메뉴 건너뛰기




Volumn , Issue , 2009, Pages 60-65

An intelligent opportunistic maintenance (OM) system: A genetic algorithm approach

Author keywords

Genetic algorithms; Opportunistic maintenance

Indexed keywords

COMPLEX SYSTEMS; CONDITION-BASED MAINTENANCE; CORRECTIVE MAINTENANCE; COST EFFECTIVE; GENETIC ALGORITHM APPROACH; HIGH RELIABILITY; IN-PROCESS; INTELLIGENT METHOD; IS COSTS; MAINTENANCE STAFF; MAINTENANCE STRATEGIES; NUCLEAR POWER STATION; OPPORTUNISTIC MAINTENANCE; PROCESS INDUSTRIES; SAFETY REQUIREMENTS;

EID: 77952733701     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/TIC-STH.2009.5444428     Document Type: Conference Paper
Times cited : (18)

References (7)
  • 1
    • 0343788059 scopus 로고
    • Optimal, opportunistic maintenance policy using genetic algorithms, 2: Analysis
    • A. Savic, G. Walters, and J. Knezevic, "Optimal, opportunistic maintenance policy using genetic algorithms, 2: analysis," J. of Quality in Maintenance Engineering, vol. 1, no. 3, pp. 25-34, 1995.
    • (1995) J. of Quality in Maintenance Engineering , vol.1 , Issue.3 , pp. 25-34
    • Savic, A.1    Walters, G.2    Knezevic, J.3
  • 2
    • 0034135249 scopus 로고    scopus 로고
    • Age related maintenance versus reliability centered maintenance: A case study on aero-engines
    • J. Crocker, and U, Kumar, "Age related maintenance versus reliability centered maintenance: a case study on aero-engines," J. of Reliability Engineering and Systems Safety, vol. 67, no. 2, pp. 113-118, 2000.
    • (2000) J. of Reliability Engineering and Systems Safety , vol.67 , Issue.2 , pp. 113-118
    • Crocker, J.1    Kumar, U.2
  • 4
    • 33746917131 scopus 로고    scopus 로고
    • A dynamic opportunistic maintenance policy for continuously monitored systems
    • X. Zhaou, L. Xi, and J. Lee, "A dynamic opportunistic maintenance policy for continuously monitored systems," Trans. J. of Quality Management Engineering, vol. 12, no. 3, pp. 294 - 305, 2006.
    • (2006) Trans. J. of Quality Management Engineering , vol.12 , Issue.3 , pp. 294-305
    • Zhaou, X.1    Xi, L.2    Lee, J.3
  • 5
    • 33746052471 scopus 로고    scopus 로고
    • Opportunistic maintenance for multi-component shock models
    • L. Cui, and H. Li, "Opportunistic maintenance for multi-component shock models," J. of Mathematical Methods of Operations Research, vol. 63, no. 3, pp. 180 - 191, 2006.
    • (2006) J. of Mathematical Methods of Operations Research , vol.63 , Issue.3 , pp. 180-191
    • Cui, L.1    Li, H.2
  • 6
    • 77952687279 scopus 로고    scopus 로고
    • Opportunistic preventive maintenance scheduling for a multi-unit Series system based on dynamic programming
    • In Press
    • X. Zhaou, L. Xi, and J. Lee, "Opportunistic preventive maintenance scheduling for a multi-unit Series system based on dynamic programming," Intl. J. Production Economies, In Press, 2008.
    • (2008) Intl. J. Production Economies
    • Zhaou, X.1    Xi, L.2    Lee, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.