-
2
-
-
77952347607
-
-
06-2432: Washington
-
Gilbertson, G., U. Attanayake, T. M. Ahlborn, and H. Aktan. 2006. Prestressed Concrete Box-Beam Bridge Performance: Condition Assessment and Design Analysis. 06-2432: pp. 22-23. Washington, DC: Transportation Research Board.
-
(2006)
Prestressed Concrete Box-Beam Bridge Performance: Condition Assessment and Design Analysis.
, pp. 22-23
-
-
Gilbertson, G.1
Attanayake, U.2
Ahlborn, T.M.3
Aktan, H.4
-
3
-
-
0029410943
-
Shear key performance in multibeam box girder bridges
-
(November)
-
Huckelbridge, A. A., H. El-Esnawi, and F. Moses. 1995. Shear Key Performance in Multibeam Box Girder Bridges. Journal of Performance of Constructed Facilities, V. 9, No.4 (November): pp. 271-285.
-
(1995)
Journal of Performance of Constructed Facilities
, vol.9
, Issue.4
, pp. 271-285
-
-
Huckelbridge, A.A.1
El-Esnawi, H.2
Moses, F.3
-
4
-
-
0030777006
-
Behavior of CFRP for prestressing and shear reinforcements of concrete highway bridges
-
(January-February)
-
Fam, A. Z., S. H. Rizkalla, and G. Tadros. 1997. Behavior of CFRP for Prestressing and Shear Reinforcements of Concrete Highway Bridges. ACI Structural Journal, V. 94, No.1 (January-February): pp. 77-86.
-
(1997)
ACI Structural Journal
, vol.94
, Issue.1
, pp. 77-86
-
-
Fam, A.Z.1
Rizkalla, S.H.2
Tadros, G.3
-
6
-
-
0038754966
-
Design approach for carbon fiber-reinforced polymer prestressed concrete bridge beams
-
(May-June)
-
Grace, N. F., and S. B. Singh. 2003. Design Approach for Carbon Fiber-Reinforced Polymer Prestressed Concrete Bridge Beams. ACI Structural Journal, V. 100, No.3, (May-June): pp. 365-376.
-
(2003)
ACI Structural Journal
, vol.100
, Issue.3
, pp. 365-376
-
-
Grace, N.F.1
Singh, S.B.2
-
7
-
-
0036753790
-
Design-construction of bridge street bridge - First CFRP bridge in the United States
-
(September-October)
-
Grace, N. F., F. C. Navarre, R. B. Nacey, and W. Bonus. 2002. Design-Construction of Bridge Street Bridge - First CFRP Bridge in the United States. PCI Journal, V. 47, No.5 (September-October): pp. 20-35.
-
(2002)
PCI Journal
, vol.47
, Issue.5
, pp. 20-35
-
-
Grace, N.F.1
Navarre, F.C.2
Nacey, R.B.3
Bonus, W.4
-
9
-
-
85036731940
-
-
Michigan Department of Transportation (MDOT) Design Manual. MDOT Bureau of Highway Development, Lansing, MI: MDOT
-
Michigan Department of Transportation (MDOT) Design Manual. 2006. Prestressed Concrete Box Beam Details and Post-Tensioning Details. MDOT Bureau of Highway Development, Lansing, MI: MDOT.
-
(2006)
Prestressed Concrete Box Beam Details and Post-Tensioning Details.
-
-
-
10
-
-
77952333895
-
-
MDOT. Lansing, MI: MDOT
-
MDOT. 2007. Materials Source Guide. Lansing, MI: MDOT.
-
(2007)
Materials Source Guide.
-
-
-
13
-
-
41549089952
-
-
American Association of State Highway and Transportation Officials (AASHTO). 3rd Edition-2005 Interim Revisions. 3rd ed. Washington, DC: AASHTO
-
American Association of State Highway and Transportation Officials (AASHTO). 2005. AASHTO LRFD Bridge Design Specifications, 3rd Edition-2005 Interim Revisions. 3rd ed. Washington, DC: AASHTO.
-
(2005)
AASHTO LRFD Bridge Design Specifications
-
-
-
14
-
-
77952341839
-
-
Construction and Technology Division of MDOT, Lansing, MI
-
Grace, N., E. Jensen, V. Matsagar, M. Bebawy, E. Soliman, and J. Hanson. 2008. Use of Unbonded CFCC for Transverse Post-tensioning of Side-by-Side Box-Beam Bridges, pp. 265-272. Construction and Technology Division of MDOT, Lansing, MI.
-
(2008)
Use of Unbonded CFCC for Transverse Post-tensioning of Side-by-Side Box-Beam Bridges
, pp. 265-272
-
-
Grace, N.1
Jensen, E.2
Matsagar, V.3
Bebawy, M.4
Soliman, E.5
Hanson, J.6
|