|
Volumn 30, Issue 11-12, 2010, Pages 1396-1408
|
The chilled water storage analysis for a university building cooling system
|
Author keywords
Chilled water storage; Economics; Electric cost saving; Partial storage load leveling; Peak demand reduction
|
Indexed keywords
CHILLED WATER;
CHILLED WATER STORAGE;
ELECTRIC COSTS;
LOAD LEVELING;
PEAK DEMAND;
AIR CONDITIONING;
COLLEGE BUILDINGS;
WATER COOLING SYSTEMS;
|
EID: 77951295701
PISSN: 13594311
EISSN: None
Source Type: Journal
DOI: 10.1016/j.applthermaleng.2010.02.029 Document Type: Article |
Times cited : (34)
|
References (12)
|