted).