메뉴 건너뛰기




Volumn , Issue , 2008, Pages

Anticipation for efficient electricity transmission network investments

Author keywords

[No Author keywords available]

Indexed keywords

ADMINISTRATIVE PROCEDURES; CONSTRUCTION DURATION; ELECTRICITY TRANSMISSION NETWORKS; NETWORK INVESTMENT; NETWORK REINFORCEMENTS; PROACTIVE BEHAVIOR; SOCIAL COST;

EID: 77952393136     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/INFRA.2008.5439602     Document Type: Conference Paper
Times cited : (5)

References (12)
  • 2
    • 85083128507 scopus 로고    scopus 로고
    • Towards a successful integration of wind power into european electricity grids
    • th January European Wind Integration Study EWIS.
    • th January 2007. www.etso-net.org
    • (2007) Final Reports
  • 4
    • 33845768321 scopus 로고    scopus 로고
    • Proactive planning and valuation of transmission investments in restructured electricity markets
    • E. Sauma and S. Oren, "Proactive planning and valuation of transmission investments in restructured electricity markets", Journal of Regulatory Economics, 30 (3), 2007, 261-290
    • (2007) Journal of Regulatory Economics , vol.30 , Issue.3 , pp. 261-290
    • Sauma, E.1    Oren, S.2
  • 5
    • 13944283584 scopus 로고    scopus 로고
    • Royal Academy of Engineering RAE, London, March
    • Royal Academy of Engineering (RAE), The cost of generating electricity, London, March 2004
    • (2004) The Cost of Generating Electricity
  • 7
    • 52449092980 scopus 로고    scopus 로고
    • Real options and transmission investment: The new zealand grid investment test
    • G. Boyle, G. Guthrie and R. Meade, "Real options and transmission investment: the New Zealand Grid Investment Test", ISCR working paper, 2006, www.iscr.org.nz
    • (2006) ISCR Working Paper
    • Boyle, G.1    Guthrie, G.2    Meade, R.3
  • 8
    • 84902291813 scopus 로고    scopus 로고
    • VERBUND-Austrian power grid. Austria - Completing the 380kV-Ring. Authorization procedures and major problems
    • 13 February, Bruxelles
    • G. Christiner, "VERBUND-Austrian Power Grid. Austria - Completing the 380kV-Ring. Authorization Procedures and Major Problems", CEER Electricity Infrastructure Workshop, 13 February 2007, Bruxelles
    • (2007) CEER Electricity Infrastructure Workshop
    • Christiner, G.1
  • 9
    • 42549117387 scopus 로고    scopus 로고
    • U. S. Department of Energy USDoE, August
    • U. S. Department of Energy (USDoE), National Electric Transmission Congestion Study, August 2006, www.nietc.anl.gov/documents/docs/Congestion- Study-2006-9MB.pdf
    • (2006) National Electric Transmission Congestion Study
  • 12
    • 33845424935 scopus 로고    scopus 로고
    • Wind energy planning in England, Wales and Denmark: Factors influencing project success
    • J. MacLaren Loring, "Wind energy planning in England, Wales and Denmark: factors influencing project success", Energy Policy, 35 (4), 2007, 2648-2660
    • (2007) Energy Policy , vol.35 , Issue.4 , pp. 2648-2660
    • Loring, J.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.