메뉴 건너뛰기




Volumn , Issue , 2009, Pages 4270-4274

Dynamic risk assessment for excavation engineering based on human factors

Author keywords

Consequences; Dynamic risk analysis; Human factors; Probability; Risk

Indexed keywords

CONSEQUENCES; CONSTRUCTION TIME; ENTROPY WEIGHTS; EXCAVATION ENGINEERING; FAILURE PROBABILITY; FOUNDATION PITS; HUMAN ERRORS; HUMAN FACTORS; POTENTIAL RISKS; QUANTITATIVE ANALYSIS; WORKING PROCEDURE;

EID: 77952783981     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICISE.2009.523     Document Type: Conference Paper
Times cited : (4)

References (8)
  • 1
    • 0035402008 scopus 로고    scopus 로고
    • Human factors engineering in utility tunnel design
    • DOI 10.1016/S0886-7798(01)00041-4, PII S0886779801000414
    • Canto-Perello J., Curiel-Esparza J., "Human factors engineering in utility tunnel design". Tunnelling and Underground Space Technology, 2001, 16, pp.211-215. (Pubitemid 33119391)
    • (2001) Tunnelling and Underground Space Technology , vol.16 , Issue.3 , pp. 211-215
    • Canto-Perello, J.1    Curiel-Esparza, J.2
  • 4
    • 0346255637 scopus 로고    scopus 로고
    • Perception of human risk factors in construction projects: An exploratory study
    • Vicknayson T.M.J., "Perception of human risk factors in construction projects: an exploratory study". International Journal of Project Management, 2004, 22, pp.131-137.
    • (2004) International Journal of Project Management , vol.22 , pp. 131-137
    • Vicknayson, T.M.J.1
  • 5
    • 0347412034 scopus 로고    scopus 로고
    • Human error risk management for engineering systems: A methodology for design, safety assessment, accident investigation and training
    • Cacciabue P. C., "Human error risk management for engineering systems: a methodology for design, safety assessment, accident investigation and training". Reliability Engineering & System Safety, 2004, 83(2), pp.229-240.
    • (2004) Reliability Engineering & System Safety , vol.83 , Issue.2 , pp. 229-240
    • Cacciabue, P.C.1
  • 6
    • 84856043672 scopus 로고
    • The mathematical theory of communication
    • Shannon C.E., "The mathematical theory of communication". Bell System Technical Journa, 1948, 27, pp. 379-423.
    • (1948) Bell System Technical Journa , vol.27 , pp. 379-423
    • Shannon, C.E.1
  • 7
    • 11944266539 scopus 로고
    • Information theory & statistical mechanics
    • 108 pp. 171-190.
    • Jaynes E.T., "Information theory & statistical mechanics". The Physical Review, 1957, 166, pp. 620-630, & 108, pp. 171-190.
    • (1957) The Physical Review , vol.166 , pp. 620-630
    • Jaynes, E.T.1
  • 8
    • 0013337442 scopus 로고    scopus 로고
    • A Proposal for Construction Project Risk Assessment Using Fuzzy Logic
    • Tah J.H.M., Carr V., "A Proposal for Construction Project Risk Assessment Using Fuzzy Logic". Construction Management and Economics, 2000, 18(4), pp.491-500.
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 491-500
    • Tah, J.H.M.1    Carr, V.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.