-
1
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
10.1016/S0305-0483(98)00042-5
-
A Allahverdi JND Gupta T Aldowaisan 1999 A review of scheduling research involving setup considerations Omega 27 219 239 10.1016/S0305-0483(98)00042-5
-
(1999)
Omega
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
3
-
-
36849022486
-
Single-machine scheduling problems with past-sequence-dependent setup times
-
C Koulamas GJ Kyparisis 2008 Single-machine scheduling problems with past-sequence-dependent setup times Eur J Oper Res 187 68 72
-
(2008)
Eur J Oper Res
, vol.187
, pp. 68-72
-
-
Koulamas, C.1
Kyparisis, G.J.2
-
4
-
-
33846631348
-
Single machine scheduling with past-sequence-dependent setup times and learning effects
-
DOI 10.1016/j.ipl.2006.11.002, PII S0020019006003176
-
W-H Kuo D-L Yang 2007 Single-machine scheduling with pastsequence- dependent setup and learning effects Inf Process Lett 102 22 26 1184.68132 10.1016/j.ipl.2006.11.002 2294778 (Pubitemid 46186360)
-
(2007)
Information Processing Letters
, vol.102
, Issue.1
, pp. 22-26
-
-
Kuo, W.-H.1
Yang, D.-L.2
-
5
-
-
53049086739
-
Single-machine scheduling with pastsequence- dependent setup times and time-dependent learning effect
-
10.1016/j.cie.2008.01.017
-
JB Wang 2008 Single-machine scheduling with pastsequence- dependent setup times and time-dependent learning effect Comput Ind Eng 55 584 591 10.1016/j.cie.2008.01.017
-
(2008)
Comput Ind Eng
, vol.55
, pp. 584-591
-
-
Wang, J.B.1
-
6
-
-
63449134462
-
Single machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning
-
10.1007/s00170-008-1512-7
-
JB Wang Y Jiang G Wang 2009 Single machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning Int J Adv Manuf Technol 41 1221 1226 10.1007/s00170-008-1512-7
-
(2009)
Int J Adv Manuf Technol
, vol.41
, pp. 1221-1226
-
-
Wang, J.B.1
Jiang, Y.2
Wang, G.3
-
7
-
-
0032649356
-
The economic manufacture/order quantity (EMQ/EOQ) and the learning curve: Past, present, and future
-
10.1016/S0925-5273(98)00027-9
-
YM Jaber M Bonney 1999 The economic manufacture/order quantity (EMQ/EOQ) and the learning curve: past, present, and future Int J Prod Econ 59 93 102 10.1016/S0925-5273(98)00027-9
-
(1999)
Int J Prod Econ
, vol.59
, pp. 93-102
-
-
Jaber, Y.M.1
Bonney, M.2
-
8
-
-
0345201636
-
Single-machine scheduling with learning considerations
-
0946.90025 10.1016/S0377-2217(98)00246-X
-
D Biskup 1999 Single-machine scheduling with learning considerations Eur J Oper Res 115 173 178 0946.90025 10.1016/S0377-2217(98)00246-X
-
(1999)
Eur J Oper Res
, vol.115
, pp. 173-178
-
-
Biskup, D.1
-
9
-
-
0034563358
-
Single Machine Scheduling with Learning Effect Considerations
-
DOI 10.1023/A:1019216726076
-
TCE Cheng G Wang 2000 Single machine scheduling with learning effect considerations Ann Oper Res 98 273 290 0967.68019 10.1023/A:1019216726076 1839885 (Pubitemid 33282737)
-
(2000)
Annals of Operations Research
, vol.98
, Issue.1-4
, pp. 273-290
-
-
Cheng, T.C.E.1
Wang, G.2
-
10
-
-
0035427775
-
Scheduling problems with a learning effect
-
DOI 10.1016/S0377-2217(00)00175-2, PII S0377221700001752
-
G Mosheiov 2001 Scheduling problems with a learning effect Eur J Oper Res 132 687 692 1017.90051 10.1016/S0377-2217(00)00175-2 1832521 (Pubitemid 32487108)
-
(2001)
European Journal of Operational Research
, vol.132
, Issue.3
, pp. 687-693
-
-
Mosheiov, G.1
-
11
-
-
0037449223
-
Scheduling with general job-dependent learning curves
-
1037.90529 10.1016/S0377-2217(02)00358-2 1965663
-
G Mosheiov JB Sidney 2003 Scheduling with general job-dependent learning curves Eur J Oper Res 147 665 670 1037.90529 10.1016/S0377-2217(02)00358-2 1965663
-
(2003)
Eur J Oper Res
, vol.147
, pp. 665-670
-
-
Mosheiov, G.1
Sidney, J.B.2
-
12
-
-
34547242463
-
Complexity results for single-machine scheduling with positional learning effects
-
DOI 10.1057/palgrave.jors.2602227, PII 2602227
-
BMT Lin 2007 Complexity results for single-machine scheduling with positional learning effects J Oper Res Soc 58 1099 1102 05251884 10.1057/palgrave.jors.2602227 (Pubitemid 47150129)
-
(2007)
Journal of the Operational Research Society
, vol.58
, Issue.8
, pp. 1099-1102
-
-
Lin, B.M.T.1
-
13
-
-
21144435406
-
A bi-criterion single-machine scheduling problem with learning considerations
-
DOI 10.1007/s00236-003-0132-9
-
WC Lee CC Wu HJ Sung 2004 A bi-criterion single-machine scheduling problem with learning considerations Acta Informatica 40 303 315 1137.90500 10.1007/s00236-003-0132-9 2037360 (Pubitemid 40877251)
-
(2004)
Acta Informatica
, vol.40
, Issue.4
, pp. 303-315
-
-
Lee, W.-C.1
Wu, C.-C.2
Sung, H.-J.3
-
14
-
-
60749100763
-
A bicriteria parallel machine scheduling with a learning effect
-
10.1007/s00170-008-1436-2
-
T Eren E Güner 2009 A bicriteria parallel machine scheduling with a learning effect Int J Adv Manuf Technol 40 1202 1205 10.1007/s00170-008-1436-2
-
(2009)
Int J Adv Manuf Technol
, vol.40
, pp. 1202-1205
-
-
Eren, T.1
Güner, E.2
-
15
-
-
34250846679
-
A note on single-machine scheduling with learning effect and an availability constraint
-
DOI 10.1007/s00170-006-0469-7
-
CC Wu WC Lee 2007 A note on single-machine scheduling with learning effect and an availability constraint Int J Adv Manuf Technol 33 540 544 10.1007/s00170-006-0469-7 10.1007/s00170-006-0469-7 (Pubitemid 46972375)
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.33
, Issue.5-6
, pp. 540-544
-
-
Wu, C.-C.1
Lee, W.-C.2
-
17
-
-
70449518311
-
Scheduling problems with the nonlinear effects of learning and deterioration
-
10.1007/s00170-009-2016-9
-
MD Toksar E Güner 2009 Scheduling problems with the nonlinear effects of learning and deterioration Int J Adv Manuf Technol. 10.1007/s00170-009-2016-9
-
(2009)
Int J Adv Manuf Technol.
-
-
Toksar, M.D.1
Güner, E.2
-
18
-
-
33746239045
-
Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect
-
DOI 10.1016/j.ejor.2005.03.020, PII S0377221705003401
-
WH Kuo DL Yang 2006 Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect Eur J Oper Res 174 1184 1190 1103.90341 10.1016/j.ejor.2005.03.020 2251152 (Pubitemid 44093906)
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.2
, pp. 1184-1190
-
-
Kuo, W.-H.1
Yang, D.-L.2
-
19
-
-
29144506060
-
Single-machine group scheduling with a time-dependent learning effect
-
DOI 10.1016/j.cor.2004.11.024, PII S0305054804003260
-
WH Kuo DL Yang 2006 Single-machine group scheduling with a time-dependent learning effect Comput Oper Res 33 2099 2112 1086.90025 10.1016/j.cor.2004.11. 024 (Pubitemid 41802279)
-
(2006)
Computers and Operations Research
, vol.33
, Issue.8
, pp. 2099-2112
-
-
Kuo, W.-H.1
Yang, D.-L.2
-
20
-
-
33750993497
-
Single-machine and two-machine flowshop scheduling with general learning functions
-
DOI 10.1016/j.ejor.2006.01.030, PII S0377221706001135
-
C Koulamas GJ Kyparisis 2007 Single-machine and two-machine flowshop scheduling with general learning functions Eur J Oper Res 178 402 407 1107.90018 10.1016/j.ejor.2006.01.030 2281493 (Pubitemid 44750487)
-
(2007)
European Journal of Operational Research
, vol.178
, Issue.2
, pp. 402-407
-
-
Koulamas, C.1
Kyparisis, G.J.2
-
21
-
-
71949095435
-
Single-machine scheduling with a sum-of-processing-time based learning effect and deteriorating jobs
-
10.1007/s00170-009-1950-x
-
LY Wang JB Wang D Wang N Yin X Huang EM Feng 2009 Single-machine scheduling with a sum-of-processing-time based learning effect and deteriorating jobs Int J Adv Manuf Technol 10.1007/s00170-009-1950-x
-
(2009)
Int J Adv Manuf Technol
-
-
Wang, L.Y.1
Wang, J.B.2
Wang, D.3
Yin, N.4
Huang, X.5
Feng, E.M.6
-
22
-
-
40649107395
-
Single-machine scheduling problems with a learning effect
-
DOI 10.1016/j.apm.2007.03.001, PII S0307904X07000790
-
CC Wu WC Lee 2008 Single-machine scheduling problems with a learning effect Appl Math Model 32 1191 1197 1172.90415 10.1016/j.apm.2007.03.001 2409375 (Pubitemid 351372890)
-
(2008)
Applied Mathematical Modelling
, vol.32
, Issue.7
, pp. 1191-1197
-
-
Wu, C.-C.1
Lee, W.-C.2
-
23
-
-
40849111346
-
Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects
-
1172.90397 10.1016/j.ins.2008.02.002 2416993
-
TCE Cheng CC Wu WC Lee 2008 Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects Inf Sci 178 2476 2487 1172.90397 10.1016/j.ins.2008.02.002 2416993
-
(2008)
Inf Sci
, vol.178
, pp. 2476-2487
-
-
Cheng, T.C.E.1
Wu, C.C.2
Lee, W.C.3
-
24
-
-
67349130285
-
Some scheduling problems with general position-dependent and time-dependent learning effects
-
1166.90342 10.1016/j.ins.2009.02.015 2554688
-
Y Yin D Xu K Sun H Li 2009 Some scheduling problems with general position-dependent and time-dependent learning effects Inf Sci 179 2416 2425 1166.90342 10.1016/j.ins.2009.02.015 2554688
-
(2009)
Inf Sci
, vol.179
, pp. 2416-2425
-
-
Yin, Y.1
Xu, D.2
Sun, K.3
Li, H.4
-
25
-
-
38149027740
-
A state-of-the-art review on scheduling with learning effects
-
1129.90022 10.1016/j.ejor.2007.05.040 2384086
-
D Biskup 2008 A state-of-the-art review on scheduling with learning effects Eur J Oper Res 188 315 329 1129.90022 10.1016/j.ejor.2007.05.040 2384086
-
(2008)
Eur J Oper Res
, vol.188
, pp. 315-329
-
-
Biskup, D.1
-
26
-
-
35448998982
-
Single-machine scheduling with an actual time-dependent learning effect
-
DOI 10.1057/palgrave.jors.2602276, PII 2602276
-
DL Yang WH Kuo 2007 Single-machine scheduling with an actual time-dependent learning effect J Oper Res Soc 58 1348 1353 1154.90505 10.1057/palgrave.jors.2602276 (Pubitemid 47619734)
-
(2007)
Journal of the Operational Research Society
, vol.58
, Issue.10
, pp. 1348-1353
-
-
Yang, D.-L.1
Kuo, W.-H.2
-
27
-
-
0017921371
-
The single machine problem with quadratic penalty function of completion times: A branch-and-bound solution
-
0371.90065 10.1287/mnsc.24.5.530
-
W Townsend 1978 The single machine problem with quadratic penalty function of completion times: a branch-and-bound solution Manage Sci 24 530 533 0371.90065 10.1287/mnsc.24.5.530
-
(1978)
Manage Sci
, vol.24
, pp. 530-533
-
-
Townsend, W.1
|