-
1
-
-
0011852981
-
Composite system reliability evaluation
-
R. Billinton, "Composite system reliability evaluation," IEEE Trans. Power App. Syst., vol. PAS-88, no. 4, pp. 276-281, 1969.
-
(1969)
IEEE Trans. Power App. Syst.
, vol.4 PAS-88
, pp. 276-281
-
-
Billinton, R.1
-
2
-
-
0026866453
-
Frequency and duration calculations in composite generation and transmission reliability evaluation
-
May
-
A. C. G. Melo, M. V. F. Pereira, and A. M. Leite da Silva, "Frequency and duration calculations in composite generation and transmission reliability evaluation," IEEE Trans. Power Syst., vol. 7, no. 2, pp. 469-476, May 1992.
-
(1992)
IEEE Trans. Power Syst.
, vol.7
, Issue.2
, pp. 469-476
-
-
Melo, A.C.G.1
Pereira, M.V.F.2
Leite Da Silva, A.M.3
-
3
-
-
0042906341
-
Composite system reliability evaluation: Phase I - Scoping study
-
EPRI
-
EPRI, Composite System Reliability Evaluation: Phase I - Scoping Study, Rep. EL-5290, 1987.
-
(1987)
Rep. EL-5290
-
-
-
4
-
-
0029354288
-
Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads
-
Aug.
-
A. Sankarakrishnan and R. Billinton, "Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads," IEEE Trans. Power Syst., vol. 10, no. 3, pp. 1540-1545, Aug. 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, Issue.3
, pp. 1540-1545
-
-
Sankarakrishnan, A.1
Billinton, R.2
-
5
-
-
0028481002
-
Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation
-
Aug.
-
J. C. O. Mello, M. V. F. Pereira, and A. M. Leite da Silva, "Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation," IEEE Trans. Power Syst., vol. 9, no. 3, pp. 1318-1326, Aug. 1994.
-
(1994)
IEEE Trans. Power Syst.
, vol.9
, Issue.3
, pp. 1318-1326
-
-
Mello, J.C.O.1
Pereira, M.V.F.2
Leite Da Silva, A.M.3
-
6
-
-
0031096931
-
Application of chronological load modeling in composite reliability worth evaluation
-
J. C. O. Mello, M. V. F. Pereira, A. M. Leite da Silva, and A. C. G. Melo, "Application of chronological load modeling in composite reliability worth evaluation," Elect. Power Syst. Res., vol. 40, pp. 167-174, 1997.
-
(1997)
Elect. Power Syst. Res.
, vol.40
, pp. 167-174
-
-
Mello, J.C.O.1
Pereira, M.V.F.2
Leite Da Silva, A.M.3
Melo, A.C.G.4
-
7
-
-
0034138495
-
Pseudo-chronological simulation for composite reliability analysis with time varying loads
-
Feb.
-
A. M. Leite da Silva, L. A. F. Manso, J. C. O. Mello, and R. Billinton, "Pseudo-chronological simulation for composite reliability analysis with time varying loads," IEEE Trans. Power Syst., vol. 15, no. 1, pp. 73-80, Feb. 2000.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, Issue.1
, pp. 73-80
-
-
Leite Da Silva, A.M.1
Manso, L.A.F.2
Mello, J.C.O.3
Billinton, R.4
-
8
-
-
77951665776
-
Time varying load modeling in composite reliability evaluation by non-sequential Monte Carlo simulation
-
(in Portuguese) Jan.-Feb.-Mar Brazil.
-
L. A. F. Manso and A. M. Leite da Silva, "Time varying load modeling in composite reliability evaluation by non-sequential Monte Carlo simulation," (in Portuguese) Control Autom. Mag., vol. 15, no. 1, Jan.-Feb.-Mar 2004, Brazil.
-
(2004)
Control Autom. Mag.
, vol.15
, Issue.1
-
-
Manso, L.A.F.1
Leite Da Silva, A.M.2
-
9
-
-
0026154722
-
Hybrid approach for reliability evaluation of composite generation and transmission systems using Monte Carlo simulation and enumeration technique
-
May
-
R. Billinton and L. Wenyuan, "Hybrid approach for reliability evaluation of composite generation and transmission systems using Monte Carlo simulation and enumeration technique," Proc. Inst. Elect. Eng. C, vol. 138, no. 3, pp. 233-241, May 1991.
-
(1991)
Proc. Inst. Elect. Eng. C
, vol.138
, Issue.3
, pp. 233-241
-
-
Billinton, R.1
Wenyuan, L.2
-
10
-
-
0027643958
-
A conditional probability approach to the calculation of frequency and duration indices in composite reliability evaluation
-
Aug.
-
A. C. G. Melo, M. V. F. Pereira, and A. M. Leite da Silva, "A conditional probability approach to the calculation of frequency and duration indices in composite reliability evaluation," IEEE Trans. Power Syst., vol. 8, no. 3, pp. 1118-1125, Aug. 1993.
-
(1993)
IEEE Trans. Power Syst.
, vol.8
, Issue.3
, pp. 1118-1125
-
-
Melo, A.C.G.1
Pereira, M.V.F.2
Leite Da Silva, A.M.3
-
11
-
-
0342363353
-
Development of a composite system reliability program for large hydrothermal power systems - Issues and solutions
-
London, U.K.
-
J. C. O. Mello, A. C. G. Melo, S. P. Romero, G. C. Oliveira, S. H. F. Cunha, M. Morozowsk, M. V. F. Pereira, and R. N. Fontoura, "Development of a composite system reliability program for large hydrothermal power systems - Issues and solutions," in Proc. 3rd Int. Conf. PMPAS-91, London, U.K., 1991.
-
(1991)
Proc. 3rd Int. Conf. PMPAS-91
-
-
Mello, J.C.O.1
Melo, A.C.G.2
Romero, S.P.3
Oliveira, G.C.4
Cunha, S.H.F.5
Morozowsk, M.6
Pereira, M.V.F.7
Fontoura, R.N.8
-
12
-
-
0018544097
-
IEEE reliability test system
-
IEEE Reliability Test System Task Force of the Application of Probability Methods Subcommittee
-
IEEE Reliability Test System Task Force of the Application of Probability Methods Subcommittee, "IEEE reliability test system," IEEE Trans. Power App. Syst., vol. PAS-98, pp. 2047-2054, 1979.
-
(1979)
IEEE Trans. Power App. Syst.
, vol.PAS-98
, pp. 2047-2054
-
-
|