메뉴 건너뛰기




Volumn , Issue , 2010, Pages 331-336

Fuzzy and dynamic flexible job-shop scheduling with multi-object and multi-constraints

Author keywords

Alternative machines; Fuzzy due date; Genetic algorithm; Multi objective optimization; Setup time; Submitted time

Indexed keywords

CUSTOMER SATISFACTION; DYNAMICS; GENETIC ALGORITHMS; MANUFACTURE; MULTIOBJECTIVE OPTIMIZATION; SCHEDULING;

EID: 77953386155     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1115/1.859544.paper52     Document Type: Conference Paper
Times cited : (4)

References (12)
  • 1
    • 77953406409 scopus 로고    scopus 로고
    • A Single-machine Scheduling Problem with Fuzzy Due-dates
    • J
    • WU Huijiang. A Single-machine Scheduling Problem with Fuzzy Due-dates [J]. Science Technology and Engineering. 2005,5(9):592-593
    • (2005) Science Technology and Engineering , vol.5 , Issue.9 , pp. 592-593
    • Wu, H.1
  • 2
    • 33646384192 scopus 로고    scopus 로고
    • The Single Machine Scheduling Problem with Fuzzy Processing Times and/or Fuzzy Due Dates
    • J
    • XIE Yuan, XIE Jian-ying, DENG Xiao-long. The Single Machine Scheduling Problem with Fuzzy Processing Times and/or Fuzzy Due Dates [J]. Journal of Shanghai Jiaotong University. 2005, (8): 159-162
    • (2005) Journal of Shanghai Jiaotong University , Issue.8 , pp. 159-162
    • Xie, Y.1    Xie, J.-Y.2    Deng, X.-L.3
  • 3
    • 77953442797 scopus 로고    scopus 로고
    • Fuzzy Single Machine Scheduling Problem with Mixed Precedence Constraints and Fuzzy Due Dates
    • J
    • XIE Yuan, XIE Jian-ying, Fuzzy Single Machine Scheduling Problem with Mixed Precedence Constraints and Fuzzy Due Dates [J]. Journal of Shanghai Jiaotong University.2005, 34(3):369-372
    • (2005) Journal of Shanghai Jiaotong University , vol.34 , Issue.3 , pp. 369-372
    • Xie, Y.1    Xie, J.-Y.2
  • 4
    • 77953368541 scopus 로고    scopus 로고
    • Flexible Job Shop Scheduling with Fuzzy Objectives Based on Genetic Algorithm
    • J
    • Yuan Kun, Zhu Jianying, Wang Xiyang. Flexible Job Shop Scheduling with Fuzzy Objectives Based on Genetic Algorithm [J]. Mechanical Science and Technology. 2006,25(10):1135-1138
    • (2006) Mechanical Science and Technology , vol.25 , Issue.10 , pp. 1135-1138
    • Yuan, K.1    Zhu, J.2    Wang, X.3
  • 5
    • 33746559361 scopus 로고    scopus 로고
    • Research on multi-objective optimization for flexible job shop scheduling
    • J
    • WU Xiu-li, SUN Shu-dong, YU Jian-jun, etc. Research on multi-objective optimization for flexible job shop scheduling [J]. Computer Integrated Manufacturing Systems, 2006,12(5):731-736
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.5 , pp. 731-736
    • Wu, X.-L.1    Sun, S.-D.2    Yu, J.-J.3
  • 6
    • 41649118032 scopus 로고    scopus 로고
    • Research on Multi-objective Scheduling Optimization for Flexible Job Shop
    • J
    • LIU Xiao-xia, XIE Li-yang, TAO Ze, etc. Research on Multi-objective Scheduling Optimization for Flexible Job Shop [J]. Journal of Northeastern University (Natural Science),2008,29(3):362-365
    • (2008) Journal of Northeastern University (Natural Science) , vol.29 , Issue.3 , pp. 362-365
    • Liu, X.-X.1    Xie, L.-Y.2    Tao, Z.3
  • 7
    • 57649085050 scopus 로고    scopus 로고
    • Study of Multi-objective Flexible Job Shop Scheduling Based on Immune Genetic Algorithm
    • J
    • ZHAO Han, GAO Xian-sheng, JIANG Kang, etc. Study of Multi-objective Flexible Job Shop Scheduling Based on Immune Genetic Algorithm[J]. Journal of System Simulation, 2008,20(22):6163-6168.
    • (2008) Journal of System Simulation , vol.20 , Issue.22 , pp. 6163-6168
    • Zhao, H.1    Gao, X.-S.2    Jiang, K.3
  • 8
    • 70449805970 scopus 로고    scopus 로고
    • Based on an Improved genetic Algorithm for Flexible Job Shop Scheduling Problem
    • J
    • HAN Wen-ming; FAN Ji-wen. Based on an Improved genetic Algorithm for Flexible Job Shop Scheduling Problem[J]. Science Technology and Engineering, 2008, 8(22):6135-6137
    • (2008) Science Technology and Engineering , vol.8 , Issue.22 , pp. 6135-6137
    • Han, W.-M.1    Fan, J.-W.2
  • 9
    • 33646356482 scopus 로고    scopus 로고
    • Research on fuzzy job shop scheduling with alternative machines
    • J
    • LI Fu-ming, ZHU Yun-long, YIN Chao-wan, etc. Research on fuzzy job shop scheduling with alternative machines [J]. Computer Integrated Manufacturing Systems, 2006,12(2): 169-173
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.2 , pp. 169-173
    • Li, F.-M.1    Zhu, Y.-L.2    Yin, C.-W.3
  • 10
    • 77953398937 scopus 로고    scopus 로고
    • Quantum particle swarm optimization for flow-shop scheduling problem with fuzzy delivery time
    • J
    • SONG Shu-qiang,YE Chun-ming. Quantum particle swarm optimization for flow-shop scheduling problem with fuzzy delivery time[J]. Computer Engineering and Applications, 2009,45 (6):246-248
    • (2009) Computer Engineering and Applications , vol.45 , Issue.6 , pp. 246-248
    • Song, S.-Q.1    Ye, C.-M.2
  • 11
    • 77953443940 scopus 로고    scopus 로고
    • A Genetic Algorithm for Job-shop Scheduling Problem with Alternative Machine
    • J
    • BAI Yin, SHANG Wen-li, WANG Cheng-en. A Genetic Algorithm for Job-shop Scheduling Problem with Alternative Machine[J]. Information and Control, 2004,32(5):604-608.
    • (2004) Information and Control , vol.32 , Issue.5 , pp. 604-608
    • Bai, Y.1    Shang, W.-L.2    Wang, C.-E.3
  • 12
    • 0035546051 scopus 로고    scopus 로고
    • Job shop scheduling with alternative process plans
    • J
    • CHRISTOPH S, THOMALLA. Job shop scheduling with alternative process plans [J]. International Journal of Production Economics, 2001, 74(1): 125-134.
    • (2001) International Journal of Production Economics , vol.74 , Issue.1 , pp. 125-134
    • Thomalla, C.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.