메뉴 건너뛰기




Volumn , Issue , 2009, Pages 2164-2175

Adaptive flow control in flexible flow shop production systems - A knowledge-based approach

Author keywords

[No Author keywords available]

Indexed keywords

ADAPTIVE FLOWS; ADAPTIVE SCHEDULING; DIFFERENT SPEED; FLEXIBLE FLOW SHOP; KNOWLEDGE-BASED APPROACH; MANUFACTURING PROCESS; PRODUCTION STAGE; PRODUCTION SYSTEM; REAL TIME SCHEDULING; UNIFORM MACHINE;

EID: 77951597940     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2009.5429735     Document Type: Conference Paper
Times cited : (8)

References (25)
  • 1
    • 0037563233 scopus 로고    scopus 로고
    • Rescheduling of identical parallel machines under machine eligibility constraints
    • Alagöz, O., and M. Azizoglu. 2003. Rescheduling of identical parallel machines under machine eligibility constraints. European Journal of Operational Research 149 (3): 523-532.
    • (2003) European Journal of Operational Research , vol.149 , Issue.3 , pp. 523-532
    • Alagöz, O.1    Azizoglu, M.2
  • 2
    • 60749105509 scopus 로고    scopus 로고
    • Knowledge-based event control for flow-shops using simulation and rules
    • ed. S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, and J. W. Fowler, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Aufenanger, M., W. Dangelmaier, C. Laroque, and N. Rüngener. 2008. Knowledge-based event control for flow-shops using simulation and rules. In Proceedings of the 2008 Winter Simulation Conference, ed. S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, and J. W. Fowler, 1952-1958. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2008) Proceedings of the 2008 Winter Simulation Conference , pp. 1952-1958
    • Aufenanger, M.1    Dangelmaier, W.2    Laroque, C.3    Rüngener, N.4
  • 3
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H., M. A. Lawley, K. McKay, S. Mohan, and R. Uzsoy. 2005. Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research 161:86-110.
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 9
    • 0000000310 scopus 로고
    • A tree-search algorithm for mixed integer programming problems
    • Dakin, R. 1965. A tree-search algorithm for mixed integer programming problems. The Computer Journal 8 (3): 250-255.
    • (1965) The Computer Journal , vol.8 , Issue.3 , pp. 250-255
    • Dakin, R.1
  • 10
    • 77951609638 scopus 로고    scopus 로고
    • 3FACT insight - Ein Materialflusssimulator zum Erstellen und Simulieren komplexer Materialflussmodelle
    • ed. F. Hülsemann, M. Kowarschik, and U. Rüde
    • 3FACT insight - Ein Materialflusssimulator zum Erstellen und Simulieren komplexer Materialflussmodelle. In 18th Symposium Simulationstechnique, ed. F. Hülsemann, M. Kowarschik, and U. Rüde, 530-535.
    • (2005) 18th Symposium Simulationstechnique , pp. 530-535
    • Dangelmaier, W.1    Aufenanger, M.2    Laroque, C.3    Huber, D.4
  • 12
    • 0000131281 scopus 로고
    • Algorithms for solving production scheduling problems
    • Giffler, B., and G. L. Thompson. 1960. Algorithms for solving production scheduling problems. Operations Research 8 (4): 487-503.
    • (1960) Operations Research , vol.8 , Issue.4 , pp. 487-503
    • Giffler, B.1    Thompson, G.L.2
  • 15
    • 0003075019 scopus 로고
    • Optimal two- And three-stage production schedules with setup times included
    • Johnson, S. M. 1954. Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly 1:61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 17
    • 25144444242 scopus 로고    scopus 로고
    • Flexible flow shop scheduling with uniform parallel machines
    • DOI 10.1016/j.ejor.2004.05.017, PII S0377221704003972, Balancing Assembly and Transfer Lines
    • Kyparisis, G. J., and C. Koulamas. 2006. Flexible flow shop scheduling with uniform parallel machines. European Journal of Operational Research 168 (3): 985-997. (Pubitemid 41336605)
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 985-997
    • Kyparisis, G.J.1    Koulamas, C.2
  • 18
    • 0031069765 scopus 로고    scopus 로고
    • Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
    • Lawrence, S. R., and E. C. Sewell. 1997. Heuristic, optimal, static, and dynamic schedules when processing times are uncertain. Journal of Operations Management 15 (1): 71-82.
    • (1997) Journal of Operations Management , vol.15 , Issue.1 , pp. 71-82
    • Lawrence, S.R.1    Sewell, E.C.2
  • 19
    • 0032097829 scopus 로고    scopus 로고
    • Predictable scheduling of a job shop subject to breakdowns
    • PII S1042296X98029176
    • Mehta, S., and R. Uzsoy. 1998. Predictable scheduling of a job shop subject to breakdowns. IEEE Transactions on Robotics and Automation 14 (3): 365-378. (Pubitemid 128752007)
    • (1998) IEEE Transactions on Robotics and Automation , vol.14 , Issue.3 , pp. 365-378
    • Mehta, S.V.1    Uzsoy, R.M.2
  • 20
    • 0027595170 scopus 로고
    • Giffler and Thompson's algorithm for job shop scheduling is still good for flexible manufacturing systems
    • Nascimento, M. A. 1993. Giffler and Thompson's algorithm for job shop scheduling is still good for flexible manufacturing systems. The journal of the Operational Research Society 44 (5): 521-524.
    • (1993) The Journal of the Operational Research Society , vol.44 , Issue.5 , pp. 521-524
    • Nascimento, M.A.1
  • 23
    • 0024769054 scopus 로고
    • Scheduling algorithms for flexible flowshops. Worst and average case performance
    • DOI 10.1016/0377-2217(89)90208-7
    • Sriskandarajah, C., and S. Sethi. 1989. Scheduling algorithms for flexible flowshops: Worst and average case performance. European Journal of Operational Research 43 (2): 143-160. (Pubitemid 20636180)
    • (1989) European Journal of Operational Research , vol.43 , Issue.2 , pp. 143-160
    • Sriskandarajah, C.1    Sethi, S.P.2
  • 24
    • 0031525145 scopus 로고    scopus 로고
    • Rescheduling on a single machine with part-type dependent setup times and deadlines
    • Unal, A., R. Uzsoy, and A. Kiran. 1997. Rescheduling on a single machine with part-type dependent setup times and deadlines. Annals of Operations Research 70:93-113. (Pubitemid 127429151)
    • (1997) Annals of Operations Research , vol.70 , pp. 93-113
    • Unal, A.T.1    Uzsoy, R.2    Kiran, A.S.3
  • 25
    • 33745220037 scopus 로고    scopus 로고
    • Flexible flow shop scheduling: Optimum, heuristics and artificial intelligence solutions
    • DOI 10.1111/j.1468-0394.2005.00297.x
    • Wang, H. 2005. Flexible flow shop scheduling: optimum, heuristics and artificial intelligence solutions. Expert Systems 22 (2): 78-85. (Pubitemid 43906636)
    • (2005) Expert Systems , vol.22 , Issue.2 , pp. 78-85
    • Wang, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.