-
1
-
-
0033116875
-
Two-machine flow shop scheduling with availability constraints
-
C. Y Lee, "Two-machine flow shop scheduling with availability constraints". European Journal of Operational Research, 114, p. 420-429. 1999.
-
(1999)
European Journal of Operational Research
, vol.114
, pp. 420-429
-
-
Lee, C.Y.1
-
2
-
-
27744573776
-
Optimal joint preventive maintenance and production policies
-
DOI 10.1002/nav.20107
-
Y. Xiaodong, X. Xiaolan, C. F. Michael, I. M. Steven, "Optimal joint preventive maintenance and production policies", Naval Research Logistics 52 (2005) 668-681. (Pubitemid 41624898)
-
(2005)
Naval Research Logistics
, vol.52
, Issue.7
, pp. 668-681
-
-
Yao, X.1
Xie, X.2
Fu, M.C.3
Marcus, S.I.4
-
3
-
-
0343963100
-
Scheduling with limited machine availability
-
S. Günter "Scheduling with limited machine availability", European Journal of Operational Research, 2000, 121, pp. 1-15.
-
(2000)
European Journal of Operational Research
, vol.121
, pp. 1-15
-
-
Günter, S.1
-
4
-
-
70350661863
-
Study of Scheduling Problems with Machine Availability Constraint
-
360-383, Winter
-
S. D. R. Hamid, T. T. Mohamed, "Study of Scheduling Problems with Machine Availability Constraint" JISE Journal of Industrial and Systems Engineering Vol. 1, No. 4, pp 360-383, pp 360-383, Winter 2008.
-
(2008)
JISE Journal of Industrial and Systems Engineering
, vol.1
, Issue.4
, pp. 360-383
-
-
Hamid, S.D.R.1
Mohamed, T.T.2
-
5
-
-
0026897390
-
Single machine flow-time scheduling with scheduled maintenance
-
C.-Y. Lee and S.D. Liman, "Single machine flow-time scheduling with scheduled maintenance", Acta Inform. 29, 375-382 (1992).
-
(1992)
Acta Inform
, vol.29
, pp. 375-382
-
-
Lee, C.-Y.1
Liman, S.D.2
-
6
-
-
34548390510
-
Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times
-
DOI 10.1016/j.cor.2006.04.010, PII S0305054806001225
-
K. Imed, C. Chengbin, S. Ahmed, "Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times" Computers and Operations Research Volume 35, Issue 3 (March 2008), pp. 827-844. (Pubitemid 47368841)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.3
, pp. 827-844
-
-
Kacem, I.1
Chu, C.2
Souissi, A.3
-
7
-
-
0034159705
-
Scheduling jobs and maintenance activities on parallel machines
-
DOI 10.1002/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3
-
C. Y. Lee and Z. L. Chen, "Scheduling jobs and maintenance activities on parallel machines," Nav. Res. Logist., vol.47, no.2, pp. 145-165, 2000. (Pubitemid 30563276)
-
(2000)
Naval Research Logistics
, vol.47
, Issue.2
, pp. 145-165
-
-
Lee, C.-Y.1
Chen, Z.-L.2
-
8
-
-
0036466573
-
Two-machine flow shops with limited machine availability
-
DOI 10.1016/S0377-2217(01)00083-2, PII S0377221701000832
-
W. Kubiak, J. Blazewicz, P. Formanowicz, J. Breit, G. Schmidt, "Two-machine flow shops with limited machine availability, " European Journal of Operational Research, vol.136, pp. 528-540, 2002. (Pubitemid 33094119)
-
(2002)
European Journal of Operational Research
, vol.136
, Issue.3
, pp. 528-540
-
-
Kubiak, W.1
Blazewicz, J.2
Formanowicz, P.3
Breit, J.4
Schmidt, G.5
-
9
-
-
0000693192
-
Heuristic algorithms for the two-machine flowshop with limited machine availability
-
DOI 10.1016/S0305-0483(01)00048-2, PII S0305048301000482
-
J. Blazewicz, J. Breit, P. Formanowicz, W. Kubiak, G. Schmidt, "Heuristic algorithms for the two-machine flow shop Problem with limited machine availability ", Omega Journal, vol.29, pp. 599-608, 2001. (Pubitemid 33628774)
-
(2001)
Omega
, vol.29
, Issue.6
, pp. 599-608
-
-
Blazewicz, J.1
Breit, J.2
Formanowicz, P.3
Kubiak, W.4
Schmidt, G.5
-
11
-
-
40649100562
-
Disjunctive and timeindexed formulations for non-preemptive job shop scheduling with resource availability constraints
-
Dec.
-
S. Azem, R. Aggoune, S. Dauzère-Pérès, S. "Disjunctive and timeindexed formulations for non-preemptive job shop scheduling with resource availability constraints", IEEE International Conference on Industrial Engineering and Engineering Management 2007, Volume , Issue, 2-4 Dec. 2007, Page(s):787-791.
-
(2007)
IEEE International Conference on Industrial Engineering and Engineering Management 2007
, Issue.2-4
, pp. 787-791
-
-
Azem, S.1
Aggoune, R.2
Dauzère-Pérès, S.3
-
12
-
-
33645592309
-
A branch and bound algorithm for a job shop scheduling problem with availability constraints
-
P. Mauguière, J. L. Bouquard, J. C. Billaut "A branch and bound algorithm for a job shop scheduling problem with availability constraints"; In: Proceedings of the Sixth Workshop on Models and Algorithms for Planning and Scheduling Problems, MAPSP'2003, Aussois (France), (2003), 147-148.
-
(2003)
Proceedings of the Sixth Workshop on Models and Algorithms for Planning and Scheduling Problems, MAPSP'2003, Aussois (France)
, pp. 147-148
-
-
Mauguière, P.1
Bouquard, J.L.2
Billaut, J.C.3
-
14
-
-
0023977010
-
SHIFTING BOTTLENECK PROCEDURE for JOB SHOP SCHEDULING
-
A. Joseph, B. Egon and Z. Daniel, "The shifting bottleneck procedure for job shop scheduling," Management Science, Vol.34, No.3, Focussed Issue on Heuristics (Mar., 1988), pp. 391-401. (Pubitemid 18580052)
-
(1988)
Management Science
, vol.34
, Issue.3
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
15
-
-
0035697265
-
Optimization of preventive maintenance scheduling for semiconductor manufacturing systems: Models and implementation
-
Y.Xiaodong, F.Michael and M.Steven I, "Optimization of preventive maintenance scheduling for semiconductor manufacturing systems: models and implementation" IEEE conference on control applications, September 5-7, 2001, Mexico.
-
IEEE Conference on Control Applications, September 5-7, 2001, Mexico
-
-
Xiaodong, Y.1
Michael, F.2
Steven I, M.3
|