메뉴 건너뛰기




Volumn 48, Issue 13, 2010, Pages 3741-3757

Three-dimensional model of customer order decoupling point position in mass customisation

Author keywords

Customer order decoupling point (CODP); Customer requirements; Mass customisation

Indexed keywords

CONCEPT-BASED; CUSTOMER ORDER DECOUPLING POINT; CUSTOMER REQUIREMENTS; CUSTOMER VALUES; DELIVERY LEAD TIME; GENERAL APPROACH; MANUFACTURING SYSTEM; MASS CUSTOMISATION; PRODUCTION ACTIVITY; THREE-DIMENSIONAL MODEL;

EID: 77952624641     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540902865746     Document Type: Article
Times cited : (15)

References (36)
  • 2
    • 38149147898 scopus 로고
    • Linking manufacturing strategy to the design of a customised hybrid production control system
    • Bhattacharya, A. K. and Coleman, J. L., 1994. Linking manufacturing strategy to the design of a customised hybrid production control system. Computer Integrated Manufacturing Systems, 7 (2), 134-141.
    • (1994) Computer Integrated Manufacturing Systems , vol.7 , Issue.2 , pp. 134-141
    • Bhattacharya, A.K.1    Coleman, J.L.2
  • 4
    • 0003044226 scopus 로고
    • Postponement, speculation and the structure of distribution channels
    • Bucklin, L., 1965. Postponement, speculation and the structure of distribution channels. Journal of Marketing Research, 2, 26-31.
    • (1965) Journal of Marketing Research , vol.2 , pp. 26-31
    • Bucklin, L.1
  • 5
    • 77952601204 scopus 로고    scopus 로고
    • Cox, J. F. and Blackstone Jr, J. H., eds., 10th ed, Falls Church, VA APICS
    • Cox, J. F. and Blackstone Jr, J. H., eds., 2002. APICS dictionary, 10th ed. Falls Church, VA APICS.
    • (2002) APICS Dictionary
  • 6
    • 0242269854 scopus 로고    scopus 로고
    • Flexibility-driven index for measuring mass customisation feasibility on industrialised products
    • Fogliatto, F. S., Da Silveira, G. J. C., and Royer, R., 2003. Flexibility-driven index for measuring mass customisation feasibility on industrialised products. International Journal of Production Research, 41 (8), 1811-1829.
    • (2003) International Journal of Production Research , vol.41 , Issue.8 , pp. 1811-1829
    • Fogliatto, F.S.1    Silveira, D.G.J.C.2    Royer, R.3
  • 7
    • 0000535028 scopus 로고
    • Dynamics of the customer order decoupling point: Impact on information systems for production control
    • Giesberts, P. M. J. and van den Tang, L., 1992. Dynamics of the customer order decoupling point: impact on information systems for production control. Production Planning & Control, 3 (3), 300-313.
    • (1992) Production Planning & Control , vol.3 , Issue.3 , pp. 300-313
    • Giesberts, P.M.J.1    Van Den Tang, D.L.2
  • 13
    • 77952662879 scopus 로고    scopus 로고
    • The supply chain management system for mass dynamic customisation based on GDSS
    • Lin, J., Jiang, J. J., and Xu, H., 2004. The supply chain management system for mass dynamic customisation based on GDSS. Industrial Engineering and Management, 1, 63-67.
    • (2004) Industrial Engineering and Management , vol.1 , pp. 63-67
    • Lin, J.1    Jiang, J.J.2    Xu, H.3
  • 14
    • 84993009244 scopus 로고    scopus 로고
    • Using the information decoupling point to improve supply chain performance
    • Mason-Jones, R. and Towill, D. R., 1999. Using the information decoupling point to improve supply chain performance. International Journal of Logistics Management, 10 (2), 13-26.
    • (1999) International Journal of Logistics Management , vol.10 , Issue.2 , pp. 13-26
    • Mason-Jones, R.1    Towill, D.R.2
  • 16
    • 0344240982 scopus 로고    scopus 로고
    • Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain
    • Naylor, J. B., Naim, M. M., and Berry, D., 1999. Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain. International Journal of Production Economics, 62 (1/2), 107-118.
    • (1999) International Journal of Production Economics , vol.62 , Issue.1-2 , pp. 107-118
    • Naylor, J.B.1    Naim, M.M.2    Berry, D.3
  • 17
    • 0037575175 scopus 로고
    • On the positioning of the customer order decoupling point
    • Jakarta, Indonesia, The Institution of Engineers
    • Olhager, J., 1994. On the positioning of the customer order decoupling point. Proceedings of the 1994 Pacific Conference on Manufacturing, Jakarta, Indonesia, The Institution of Engineers, 1093-1100.
    • (1994) Proceedings of the 1994 Pacific Conference on Manufacturing , pp. 1093-1100
    • Olhager, J.1
  • 18
    • 0035152163 scopus 로고    scopus 로고
    • Long-term capacity management: Linking the perspectives from manufacturing strategy and sales and operations planning
    • Olhager, J., Rudberg, M., and Wikner, J., 2001. Long-term capacity management: Linking the perspectives from manufacturing strategy and sales and operations planning. International Journal of Production Economics, 69 (2), 215-225.
    • (2001) International Journal of Production Economics , vol.69 , Issue.2 , pp. 215-225
    • Olhager, J.1    Rudberg, M.2    Wikner, J.3
  • 19
    • 0037810496 scopus 로고    scopus 로고
    • Strategic positioning of the order penetration point
    • Olhager, J., 2003. Strategic positioning of the order penetration point. International Journal of Production Economics, 85 (3), 319-29.
    • (2003) International Journal of Production Economics , vol.85 , Issue.3 , pp. 319-29
    • Olhager, J.1
  • 21
    • 38249020565 scopus 로고
    • Coping with the build-to forecast environment
    • Raturi, A. S., et al., 1990. Coping with the build-to forecast environment. Journal of Operations Management, 9, 230-249.
    • (1990) Journal of Operations Management , vol.9 , pp. 230-249
    • Raturi, A.S.1
  • 22
    • 3142674870 scopus 로고    scopus 로고
    • Mass customisation in terms of the customer order decoupling point
    • Rudberg, M. and Wikner, J., 2004. Mass customisation in terms of the customer order decoupling point. Production Planning & Control, 15 (4), 445-458.
    • (2004) Production Planning & Control , vol.15 , Issue.4 , pp. 445-458
    • Rudberg, M.1    Wikner, J.2
  • 24
    • 36248953253 scopus 로고    scopus 로고
    • Evaluation of postponement strategies in mass customisation with service guarantees
    • Shao, X. F. and Ji, J. H., 2008. Evaluation of postponement strategies in mass customisation with service guarantees. International Journal of Production Research, 46 (1), 153-171.
    • (2008) International Journal of Production Research , vol.46 , Issue.1 , pp. 153-171
    • Shao, X.F.1    Ji, J.H.2
  • 25
    • 0002249048 scopus 로고
    • The rediscovery of logistics
    • Sharman, G., 1984. The rediscovery of logistics. Harvard Business Review, 62 (5), 71-80.
    • (1984) Harvard Business Review , vol.62 , Issue.5 , pp. 71-80
    • Sharman, G.1
  • 27
    • 33645362289 scopus 로고    scopus 로고
    • Supply chain operations: Assemble-to-order and configure-to-order systems
    • In: S. C. Graves and A. G. e Kok, eds, North Holland: Elsevier Science Publishers
    • Song, J.-S. and Zipkin, P., 2003. Supply chain operations: Assemble-to-order and configure-to-order systems, In: S. C. Graves and A. G. e Kok, eds. Handbooks in operations research and management science: Design and analysis of supply chains. North Holland: Elsevier Science Publishers.
    • (2003) Handbooks in Operations Research and Management Science: Design and Analysis of Supply Chains
    • Song, J.-S.1    Zipkin, P.2
  • 29
    • 0001827031 scopus 로고
    • Time - The next source of competitive advantage
    • July/August
    • Stalk, G., 1988. Time - the next source of competitive advantage. Harvard Business Review, July/August, 66 (4), 41-51.
    • (1988) Harvard Business Review , vol.66 , Issue.4 , pp. 41-51
    • Stalk, G.1
  • 30
    • 0032292446 scopus 로고    scopus 로고
    • Managing broader product lines through delayed differentiation using vanilla boxes
    • Swaminathan, J. M. and Tayur, S. R., 1998. Managing broader product lines through delayed differentiation using vanilla boxes. Management Science, 44, S161-S172.
    • (1998) Management Science , vol.44
    • Swaminathan, J.M.1    Tayur, S.R.2
  • 31
    • 0035852790 scopus 로고    scopus 로고
    • Make to stock or make to order: The decoupling point in the food processing industries
    • Van Donk, D. P., 2001. Make to stock or make to order: the decoupling point in the food processing industries. International Journal of Production Economics, 69 (3), 297-306.
    • (2001) International Journal of Production Economics , vol.69 , Issue.3 , pp. 297-306
    • Van Donk, D.P.1
  • 32
    • 0037943470 scopus 로고
    • Assemble-to-order manufacturing: Implications for materials management
    • Wemmerlov, U., 1984. Assemble-to-order manufacturing: Implications for materials management. Journal of Operations Management, 4 (4), 347-368.
    • (1984) Journal of Operations Management , vol.4 , Issue.4 , pp. 347-368
    • Wemmerlov, U.1
  • 34
    • 34548476160 scopus 로고    scopus 로고
    • Introducing a customer order decoupling zone in logistics decision-making
    • Wikner, J. and Rudberg, M., 2005. Introducing a customer order decoupling zone in logistics decision-making. International Journal of Logistics, 8 (3), 211-224.
    • (2005) International Journal of Logistics , vol.8 , Issue.3 , pp. 211-224
    • Wikner, J.1    Rudberg, M.2
  • 36
    • 0242364640 scopus 로고    scopus 로고
    • Implications of postponement for the supply chain
    • Yang, B. and Burns, N., 2003. Implications of postponement for the supply chain. International Journal of Production Research, 41 (9), 2075-2090.
    • (2003) International Journal of Production Research , vol.41 , Issue.9 , pp. 2075-2090
    • Yang, B.1    Burns, N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.