-
1
-
-
0036244058
-
The Role of Process Simulation in Pharmaceutical Process Development and Product Commercialization
-
January/February
-
Petrides, D., Koulouris, A., and Lagonikos, P., "The Role of Process Simulation in Pharmaceutical Process Development and Product Commercialization," Pharmaceutical Engineering, January/February 2002, Vol. 22, No. 1, www.ispe.org.
-
(2002)
Pharmaceutical Engineering
, vol.22
, Issue.1
-
-
Petrides, D.1
Koulouris, A.2
Lagonikos, P.3
-
2
-
-
0036333740
-
Throughput Analysis and Debottlenecking of Biomanufacturing Facilities, A Job for Process Simulators
-
August
-
Petrides, D., Koulouris, A., and Siletti, C., "Throughput Analysis and Debottlenecking of Biomanufacturing Facilities, A Job for Process Simulators," BioPharm, August 2002.
-
(2002)
BioPharm
-
-
Petrides, D.1
Koulouris, A.2
Siletti, C.3
-
3
-
-
17744364325
-
The Role of Process Simulation and Scheduling Tools in the Development and Manufacturing of Biopharmaceuticals
-
Ingalls, R.G., Rossetti, M. D., Smith, J. S., and Peters, B. A., eds.
-
Petrides, D., and Siletti, C., "The Role of Process Simulation and Scheduling Tools in the Development and Manufacturing of Biopharmaceuticals, Proceedings of the 2004 Winter Simulation Conference, Ingalls, R.G., Rossetti, M. D., Smith, J. S., and Peters, B. A., eds., pp. 2046-2051.
-
Proceedings of the 2004 Winter Simulation Conference
, pp. 2046-2051
-
-
Petrides, D.1
Siletti, C.2
-
4
-
-
33746869273
-
Debottlenecking of a Batch Pharmaceutical Cream Production
-
July/August
-
Tan, J., Foo, D.C.Y., Kumaresan, S., and Aziz, R.A., " Debottlenecking of a Batch Pharmaceutical Cream Production," Pharmaceutical Engineering, July/August 2006, Vol. 26 No. 4, pp. 72-82, www.ispe.org.
-
(2006)
Pharmaceutical Engineering
, vol.26
, Issue.4
, pp. 72-82
-
-
Tan, J.1
Foo, D.C.Y.2
Kumaresan, S.3
Aziz, R.A.4
-
5
-
-
79952507481
-
Biotechnology Research Continues to Bolster Arsenal Against Disease with 633 Medicines in Development
-
Pharmaceutical Research and Manufacturers of America, Biotechnology Research Continues to Bolster Arsenal Against Disease with 633 Medicines in Development, PhRMA 2008 survey, www.phrma. org.
-
PhRMA 2008 Survey
-
-
-
6
-
-
33746163862
-
Biopharmaceutical Benchmarks 2006
-
Walsh, G., "Biopharmaceutical Benchmarks 2006," Nat. Biotech, 24(7) 2006:769-775.
-
(2006)
Nat. Biotech
, vol.24
, Issue.7
, pp. 769-775
-
-
Walsh, G.1
-
7
-
-
33749236399
-
Established Bioprocesses for Producing Antibodies as a Basis for Future Planning
-
published online 8 June 2006
-
Farid, S.S., "Established Bioprocesses for Producing Antibodies as a Basis for Future Planning," Advances in Biochemical Engineering/ Biotechnology, (2006) 101: 1-42, published online 8 June 2006.
-
(2006)
Advances in Biochemical Engineering/ Biotechnology
, vol.101
, pp. 1-42
-
-
Farid, S.S.1
-
8
-
-
14844285410
-
The Therapeutic Antibodies Market to 2008
-
Pavlou, A.K., Belsey, M.J., "The Therapeutic Antibodies Market to 2008," European Journal of Pharmaceutics and Biopharmaceutics, 59(3) 2005:389-396.
-
(2005)
European Journal of Pharmaceutics and Biopharmaceutics
, vol.59
, Issue.3
, pp. 389-396
-
-
Pavlou, A.K.1
Belsey, M.J.2
-
9
-
-
56249135611
-
Where is Biopharmaceutical Manufacturing Heading?
-
October
-
Jagschies, G., "Where is Biopharmaceutical Manufacturing Heading?," BioPharm International, 21(10), October 2008.
-
(2008)
BioPharm International
, vol.21
, Issue.10
-
-
Jagschies, G.1
-
10
-
-
78649649210
-
Economic Drivers and Trade-Offs in Antibody Purification Processes
-
2 October
-
Farid, S.S., "Economic Drivers and Trade-Offs in Antibody Purification Processes," BioPharm International, http:// biopharminternational.findpharma.com/biopharm/Downstream+Processing/ Economic-Drivers-and-Trade-Offs-in-Antibody-Purifi/ArticleStandard/Article/ detail/633295, 2 October 2009.
-
(2009)
BioPharm International
-
-
Farid, S.S.1
-
11
-
-
33847793307
-
Future of Antibody Production
-
Low, D., O'Leary, R., Pujar, N.S., "Future of Antibody Production," Journal of Chromatography, B 848(1), 2007:48-63.
-
(2007)
Journal of Chromatography
, vol.B 848
, Issue.1
, pp. 48-63
-
-
Low, D.1
O'Leary, R.2
Pujar, N.S.3
-
12
-
-
0003458924
-
-
Instrument Society of America (ISA), Research Triangle Park, North Carolina, USA
-
Parshall, J., Lamb, L., Applying S88 - Batch Control from a User's Perspective, Instrument Society of America (ISA), Research Triangle Park, North Carolina, USA, 2000.
-
(2000)
Applying S88 - Batch Control from A User's Perspective
-
-
Parshall, J.1
Lamb, L.2
|