|
Volumn 15, Issue 4, 2010, Pages 364-372
|
Evaluation, rehabilitation planning, and stay-cable replacement design for the hale boggs bridge in Luling, Louisiana
|
Author keywords
Cable replacement design; Cable stayed bridge; Stay cable
|
Indexed keywords
BEST VALUE;
BRIDGE STRUCTURES;
CABLE REPLACEMENT;
CABLE REPLACEMENT DESIGN;
CONDITION ASSESSMENTS;
CROSSING OVER;
DESIGN CONSIDERATIONS;
DESIGN LIFE;
HURRICANE EVACUATION;
LOUISIANA;
MISSISSIPPI RIVER;
REHABILITATION PLANNING;
REHABILITATION STRATEGY;
RIVER CROSSINGS;
STAY CABLE;
TENSION ELEMENTS;
TRAFFIC DESIGN;
USING LIFE;
BRIDGE CABLES;
BRIDGES;
CABLE STAYED BRIDGES;
COST ACCOUNTING;
DESIGN;
REPAIR;
CROSSINGS (PIPE AND CABLE);
|
EID: 77953580295
PISSN: 10840702
EISSN: None
Source Type: Journal
DOI: 10.1061/(ASCE)BE.1943-5592.0000061 Document Type: Article |
Times cited : (60)
|
References (5)
|