메뉴 건너뛰기




Volumn 25, Issue 3, 2010, Pages 1384-1392

Application of a joint deterministic-probabilistic criterion to wind integrated bulk power system planning

Author keywords

Bulk power system; joint deterministic and probabilistic criterion; planning; wind capacity credit; wind energy

Indexed keywords

BULK POWER SYSTEMS; JOINT DETERMINISTIC AND PROBABILISTIC CRITERION; PROBABILISTIC CRITERIA; WIND CAPACITY; WIND ENERGY;

EID: 77954834903     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2009.2039652     Document Type: Article
Times cited : (36)

References (16)
  • 4
    • 0024719222 scopus 로고
    • A reliability test system for educational purposes basic data
    • Aug.
    • R. Billinton et al., "A reliability test system for educational purposes basic data," IEEE Trans. Power Syst., vol.4, no.3, pp. 1238-1244, Aug. 1989.
    • (1989) IEEE Trans. Power Syst. , vol.4 , Issue.3 , pp. 1238-1244
    • Billinton, R.1
  • 5
    • 40849098849 scopus 로고    scopus 로고
    • Multi-state wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy
    • Mar.
    • R. Billinton and Y. Gao, "Multi-state wind energy conversion system models for adequacy assessment of generating systems incorporating wind energy," IEEE Trans. Energy Convers., vol.23, no.1, pp. 163-170, Mar. 2008.
    • (2008) IEEE Trans. Energy Convers. , vol.23 , Issue.1 , pp. 163-170
    • Billinton, R.1    Gao, Y.2
  • 6
    • 33947319093 scopus 로고    scopus 로고
    • Considering load carrying capacity and wind speed correlation of WECS in generation adequacy assessment
    • Sep.
    • W.Wangdee and R. Billinton, "Considering load carrying capacity and wind speed correlation of WECS in generation adequacy assessment," IEEE Trans. Energy Convers., vol.21, no.3, pp. 734-741, Sep. 2006.
    • (2006) IEEE Trans. Energy Convers. , vol.21 , Issue.3 , pp. 734-741
    • Wangdee, W.1    Billinton, R.2
  • 7
    • 0032140599 scopus 로고    scopus 로고
    • Assessment of risk-based capacity benefit factors associated with wind energy conversion systems
    • Aug.
    • R. Billinton and H. Chen, "Assessment of risk-based capacity benefit factors associated with wind energy conversion systems," IEEE Trans. Power Syst., vol.13, no.3, pp. 1191-1198, Aug. 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , Issue.3 , pp. 1191-1198
    • Billinton, R.1    Chen, H.2
  • 9
    • 77954834642 scopus 로고    scopus 로고
    • Consultant National Renewable Energy Laboratory, Apr. 26
    • M. Milligan, Capacity Credit for Wind, Consultant National Renewable Energy Laboratory, Apr. 26, 2007.
    • (2007) Capacity Credit for Wind
    • Milligan, M.1
  • 10
    • 77954834218 scopus 로고    scopus 로고
    • American Wind Energy Association, Dec., [Online]. Available
    • American Wind Energy Association, Dec. 2008. [Online]. Available: http://www.awea.org/faq/wwt-basics.html.
    • (2008)
  • 11
    • 77954834262 scopus 로고    scopus 로고
    • Independent Electricity System Operator (IESO) Canadian Wind Energy Association (CanWEA) for OntarioWind Integration Study, Dec., [Online]. Available
    • Independent Electricity System Operator (IESO) Canadian Wind Energy Association (CanWEA) for OntarioWind Integration Study, Dec. 2008. [Online]. Available: http://www.ieso.ca/imoweb/pubs/marketreports/OPA-Report-200610-1.pdf.
    • (2008)
  • 12
    • 32944482165 scopus 로고    scopus 로고
    • Report on Phase 2: System Performance Evaluation, The New York State Energy Research and Development Authority and GE Energy, Energy Consulting, Mar. 4
    • The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations, Report on Phase 2: System Performance Evaluation, The New York State Energy Research and Development Authority and GE Energy, Energy Consulting, Mar. 4, 2005.
    • (2005) The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations
  • 13
    • 77954834093 scopus 로고    scopus 로고
    • PJM-Manual 21: Rules and Procedures for Determination of Generating Capability Appendix B: Calculating Capacity Values for Intermittent Capacity Resources, [Online]. Available
    • PJM-Manual 21: Rules and Procedures for Determination of Generating Capability Appendix B: Calculating Capacity Values for Intermittent Capacity Resources, 2008. [Online]. Available: http://www.pjm.com/committees/working- groups/irwg/downloads/20081014-item-03-manual-21.pdf.
    • (2008)
  • 14
    • 0030241740 scopus 로고    scopus 로고
    • Time-series models for reliability evaluation of power systems including wind energy
    • DOI 10.1016/0026-2714(95)00154-9
    • R. Billinton, H. Chen, and R. Ghajar, "Time-series models for reliability evaluation of power systems including wind energy," Microelectron. Reliab., vol.36, no.9, pp. 1253-1261, 1996. (Pubitemid 126378823)
    • (1996) Microelectronics Reliability , vol.36 , Issue.9 , pp. 1253-1261
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 15
    • 77954834238 scopus 로고    scopus 로고
    • Canadian Electricity Association, Report on Bulk Electricity System Delivery Point Interruptions & Significant Power Interruptions
    • Canadian Electricity Association, Report on Bulk Electricity System Delivery Point Interruptions & Significant Power Interruptions, 2007.
    • (2007)
  • 16
    • 65349132534 scopus 로고    scopus 로고
    • Adequacy assessment of generating systems containing wind power considering wind speed correlation
    • Jun.
    • Y. Gao and R. Billinton, "Adequacy assessment of generating systems containing wind power considering wind speed correlation," IET Renew. Power Gen., vol.3, no.2, pp. 217-226, Jun. 2009.
    • (2009) IET Renew. Power Gen. , vol.3 , Issue.2 , pp. 217-226
    • Gao, Y.1    Billinton, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.