메뉴 건너뛰기




Volumn 49, Issue 5-8, 2010, Pages 689-695

Multi-agent-based fuzzy scheduling for shop floor

Author keywords

Fuzzy contract net protocol; Fuzzy programming; Multi agent; Scheduling strategy

Indexed keywords

CONTRACT NET PROTOCOLS; FUZZY PROGRAMMING; FUZZY SCHEDULING; FUZZY THEORY; HIERARCHICAL STRUCTURES; HYBRID STRATEGIES; MULTI-AGENT; MULTI-AGENT SCHEDULING; MULTIAGENT ARCHITECTURE; SCHEDULING STRATEGIES; SHOP FLOOR; STATIC PROGRAMMING;

EID: 77953609811     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-009-2410-3     Document Type: Article
Times cited : (11)

References (13)
  • 2
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic job-shop scheduling: Past, present and future
    • 0938.90028 10.1016/S0377-2217(98)00113-1
    • AS Jain S Meeran 1999 Deterministic job-shop scheduling: past, present and future Eur J Oper Res 113 390 434 0938.90028 10.1016/S0377-2217(98)00113-1
    • (1999) Eur J Oper Res , vol.113 , pp. 390-434
    • Jain, A.S.1    Meeran, S.2
  • 3
    • 33750480564 scopus 로고    scopus 로고
    • Applications of agent-based systems in intelligent manufacturing: An updated review
    • DOI 10.1016/j.aei.2006.05.004, PII S1474034606000292
    • W Shen Q Hao HJ Yoon DH Norrie 2006 Applications of agent-based systems in intelligent manufacturing: an updated review Adv Eng Informatics 20 415 431 10.1016/j.aei.2006.05.004 (Pubitemid 44646895)
    • (2006) Advanced Engineering Informatics , vol.20 , Issue.4 , pp. 415-431
    • Shen, W.1    Hao, Q.2    Yoon, H.J.3    Norrie, D.H.4
  • 4
    • 0033692343 scopus 로고    scopus 로고
    • Multi-Agent architecture for distributed monitoring in flexible manufacturing system
    • San Francisco, USA
    • Ouelhadj D, Hanachi C, Bouzouia B (2000) Multi-Agent architecture for distributed monitoring in flexible manufacturing system. Proceedings of IEEE Int Confon Robotics & Automation, San Francisco, USA, pp 2416-2421
    • (2000) Proceedings of IEEE Int Confon Robotics & Automation , pp. 2416-2421
    • Ouelhadj, D.1    Hanachi, C.2    Bouzouia, B.3
  • 5
    • 70350504948 scopus 로고    scopus 로고
    • Multi-agent based manufacturing structure and scheduling for job-shop
    • (in Chinese)
    • Y Li S Yang 2005 Multi-agent based manufacturing structure and scheduling for job-shop Transaction of Heifei University of Technology 28 5 541 545 (in Chinese)
    • (2005) Transaction of Heifei University of Technology , vol.28 , Issue.5 , pp. 541-545
    • Li, Y.1    Yang, S.2
  • 6
    • 0037494853 scopus 로고    scopus 로고
    • Constructing a job-shop scheduling model based on imprecise data
    • St. Louis, MO, USA
    • Lin F-T (2003) Constructing a job-shop scheduling model based on imprecise data. The IEEE International Conference on Fuzzy Systems, St. Louis, MO, USA, pp 1374-1379
    • (2003) The IEEE International Conference on Fuzzy Systems , pp. 1374-1379
    • Lin, F.-T.1
  • 8
    • 0038479948 scopus 로고    scopus 로고
    • Generating robust and flexible job shop schedules using genetic algorithms
    • 10.1109/TEVC.2003.810067
    • MT Jensen 2003 Generating robust and flexible job shop schedules using genetic algorithms IEEE Trans Evol Comput 7 3 275 288 10.1109/TEVC.2003.810067
    • (2003) IEEE Trans Evol Comput , vol.7 , Issue.3 , pp. 275-288
    • Jensen, M.T.1
  • 9
    • 0033881797 scopus 로고    scopus 로고
    • Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
    • DOI 10.1016/S0377-2217(99)00094-6
    • M Sakawa R Kubota 2000 Fuzzy programming for multi-objective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms Eur J Oper Res 120 393 407 0954.90071 10.1016/S0377-2217(99)00094-6 1783303 (Pubitemid 30542643)
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 393-407
    • Sakawa, M.1    Kubota, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.