Volumn 28, Issue 4, 2010, Pages 361-376

Systems analysis of project cash flow management strategies

Author keywords

Cash flow management strategies; Overdraft; Project cash flow; Scenario analysis; System dynamics

Indexed keywords

CASH FLOW; CASH FLOW MANAGEMENT; CONSTRUCTION PROJECT MANAGEMENT; COST SAVING; FEED-BACK LOOP; PROJECT COST; RETAINAGE; SCENARIO ANALYSIS; SYSTEM DYNAMICS MODEL; TRADE CREDIT;

EID: 77951660469     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446191003702484     Document Type: Article
Times cited : (61)

References (35)
  • 5
    • 33744501807 scopus 로고
    • Multi-project planning and control in construction authorities
    • March
    • Bromilow, F.J. (1978) Multi-project planning and control in construction authorities. Building Economist, March, 208-13.
    • (1978) Building Economist , pp. 208-213
    • Bromilow, F.J.1
  • 7
    • 0001906688 scopus 로고
    • The rework cycle: Benchmarks for the project manager
    • Cooper, K.G. (1993) The rework cycle: benchmarks for the project manager. Project Management Journal, 24(1), 17-21.
    • (1993) Project Management Journal , vol.24 , Issue.1 , pp. 17-21
    • Cooper, K.G.1
  • 9
    • 22944483004 scopus 로고    scopus 로고
    • EJCDC,Engineers Joint Contract Documents Committee, C-700, National Society of Professional Engineers, Washington, DC
    • EJCDC (2002) Standard General Conditions of the Construction Contract, Engineers Joint Contract Documents Committee, C-700, National Society of Professional Engineers, Washington, DC.
    • (2002) Standard General Conditions of The Construction Contract
  • 10
    • 0002132859 scopus 로고    scopus 로고
    • Dynamic modeling of product development processes
    • Ford, D. and Sterman, J.D. (1998) Dynamic modeling of product development processes. System Dynamics Review, 14(1), 31-68.
    • (1998) System Dynamics Review , vol.14 , Issue.1 , pp. 31-68
    • Ford, D.1    Sterman, J.D.2
  • 12
    • 22944432153 scopus 로고    scopus 로고
    • System dynamics modeling of delay and disruption claims
    • Ibbs, W. and Liu, M. (2005) System dynamics modeling of delay and disruption claims. AACEi, Cost Engineering, 47(6), 12-15.
    • (2005) Aacei, Cost Engineering , vol.47 , Issue.6 , pp. 12-15
    • Ibbs, W.1    Liu, M.2
  • 13
    • 8644292857 scopus 로고    scopus 로고
    • Multiple simulation analysis for probabilistic cost and schedule integration
    • Isidore, L.J. and Back, W.E. (2002) Multiple simulation analysis for probabilistic cost and schedule integration. ASCE Journal of Construction Engineering and Management, 128(3), 211-9.
    • (2002) Asce Journal of Construction Engineering and Management , vol.128 , Issue.3 , pp. 211-219
    • Isidore, L.J.1    Back, W.E.2
  • 15
    • 0344463113 scopus 로고
    • Modeling standard cost commitment curves for contractors
    • Kaka, A. and Price, A.D. (1993) Modeling standard cost commitment curves for contractors. Construction Management and Economics, 11(4), 271-83.
    • (1993) Construction Management and Economics , vol.11 , Issue.4 , pp. 271-283
    • Kaka, A.1    Price, A.D.2
  • 17
    • 24344468918 scopus 로고    scopus 로고
    • Cash farming in building and construction: A stochastic analysis
    • Kenley, R. (1999) Cash farming in building and construction: a stochastic analysis. Construction Management and Economics, 17(4), 393-401.
    • (1999) Construction Management and Economics , vol.17 , Issue.4 , pp. 393-401
    • Kenley, R.1
  • 19
    • 0006767477 scopus 로고
    • A construction project cash flow model-an idiographic approach
    • Kenley, R. and Wilson, O.D. (1986) A construction project cash flow model-an idiographic approach. Construction Management and Economics, 4(3), 213-32.
    • (1986) Construction Management and Economics , vol.4 , Issue.3 , pp. 213-232
    • Kenley, R.1    Wilson, O.D.2
  • 21
    • 39349103031 scopus 로고    scopus 로고
    • Resource allocation policy design for reduced project duration: A systems modeling approach
    • Lee, Z., Ford, D.N. and Joglekar, N. (2007) Resource allocation policy design for reduced project duration: a systems modeling approach. Systems Research and Behavioral Science, 24(6), 551-66.
    • (2007) Systems Research and Behavioral Science , vol.24 , Issue.6 , pp. 551-566
    • Lee, Z.1    Ford, D.N.2    Joglekar, N.3
  • 22
    • 0041059063 scopus 로고
    • An S-curve equation for project control
    • Miskawi, A. (1989) An S-curve equation for project control. Construction Management and Economics, 7(2), 115-24.
    • (1989) Construction Management and Economics , vol.7 , Issue.2 , pp. 115-124
    • Miskawi, A.1
  • 23
    • 77951653642 scopus 로고
    • Unit pricing and unbalanced bids
    • Nadel, N.A. (1991) Unit pricing and unbalanced bids. ASCE Civil Engineering, 61(6), 62-3.
    • (1991) ASCE Civil Engineering , vol.61 , Issue.6 , pp. 62-63
    • Nadel, N.A.1
  • 25
    • 21544456892 scopus 로고    scopus 로고
    • Contractor financial credit limits: Their derivation and implications for materials suppliers
    • Nicholas, J., Holt, G.D. and Mihsein, M. (2000) Contractor financial credit limits: their derivation and implications for materials suppliers. Construction Management and Economics, 18(5), 535-45.
    • (2000) Construction Management and Economics , vol.18 , Issue.5 , pp. 535-545
    • Nicholas, J.1    Holt, G.D.2    Mihsein, M.3
  • 26
    • 13944250288 scopus 로고    scopus 로고
    • System dynamics approach to exploring performance enhancement in a construction organization
    • Ogunlana, S.O., Li, H. and Sukhera, F. (2003) System dynamics approach to exploring performance enhancement in a construction organization. ASCE Journal of Construction Engineering and Management, 129(5), 528-36.
    • (2003) ASCE Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 528-536
    • Ogunlana, S.O.1    Li, H.2    Sukhera, F.3
  • 27
    • 26644469855 scopus 로고    scopus 로고
    • Cash flow forecasting model for general contractors using moving weights of cost categories
    • Park, H.K., Han, S.H. and Russell, J.R. (2005) Cash flow forecasting model for general contractors using moving weights of cost categories. ASCE Journal of Management in Engineering, 21(4), 164-72.
    • (2005) ASCE Journal of Management in Engineering , vol.21 , Issue.4 , pp. 164-172
    • Park, H.K.1    Han, S.H.2    Russell, J.R.3
  • 28
    • 0142025004 scopus 로고    scopus 로고
    • Dynamic change management for construction: Introducing the change cycle into model-based project management
    • Park, M. and Pena-Mora, F. (2003) Dynamic change management for construction: introducing the change cycle into model-based project management. System Dynamics Review, 19(3), 213-42.
    • (2003) System Dynamics Review , vol.19 , Issue.3 , pp. 213-242
    • Park, M.1    Pena-Mora, F.2
  • 30
    • 0020138987 scopus 로고
    • Application of cost-flow forecasting models
    • Peer, S. (1982) Application of cost-flow forecasting models. ASCE Journal of Construction Division, 108(2), 226-32.
    • (1982) ASCE Journal of Construction Division , vol.108 , Issue.2 , pp. 226-232
    • Peer, S.1
  • 34
    • 0039280214 scopus 로고
    • Formulating construction cash flow curves using a reliability theory analogy
    • Tucker, S.N. (1986) Formulating construction cash flow curves using a reliability theory analogy. Construction Management and Economics, 4(3), 179-88.
    • (1986) Construction Management and Economics , vol.4 , Issue.3 , pp. 179-188
    • Tucker, S.N.1
  • 35


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.