1
-
-
0000987481
-
The changing role of builders merchants in the construction supply chain
-
Agapiou, A., Flanagan, R., Norman, G. and Notman, D. (1999) The changing role of builders merchants in the construction supply chain. Construction Management and Economics, 16 (3), 351-61.
-
(1999)
Construction Management and Economics
, vol.16
, Issue.3
, pp. 351-361
-
-
Agapiou, A.1
Flanagan, R.2
Norman, G.3
Notman, D.4
-
5
-
-
33744501807
-
Multi-project planning and control in construction authorities
-
March
-
Bromilow, F.J. (1978) Multi-project planning and control in construction authorities. Building Economist, March, 208-13.
-
(1978)
Building Economist
, pp. 208-213
-
-
Bromilow, F.J.1
-
6
-
-
20444489878
-
Assessing the accuracy of cash flow models: The signifi- cance of payment conditions
-
Chen, H.-L., O'Brien, W.J. and Herbsman, Z.J. (2005) Assessing the accuracy of cash flow models: the signifi- cance of payment conditions. ASCE Journal of Construction Engineering and Management, 131(6), 669-76.
-
(2005)
ASCE Journal of Construction Engineering and Management
, vol.131
, Issue.6
, pp. 669-676
-
-
Chen, H.-L.1
O'Brien, W.J.2
Herbsman, Z.J.3
-
7
-
-
0001906688
-
The rework cycle: Benchmarks for the project manager
-
Cooper, K.G. (1993) The rework cycle: benchmarks for the project manager. Project Management Journal, 24(1), 17-21.
-
(1993)
Project Management Journal
, vol.24
, Issue.1
, pp. 17-21
-
-
Cooper, K.G.1
-
8
-
-
84870883854
-
-
learning, and uncertainty, PhD dissertation, Purdue University, West Lafayette, IN
-
Cui, Q. (2005) A dynamic model for profitability analysis of construction firms: towards complexity, learning, and uncertainty, PhD dissertation, Purdue University, West Lafayette, IN.
-
(2005)
A Dynamic Model for Profitability Analysis of Construction Firms: Towards Complexity
-
-
Cui, Q.1
-
9
-
-
22944483004
-
-
EJCDC,Engineers Joint Contract Documents Committee, C-700, National Society of Professional Engineers, Washington, DC
-
EJCDC (2002) Standard General Conditions of the Construction Contract, Engineers Joint Contract Documents Committee, C-700, National Society of Professional Engineers, Washington, DC.
-
(2002)
Standard General Conditions of The Construction Contract
-
-
-
10
-
-
0002132859
-
Dynamic modeling of product development processes
-
Ford, D. and Sterman, J.D. (1998) Dynamic modeling of product development processes. System Dynamics Review, 14(1), 31-68.
-
(1998)
System Dynamics Review
, vol.14
, Issue.1
, pp. 31-68
-
-
Ford, D.1
Sterman, J.D.2
-
12
-
-
22944432153
-
System dynamics modeling of delay and disruption claims
-
Ibbs, W. and Liu, M. (2005) System dynamics modeling of delay and disruption claims. AACEi, Cost Engineering, 47(6), 12-15.
-
(2005)
Aacei, Cost Engineering
, vol.47
, Issue.6
, pp. 12-15
-
-
Ibbs, W.1
Liu, M.2
-
15
-
-
0344463113
-
Modeling standard cost commitment curves for contractors
-
Kaka, A. and Price, A.D. (1993) Modeling standard cost commitment curves for contractors. Construction Management and Economics, 11(4), 271-83.
-
(1993)
Construction Management and Economics
, vol.11
, Issue.4
, pp. 271-283
-
-
Kaka, A.1
Price, A.D.2
-
17
-
-
24344468918
-
Cash farming in building and construction: A stochastic analysis
-
Kenley, R. (1999) Cash farming in building and construction: a stochastic analysis. Construction Management and Economics, 17(4), 393-401.
-
(1999)
Construction Management and Economics
, vol.17
, Issue.4
, pp. 393-401
-
-
Kenley, R.1
-
19
-
-
0006767477
-
A construction project cash flow model-an idiographic approach
-
Kenley, R. and Wilson, O.D. (1986) A construction project cash flow model-an idiographic approach. Construction Management and Economics, 4(3), 213-32.
-
(1986)
Construction Management and Economics
, vol.4
, Issue.3
, pp. 213-232
-
-
Kenley, R.1
Wilson, O.D.2
-
20
-
-
77951656300
-
-
System Dynamics Group, Massachusetts Institute of Technology, Cambridge, MA
-
Kim, D.H. (1988) Sun Microsystems, Sun3 Product Development/ Release Model, Technical Report D-4113, System Dynamics Group, Massachusetts Institute of Technology, Cambridge, MA.
-
(1988)
Sun Microsystems, Sun3 Product Development/ Release Model, Technical Report D-4113
-
-
Kim, D.H.1
-
21
-
-
39349103031
-
Resource allocation policy design for reduced project duration: A systems modeling approach
-
Lee, Z., Ford, D.N. and Joglekar, N. (2007) Resource allocation policy design for reduced project duration: a systems modeling approach. Systems Research and Behavioral Science, 24(6), 551-66.
-
(2007)
Systems Research and Behavioral Science
, vol.24
, Issue.6
, pp. 551-566
-
-
Lee, Z.1
Ford, D.N.2
Joglekar, N.3
-
22
-
-
0041059063
-
An S-curve equation for project control
-
Miskawi, A. (1989) An S-curve equation for project control. Construction Management and Economics, 7(2), 115-24.
-
(1989)
Construction Management and Economics
, vol.7
, Issue.2
, pp. 115-124
-
-
Miskawi, A.1
-
23
-
-
77951653642
-
Unit pricing and unbalanced bids
-
Nadel, N.A. (1991) Unit pricing and unbalanced bids. ASCE Civil Engineering, 61(6), 62-3.
-
(1991)
ASCE Civil Engineering
, vol.61
, Issue.6
, pp. 62-63
-
-
Nadel, N.A.1
-
25
-
-
21544456892
-
Contractor financial credit limits: Their derivation and implications for materials suppliers
-
Nicholas, J., Holt, G.D. and Mihsein, M. (2000) Contractor financial credit limits: their derivation and implications for materials suppliers. Construction Management and Economics, 18(5), 535-45.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.5
, pp. 535-545
-
-
Nicholas, J.1
Holt, G.D.2
Mihsein, M.3
-
26
-
-
13944250288
-
System dynamics approach to exploring performance enhancement in a construction organization
-
Ogunlana, S.O., Li, H. and Sukhera, F. (2003) System dynamics approach to exploring performance enhancement in a construction organization. ASCE Journal of Construction Engineering and Management, 129(5), 528-36.
-
(2003)
ASCE Journal of Construction Engineering and Management
, vol.129
, Issue.5
, pp. 528-536
-
-
Ogunlana, S.O.1
Li, H.2
Sukhera, F.3
-
27
-
-
26644469855
-
Cash flow forecasting model for general contractors using moving weights of cost categories
-
Park, H.K., Han, S.H. and Russell, J.R. (2005) Cash flow forecasting model for general contractors using moving weights of cost categories. ASCE Journal of Management in Engineering, 21(4), 164-72.
-
(2005)
ASCE Journal of Management in Engineering
, vol.21
, Issue.4
, pp. 164-172
-
-
Park, H.K.1
Han, S.H.2
Russell, J.R.3
-
28
-
-
0142025004
-
Dynamic change management for construction: Introducing the change cycle into model-based project management
-
Park, M. and Pena-Mora, F. (2003) Dynamic change management for construction: introducing the change cycle into model-based project management. System Dynamics Review, 19(3), 213-42.
-
(2003)
System Dynamics Review
, vol.19
, Issue.3
, pp. 213-242
-
-
Park, M.1
Pena-Mora, F.2
-
29
-
-
0025468328
-
Dynamic optimization of cash flow management decisions: A stochastic model
-
Pate-Cornell, M.E., Tagaras, G. and Eisenhardt, K.M. (1990) Dynamic optimization of cash flow management decisions: a stochastic model. IEEE Transactions in Engineering Management, 37(3), 203-12.
-
(1990)
IEEE Transactions in Engineering Management
, vol.37
, Issue.3
, pp. 203-212
-
-
Pate-Cornell, M.E.1
Tagaras, G.2
Eisenhardt, K.M.3
-
30
-
-
0020138987
-
Application of cost-flow forecasting models
-
Peer, S. (1982) Application of cost-flow forecasting models. ASCE Journal of Construction Division, 108(2), 226-32.
-
(1982)
ASCE Journal of Construction Division
, vol.108
, Issue.2
, pp. 226-232
-
-
Peer, S.1
-
34
-
-
0039280214
-
Formulating construction cash flow curves using a reliability theory analogy
-
Tucker, S.N. (1986) Formulating construction cash flow curves using a reliability theory analogy. Construction Management and Economics, 4(3), 179-88.
-
(1986)
Construction Management and Economics
, vol.4
, Issue.3
, pp. 179-188
-
-
Tucker, S.N.1
-
35
-
-
13944268326
-
Electronic-based procedure for managing unbalanced bids
-
Wang, W. (2004) Electronic-based procedure for managing unbalanced bids. ASCE Journal of Construction Engineering and Management, 130(3), 455-60.
-
(2004)
ASCE Journal of Construction Engineering and Management
, vol.130
, Issue.3
, pp. 455-460
-
-
Wang, W.1
|