메뉴 건너뛰기




Volumn , Issue , 2010, Pages 2085-2090

RTDS-based real time simulations of grid-connected wind turbine generator systems

Author keywords

[No Author keywords available]

Indexed keywords

BACK-TO-BACK CONVERTER; CONTROL SCHEMES; DOUBLY-FED INDUCTION GENERATOR; GRID-CONNECTED; INDUCTION GENERATOR; MODELING AND ANALYSIS; OUTPUT PERFORMANCE; PERMANENT MAGNET SYNCHRONOUS GENERATOR; REAL TIME DIGITAL SIMULATOR; REAL TIME SIMULATIONS; SIMULATION RESULT; SQUIRREL CAGE INDUCTION GENERATORS; WIND SPEED; WIND TURBINE GENERATOR SYSTEMS; WIND TURBINE SYSTEMS;

EID: 77952225087     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/APEC.2010.5433523     Document Type: Conference Paper
Times cited : (17)

References (14)
  • 1
    • 50049097295 scopus 로고    scopus 로고
    • A Novel Real Time Simulation Method for Grid-connected Wind Generator System by Using RTDS
    • Oct.
    • D. J. Park, Y. J. Kim, M. H. Ali, M. Park, and I. K. Yu, "A Novel Real Time Simulation Method for Grid-connected Wind Generator System by Using RTDS," Conf. Rec. of ICEMS 2007, pp. 1936-1941, Oct. 2007.
    • (2007) Conf. Rec. of ICEMS 2007 , pp. 1936-1941
    • Park, D.J.1    Kim, Y.J.2    Ali, M.H.3    Park, M.4    Yu, I.K.5
  • 2
    • 40449134843 scopus 로고    scopus 로고
    • Overview of different wind generator systems and their comparisons
    • H. Li, Z. Chen, "Overview of different wind generator systems and their comparisons," IET Renewable Power Generation, vol. 2, no. 2, pp. 123-138, 2008.
    • (2008) IET Renewable Power Generation , vol.2 , Issue.2 , pp. 123-138
    • Li, H.1    Chen, Z.2
  • 4
    • 38049186624 scopus 로고    scopus 로고
    • Simulations and experiments on a 12kW direct driven PM synchronous generator for wind power
    • S. Eriksson, A.Solum, M. Leijon, and H.Bernhoff, "Simulations and experiments on a 12kW direct driven PM synchronous generator for wind power," Eleservier Science Ltd. On Renewable Energy, Vol. 33, pp. 674-681, 2008.
    • (2008) Eleservier Science Ltd. on Renewable Energy , vol.33 , pp. 674-681
    • Eriksson, S.1    Solum, A.2    Leijon, M.3    Bernhoff, H.4
  • 6
    • 0020932961 scopus 로고
    • Stability Simulation of Wind Turbine Systems
    • Dec.
    • P. M. Anderson and A. Bose, "Stability Simulation of Wind Turbine Systems," IEEE Trans. Power Apparatus and Systems, vol. PAS-102, no. 12, pp. 3791-3795, Dec. 1983.
    • (1983) IEEE Trans. Power Apparatus and Systems , vol.PAS-102 , Issue.12 , pp. 3791-3795
    • Anderson, P.M.1    Bose, A.2
  • 7
    • 84883021879 scopus 로고    scopus 로고
    • Control of a Permanent Magnet Synchronous Generator used in a Variable Speed Wind Energy System
    • I. Schiemenz and M. Stiebler, "Control of a Permanent Magnet Synchronous Generator used in a Variable Speed Wind Energy System," in Proceedings of IEEE IEMDC'01, pp. 872-877, 2001.
    • (2001) Proceedings of IEEE IEMDC'01 , pp. 872-877
    • Schiemenz, I.1    Stiebler, M.2
  • 8
    • 29544432058 scopus 로고    scopus 로고
    • Output Power Control of Wind Turbine Generator by Pitch Angle Control Using Minimum Variance Control
    • T. Senjyu, R. Sakamoto, N. Urakaki, H. Higa, K. Uezato, and T. Funabashi, "Output Power Control of Wind Turbine Generator by Pitch Angle Control Using Minimum Variance Control," Electrical Engineering in Japan, 154(2), pp. 10-17, 2006.
    • (2006) Electrical Engineering in Japan , vol.154 , Issue.2 , pp. 10-17
    • Senjyu, T.1    Sakamoto, R.2    Urakaki, N.3    Higa, H.4    Uezato, K.5    Funabashi, T.6
  • 10
    • 33244483622 scopus 로고    scopus 로고
    • Control of Permanent- Magnet Generators Applied to Variable-Speed Wind-Energy Systems Connected to the Grid
    • March
    • M. Chinchillar, S. Arnaltes, and J. C.Burgos, "Control of Permanent- Magnet Generators Applied to Variable-Speed Wind-Energy Systems Connected to the Grid," IEEE Transaction on Energy Conversion, vol. 21, no. 1, pp. 130-135, March 2006.
    • (2006) IEEE Transaction on Energy Conversion , vol.21 , Issue.1 , pp. 130-135
    • Chinchillar, M.1    Arnaltes, S.2    Burgos, J.C.3
  • 11
    • 60149111074 scopus 로고    scopus 로고
    • Fuzzy Logic Supervisor-Based Primary Frequency Control Experiments of a Variable-Speed Wind Generator
    • February
    • M. E. Mokadem, V. Courtecuisse, C. Saudemont, B. Robyns, and J. Deuse, "Fuzzy Logic Supervisor-Based Primary Frequency Control Experiments of a Variable-Speed Wind Generator," IEEE Transaction on Power Systems, vol. 24, no. 1, pp. 407-417, February 2009.
    • (2009) IEEE Transaction on Power Systems , vol.24 , Issue.1 , pp. 407-417
    • Mokadem, M.E.1    Courtecuisse, V.2    Saudemont, C.3    Robyns, B.4    Deuse, J.5
  • 12
    • 33645725164 scopus 로고    scopus 로고
    • Design of a Maximum Power Tracking System for Wind-Energy-Conversion Application
    • Aplil
    • E. Koutroulis and K. Kalaizakis, "Design of a Maximum Power Tracking System for Wind-Energy-Conversion Application," IEEE Transaction on Industrial Electronics, vol. 53, no. 2, pp. 486-494, Aplil 2006.
    • (2006) IEEE Transaction on Industrial Electronics , vol.53 , Issue.2 , pp. 486-494
    • Koutroulis, E.1    Kalaizakis, K.2
  • 14
    • 34948830627 scopus 로고    scopus 로고
    • Real-Time Implementation of a STATCOM on a Wind Farm Equipped with Doubly Fed Induction Generators
    • January/February
    • W. Qiao, G. K. Venayagamoorthy, and R. G. Harley, "Real-Time Implementation of a STATCOM on a Wind Farm Equipped With Doubly Fed Induction Generators," IEEE Transaction on Industry Application, vol. 45, no. 1, pp. 1073-1080, January/February, 2006.
    • (2006) IEEE Transaction on Industry Application , vol.45 , Issue.1 , pp. 1073-1080
    • Qiao, W.1    Venayagamoorthy, G.K.2    Harley, R.G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.