메뉴 건너뛰기




Volumn 6022 LNCS, Issue , 2010, Pages 166-177

Bicriteria scheduling problem on the two-machine flowshop using simulated annealing

Author keywords

Bicriteria Scheduling; Flowshop Scheduling; Simulated Annealing

Indexed keywords

COMBINATORIAL OPTIMIZATION; DECISION MAKING; ECONOMIC AND SOCIAL EFFECTS; EVOLUTIONARY ALGORITHMS; INTEGER PROGRAMMING; SCHEDULING;

EID: 77952299339     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/978-3-642-12139-5_15     Document Type: Conference Paper
Times cited : (4)

References (30)
  • 3
    • 0027912254 scopus 로고
    • Complexity of a single machine multi-criteria scheduling problems
    • Chen, C.L., Bulfin, R.L.: Complexity of a Single Machine Multi-criteria Scheduling Problems. Eur. J. Oper. Res. 70, 115-125 (1993)
    • (1993) Eur. J. Oper. Res. , vol.70 , pp. 115-125
    • Chen, C.L.1    Bulfin, R.L.2
  • 4
    • 0033161818 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling with bicriteria problem
    • Chou, F.D., Lee, C.E.: Two-Machine Flowshop Scheduling with Bicriteria Problem. Comput. Ind. Eng. 36, 549-564 (1999)
    • (1999) Comput. Ind. Eng. , vol.36 , pp. 549-564
    • Chou, F.D.1    Lee, C.E.2
  • 5
    • 0025539911 scopus 로고
    • Multiobjective flowshop scheduling
    • Daniels, R.L., Chambers, R.J.: Multiobjective Flowshop Scheduling. Nav. Res. Log. 37, 981-995 (1990)
    • (1990) Nav. Res. Log. , vol.37 , pp. 981-995
    • Daniels, R.L.1    Chambers, R.J.2
  • 6
    • 43949118118 scopus 로고    scopus 로고
    • A bicriteria flowshop scheduling with a learning effect
    • Eren, T., Guner, E.: A Bicriteria Flowshop Scheduling with a Learning Effect. Appl. Math. Model. 32, 1719-1733 (2007)
    • (2007) Appl. Math. Model. , vol.32 , pp. 1719-1733
    • Eren, T.1    Guner, E.2
  • 7
    • 0017240964 scopus 로고
    • A dual algorithm for the one-machine scheduling problem
    • Fisher, M.L.: A Dual Algorithm for the One-Machine Scheduling Problem. Math. Program. 11, 229-251 (1976)
    • (1976) Math. Program. , vol.11 , pp. 229-251
    • Fisher, M.L.1
  • 9
    • 0017918132 scopus 로고
    • Flowshop and jobshop schedules
    • Gonzales, T., Sahni, S.: Flowshop and Jobshop Schedules. Oper. Res. 26, 36-52 (1978)
    • (1978) Oper. Res. , vol.26 , pp. 36-52
    • Gonzales, T.1    Sahni, S.2
  • 10
    • 27144552649 scopus 로고    scopus 로고
    • Flowshop scheduling research after five decades
    • Gupta, J.N.D., Stafford Jr., E.F.: Flowshop Scheduling Research after Five Decades. Eur. J. Oper. Res. 169, 699-711 (2006)
    • (2006) Eur. J. Oper. Res. , vol.169 , pp. 699-711
    • Gupta, J.N.D.1    Stafford Jr., E.F.2
  • 11
    • 1842763857 scopus 로고    scopus 로고
    • The theory and practice of simulated annealing
    • Glover, F., Kochenberger, G.A. (eds.) . Kluwer Academic publisher, Dordrecht
    • Henderson, D., Jacobson, S.H., Johnson, A.W.: The Theory and Practice of Simulated Annealing. In: Glover, F., Kochenberger, G.A. (eds.) Handbook of Metaheuristics. Kluwer Academic publisher, Dordrecht (2003)
    • (2003) Handbook of Metaheuristics
    • Henderson, D.1    Jacobson, S.H.2    Johnson, A.W.3
  • 12
    • 13544266187 scopus 로고    scopus 로고
    • Multicriteria scheduling
    • Hoogeveen, H.: Multicriteria scheduling. Eur. J. Oper. Res. 167, 592-623 (2005)
    • (2005) Eur. J. Oper. Res. , vol.167 , pp. 592-623
    • Hoogeveen, H.1
  • 15
    • 0003075019 scopus 로고
    • Optimal two- and three- stage production schedules with set-up times included
    • Johnson, S.M.: Optimal Two- and Three- Stage Production Schedules with Set-up Times Included. Nav. Res. Log. Quart. 1, 61-68 (1954)
    • (1954) Nav. Res. Log. Quart. , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 16
    • 33748181887 scopus 로고    scopus 로고
    • On the NEH heuristics for minimizing the makespan in permutation flowshops
    • Kalczynski, P.J., Kamburowski., J.: On the NEH Heuristics for Minimizing the Makespan in Permutation Flowshops. Omega-Int. J. Manage. S. 35, 53-60 (2007)
    • (2007) Omega-Int. J. Manage. S. , vol.35 , pp. 53-60
    • Kalczynski, P.J.1    Kamburowski, J.2
  • 17
    • 67651232712 scopus 로고    scopus 로고
    • Multi-objective production scheduling: A survey
    • Lei, D.: Multi-objective Production Scheduling: a Survey. Int. J. Adv. Manuf. Tech. 43, 926-938 (2009)
    • (2009) Int. J. Adv. Manuf. Tech. , vol.43 , pp. 926-938
    • Lei, D.1
  • 20
    • 77952297123 scopus 로고    scopus 로고
    • LINDO Systems Inc. Chicago, IL
    • LINDO Systems Inc. Extended LINGO Release 9.0. Chicago, IL (2005)
    • (2005) Extended LINGO Release 9.0
  • 21
    • 5144232432 scopus 로고    scopus 로고
    • Solving multi-objective production scheduling problems using metaheuristics
    • Loukil, T., Teghem, J., Tuyttens, D.: Solving Multi-Objective Production Scheduling Problems Using Metaheuristics. Eur. J. Oper. Res. 161, 42-61 (2005)
    • (2005) Eur. J. Oper. Res. , vol.161 , pp. 42-61
    • Loukil, T.1    Teghem, J.2    Tuyttens, D.3
  • 23
    • 0029254827 scopus 로고
    • Multiple and bicriteria scheduling: A literature survey
    • Nagar, A., Haddock, J., Heragu, S.: Multiple and Bicriteria Scheduling: A Literature Survey. Eur. J. Oper. Res. 81, 88-104 (1995)
    • (1995) Eur. J. Oper. Res. , vol.81 , pp. 88-104
    • Nagar, A.1    Haddock, J.2    Heragu, S.3
  • 24
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
    • Nawaz, M., Enscore Jr., E.E., Ham, I.: A Heuristic Algorithm for the m-Machine, n-Job Flowshop Sequencing Problem. Omega-Int. J. Manage. S. 11, 91-95 (1983)
    • (1983) Omega-Int. J. Manage. S. , vol.11 , pp. 91-95
    • Nawaz, M.1    Enscore Jr., E.E.2    Ham, I.3
  • 25
    • 2942589074 scopus 로고    scopus 로고
    • A Novel metaheuristic approach for the flowshop scheduling problem
    • Nearchou, A.C.: A Novel Metaheuristic Approach for the Flowshop Scheduling Problem. Eng. Appl. Artif. Intel. 17, 289-300 (2004)
    • (2004) Eng. Appl. Artif. Intel. , vol.17 , pp. 289-300
    • Nearchou, A.C.1
  • 26
    • 0003054955 scopus 로고
    • A survey of scheduling rule
    • Panwalker, S.S., Iskander, W.: A Survey of Scheduling Rule. Oper. Res. 25, 45-61 (1977)
    • (1977) Oper. Res. , vol.25 , pp. 45-61
    • Panwalker, S.S.1    Iskander, W.2
  • 28
    • 0038577481 scopus 로고    scopus 로고
    • Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times
    • Rajendran, C., Ziegler, H.: Scheduling to Minimize the Sum of Weighted Flowtime and Weighted Tardiness of Jobs in a Flowshop with Sequence-Dependent Setup Times. Eur. J. Oper. Res. 149, 513-522 (2003)
    • (2003) Eur. J. Oper. Res. , vol.149 , pp. 513-522
    • Rajendran, C.1    Ziegler, H.2
  • 29
    • 0002066821 scopus 로고
    • Various Optimizers for Single Stage production
    • Smith, W.E.: Various Optimizers for Single Stage production. Nav. Res. Log. Quart. 3, 59-66 (1956)
    • (1956) Nav. Res. Log. Quart. , vol.3 , pp. 59-66
    • Smith, W.E.1
  • 30
    • 0032688343 scopus 로고    scopus 로고
    • Application of the simulated annealing algorithm to the combinatorial optimization problem with permutation property: An investigation of generation mechanism
    • Tian, P., Ma, J., Zhang, D.-M.: Application of the Simulated Annealing Algorithm to the Combinatorial Optimization Problem with Permutation Property: An Investigation of Generation Mechanism. Eur. J. Oper. Res. 118, 81-94 (1999)
    • (1999) Eur. J. Oper. Res. , vol.118 , pp. 81-94
    • Tian, P.1    Ma, J.2    Zhang, D.-M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.