메뉴 건너뛰기




Volumn , Issue , 2010, Pages 143-148

Pessimistic evaluation of risks using ranking of generalized fuzzy numbers

Author keywords

[No Author keywords available]

Indexed keywords

FUZZY INFERENCE SYSTEMS; FUZZY LINGUISTICS; FUZZY NUMBERS; GENERALIZED FUZZY NUMBERS; HIGH COSTS; LOW QUALITIES; POOR PERFORMANCE; RISK FACTORS; RISK OF FAILURE; TIME PRESSURES; WEIGHTED AVERAGES;

EID: 77954429181     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SYSTEMS.2010.5482483     Document Type: Conference Paper
Times cited : (2)

References (8)
  • 1
    • 13944255907 scopus 로고    scopus 로고
    • Fuzzy decision support system for risk analysis in e-Commerce development
    • January
    • E. W. T. Ngai and F. K. T. Wat, "Fuzzy decision support system for risk analysis in e- commerce development," Decision Support Systems, vol. 99, no. 40, pp. 235-255, January 2005.
    • (2005) Decision Support Systems , vol.99 , Issue.40 , pp. 235-255
    • Ngai, E.W.T.1    Wat, F.K.T.2
  • 2
    • 0037331465 scopus 로고    scopus 로고
    • Fuzzy risk analysis based on similarity measures of generalized fuzzy numbers
    • February
    • S. J. Chen and S. M. Chen, "Fuzzy risk analysis based on similarity measures of generalized fuzzy numbers," IEEE Transaction on Fuzzy Systems, vol. 99, no. 11, pp. 45-56, February 2003.
    • (2003) IEEE Transaction on Fuzzy Systems , vol.99 , Issue.11 , pp. 45-56
    • Chen, S.J.1    Chen, S.M.2
  • 3
    • 27644445714 scopus 로고    scopus 로고
    • Risk management and the precautionary principle: A fuzzy logic model
    • E. Cameron and G. Peloso, "Risk management and the precautionary principle: A fuzzy logic model," Risk Analysis, vol. 25, no. 4, 2005.
    • (2005) Risk Analysis , vol.25 , Issue.4
    • Cameron, E.1    Peloso, G.2
  • 5
    • 0029718539 scopus 로고    scopus 로고
    • Risk analysis modelling with the use of fuzzy logic
    • W. G. de Ru and J. H. P. Eloff, "Risk analysis modelling with the use of fuzzy logic," Computers and Security, vol. 15, no. 3, pp. 239-248, 1996.
    • (1996) Computers and Security , vol.15 , Issue.3 , pp. 239-248
    • De Ru, W.G.1    Eloff, J.H.P.2
  • 6
    • 0035476791 scopus 로고    scopus 로고
    • A fuzzy approach to construction project risk assessment and analysis: Construction project risk management system
    • V. Carr and J. Tah, "A fuzzy approach to construction project risk assessment and analysis: construction project risk management system," Advances in Engineering Software, vol. 32, pp. 847-857, 2001.
    • (2001) Advances in Engineering Software , vol.32 , pp. 847-857
    • Carr, V.1    Tah, J.2
  • 7
    • 2442429010 scopus 로고
    • Ranking fuzzy numbers with maximizing set and minimizing set
    • S. Chen, "Ranking fuzzy numbers with maximizing set and minimizing set," Fuzzy Sets and Systems, no. 17, pp. 113-129, 1985.
    • (1985) Fuzzy Sets and Systems , Issue.17 , pp. 113-129
    • Chen, S.1
  • 8
    • 0022011112 scopus 로고
    • A review of some methods for ranking fuzzy subsets
    • G. Bortolan and R. Degani, "A review of some methods for ranking fuzzy subsets," Fuzzy Sets and Systems, no. 15, pp. 1-19, 1985.
    • (1985) Fuzzy Sets and Systems , Issue.15 , pp. 1-19
    • Bortolan, G.1    Degani, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.