Promoting the investment on IPPs for optimal grid planning

Author keywords

Incentive payments; IPP investments; transmission congestion; transmission expansion planning; transmission security

Indexed keywords

CONGESTION COSTS; DECENTRALIZED GENERATION; GRID PLANNING; INCENTIVE MECHANISM; INCENTIVE PAYMENTS; INVESTMENT DECISIONS; PLANNING ALGORITHMS; PLANNING HORIZONS; POWER SYSTEM SECURITY; PRIORITIZATION; SECURITY CONSTRAINT; TRANSMISSION CONGESTION; TRANSMISSION EXPANSION PLANNING; TRANSMISSION INVESTMENTS; TRANSMISSION SECURITY;

EID: 77954834382     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2009.2039947     Document Type: Article
Times cited : (18)

References (14)
  • 1
    • 0027698371 scopus 로고
    • Transmission planning issues in a competitive economic environment
    • Nov.
    • R. Baldick and E. Kahn, "Transmission planning issues in a competitive economic environment," IEEE Trans. Power Syst., vol.8, no.4, pp. 1497-1503, Nov. 1993.
    • (1993) IEEE Trans. Power Syst. , vol.8 , Issue.4 , pp. 1497-1503
    • Baldick, R.1    Kahn, E.2
  • 2
    • 0035792569 scopus 로고    scopus 로고
    • Transmission planning and investment under competitive electricity market environment
    • Jul.
    • A. K. David and F.Wen, "Transmission planning and investment under competitive electricity market environment," in Proc. IEEE Power Eng. Soc. Summer Meeting, Jul. 2001, vol.3, pp. 1725-1730.
    • (2001) Proc. IEEE Power Eng. Soc. Summer Meeting , vol.3 , pp. 1725-1730
    • David, A.K.1    Wen, F.2
  • 3
    • 27744593937 scopus 로고    scopus 로고
    • Transmission system planning-The old world meets the new
    • Nov.
    • R. J. Thomas, J. T. Whitehead, H. Outhred, and T. D. Mount, "Transmission system planning-The old world meets the new," Proc. IEEE, vol.93, no.11, pp. 2026-2034, Nov. 2005.
    • (2005) Proc. IEEE , vol.93 , Issue.11 , pp. 2026-2034
    • Thomas, R.J.1    Whitehead, J.T.2    Outhred, H.3    Mount, T.D.4
  • 4
    • 24944489289 scopus 로고    scopus 로고
    • A multiyear dynamic approach for transmission expansion planning and long-term marginal costs computation
    • Aug.
    • A. S. D. Braga and J. T. Saraiva, "A multiyear dynamic approach for transmission expansion planning and long-term marginal costs computation," IEEE Trans. Power Syst., vol.20, no.3, pp. 1631-1639, Aug. 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , Issue.3 , pp. 1631-1639
    • Braga, A.S.D.1    Saraiva, J.T.2
  • 7
    • 0036338474 scopus 로고    scopus 로고
    • The political economy of longterm generation adequacy: Why an ICAP mechanism is needed as part of standard market design
    • Aug./Sep.
    • B. J. Gail, J. G. Farr, and S. F. Tierney, "The political economy of longterm generation adequacy: Why an ICAP mechanism is needed as part of standard market design," Electricity J., vol.15, no.7, pp. 53-62, Aug./Sep. 2002.
    • (2002) Electricity J. , vol.15 , Issue.7 , pp. 53-62
    • Gail, B.J.1    Farr, J.G.2    Tierney, S.F.3
  • 8
    • 36349005968 scopus 로고    scopus 로고
    • Market-based coordination of transmission and generation capacity planning
    • Nov.
    • J. H. Roh, M. Shahidehpour, and Y. Fu, "Market-based coordination of transmission and generation capacity planning," IEEE Trans. Power Syst., vol.22, no.4, pp. 1406-1419, Nov. 2007.
    • (2007) IEEE Trans. Power Syst. , vol.22 , Issue.4 , pp. 1406-1419
    • Roh, J.H.1    Shahidehpour, M.2    Fu, Y.3
  • 9
    • 34248550993 scopus 로고    scopus 로고
    • Security-constrained resource planning in electricity markets
    • May.
    • J. H. Roh, M. Shahidehpour, and Y. Fu, "Security-constrained resource planning in electricity markets," IEEE Trans. Power Syst., vol.22, no.2, pp. 812-820, May 2007.
    • (2007) IEEE Trans. Power Syst. , vol.22 , Issue.2 , pp. 812-820
    • Roh, J.H.1    Shahidehpour, M.2    Fu, Y.3
  • 10
    • 13944282202 scopus 로고    scopus 로고
    • Optimal investments in power generation under centralized and decentralized decision making
    • Feb.
    • A. Botterud, M. D. Ilic, and I. Wangensteen, "Optimal investments in power generation under centralized and decentralized decision making," IEEE Trans. Power Syst., vol.20, no.1, pp. 254-263, Feb. 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , Issue.1 , pp. 254-263
    • Botterud, A.1    Ilic, M.D.2    Wangensteen, I.3
  • 11
    • 33845768321 scopus 로고    scopus 로고
    • Proactive planning and valuation of transmission investments in restructured electricity markets
    • Sep.
    • E. Sauma and S. Oren, "Proactive planning and valuation of transmission investments in restructured electricity markets," J. Reg. Econ., vol.30, pp. 261-290, Sep. 2006.
    • (2006) J. Reg. Econ. , vol.30 , pp. 261-290
    • Sauma, E.1    Oren, S.2
  • 12
    • 43849112156 scopus 로고    scopus 로고
    • Congestion-driven transmission planning considering the impact of generator expansion
    • May.
    • O. B. Tor, A. N. Guven, and M. Shahidehpour, "Congestion-driven transmission planning considering the impact of generator expansion," IEEE Trans. Power Syst., vol.23, no.2, pp. 781-789, May 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.2 , pp. 781-789
    • Tor, O.B.1    Guven, A.N.2    Shahidehpour, M.3
  • 14
    • 0004093907 scopus 로고
    • Washington DC: American Council for an Energy-Efficiency Economy
    • E. Kahn, Electric Utility Planning and Regulation. Washington, DC: American Council for an Energy-Efficiency Economy, 1991.
    • (1991) Electric Utility Planning and Regulation
    • Kahn, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.