메뉴 건너뛰기




Volumn 54, Issue 2, 2009, Pages 321-339

Minable reserve estimation while determining ultimate pit limits (UPL) under price uncertainty by real option approach (ROA)

Author keywords

Minable reserve; Open Pit Mining; Price uncertainty; Real option approach; Ultimate pit limits (UPL)

Indexed keywords


EID: 77954873088     PISSN: 08607001     EISSN: 16890469     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (15)

References (28)
  • 2
    • 70449705456 scopus 로고    scopus 로고
    • An updated an modified O'Hara cost estimating model based on world and Iran economic condition
    • nd APCOM, 3-18.
    • (2005) nd APCOM , pp. 3-18
    • Akbari, A.D.1    Osanloo, M.2
  • 4
    • 0035450865 scopus 로고    scopus 로고
    • Uncertainty and the convenience yield in crude oil price backwardations
    • Considine T.J., Larson, D.F., 2001. Uncertainty and the convenience yield in crude oil price backwardations, Energy Economics, 23, 533-548.
    • (2001) Energy Economics , vol.23 , pp. 533-548
    • Considine, T.J.1    Larson, D.F.2
  • 5
    • 33750081068 scopus 로고    scopus 로고
    • Estimating the volatility of mining projects considering price and operating cost uncertainties
    • Costa Lima, Gabriel A., Suslick Saul B., 2006. Estimating the volatility of mining projects considering price and operating cost uncertainties, Resources Policy, 31 (2), 86-94.
    • (2006) Resources Policy , vol.31 , Issue.2 , pp. 86-94
    • Costa, L.1    Gabriel, A.2    Suslick, S.B.3
  • 7
    • 0000271915 scopus 로고    scopus 로고
    • Competitive storage and commodity price dynamics
    • Deaton A., Laroque G., 1996. Competitive storage and commodity price dynamics, Journal of Political Economy, CIV, 896-923.
    • (1996) Journal of Political Economy , vol.104 , pp. 896-923
    • Deaton, A.1    Laroque, G.2
  • 8
    • 0028121944 scopus 로고
    • Open pit design and scheduling by use of genetic algorithms
    • Denby B., Schofield D., 1994. Open pit design and scheduling by use of genetic algorithms, IMM Transactions, 103, A21-A26.
    • (1994) IMM Transactions , vol.103
    • Denby, B.1    Schofield, D.2
  • 9
    • 0028888123 scopus 로고
    • Inclusion of risk assessment in open pit design and scheduling
    • Denby B., Schofield D., 1995. Inclusion of risk assessment in open pit design and scheduling, IMM Transactions, 104, A67-A71.
    • (1995) IMM Transactions , vol.104
    • Denby, B.1    Schofield, D.2
  • 10
    • 6444240664 scopus 로고    scopus 로고
    • Valuation of exploration and production assets: An overview of real options models
    • Dias M.A.G., 2004. Valuation of exploration and production assets: an overview of real options models, Journal of Petroleum Science and Engineering, 44, 93-114.
    • (2004) Journal of Petroleum Science and Engineering , vol.44 , pp. 93-114
    • Dias, M.A.G.1
  • 11
    • 35448937145 scopus 로고    scopus 로고
    • Evaluating mine plans under uncertainty: Can the real options make a difference?
    • Dimitrakopoulos R., Abdel Sabour S., 2007. Evaluating mine plans under uncertainty: Can the real options make a difference? Resources Policy, 32(3), 116-125.
    • (2007) Resources Policy , vol.32 , Issue.3 , pp. 116-125
    • Dimitrakopoulos, R.1    Abdel Sabour, S.2
  • 13
    • 0020246206 scopus 로고
    • Alinear programming approach to mine scheduling optimization
    • th APCOM, 483-493.
    • (1982) th APCOM , pp. 483-493
    • Gershon, M.E.1
  • 16
    • 77954881445 scopus 로고
    • Hand methods
    • ed. Crawford & Hustrulid. SME/AIME Transactions
    • Koskiniemi B.C., 1979. Hand methods. In Open pit mine planning and design, ed. Crawford & Hustrulid. SME/AIME Transactions, 187-195.
    • (1979) Open Pit Mine Planning and Design , pp. 187-195
    • Koskiniemi, B.C.1
  • 17
    • 0001886845 scopus 로고
    • Optimum design of open-pit mines
    • Lerchs H., Grossmann L., 1965. Optimum design of open-pit mines, CIM Bulletin, 58, 47-54.
    • (1965) CIM Bulletin , vol.58 , pp. 47-54
    • Lerchs, H.1    Grossmann, L.2
  • 18
    • 0001886845 scopus 로고
    • Optimum design of open pit mines
    • Lerchs H., Grosmann L., 1965. Optimum design of open pit mines, CIM Transaction, 68, 17-24.
    • (1965) CIM Transaction , vol.68 , pp. 17-24
    • Lerchs, H.1    Grosmann, L.2
  • 20
    • 84993839697 scopus 로고
    • Backwardation in oil futures markets: Theory and empirical evidence
    • Litzenberger R.H., Rabinowitz N., 1995. Backwardation in oil futures markets: theory and empirical evidence, Journal of Finance, L, 1517-1545.
    • (1995) Journal of Finance , vol.50 , pp. 1517-1545
    • Litzenberger, R.H.1    Rabinowitz, N.2
  • 21
    • 0016972463 scopus 로고
    • Maximum closure of a graph and applications to combinatorial problems
    • Picard J.C., 1976. Maximum closure of a graph and applications to combinatorial problems, Management science, 22, 1268-1272.
    • (1976) Management science , vol.22 , pp. 1268-1272
    • Picard, J.C.1
  • 24
    • 0006967949 scopus 로고
    • Enhance production planning in open pit mining through intelligent dynamic search
    • rd APCOM, 461-471.
    • (1992) rd APCOM , pp. 461-471
    • Wang, Q.1    Sevim, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.