메뉴 건너뛰기




Volumn 57, Issue 2 PART 1, 2010, Pages 625-629

BES III TOF trigger sub-system

Author keywords

Field programmable gate array (FPGA); Reconfigurable; Time of flight (TOF); Trigger

Indexed keywords

FIBER-OPTICAL; GLOBAL TRIGGERS; HIGH-CAPACITY; LOGIC ALGORITHM; LOGIC MODULE; PARTICLE TRACKS; PLUG-INS; RE-CONFIGURABLE; READOUT ELECTRONICS; REAL TIME; REAR SIDE; SUB-SYSTEMS; TIME OF FLIGHT; VME BOARD; VME CRATE;

EID: 77951203029     PISSN: 00189499     EISSN: None     Source Type: Journal    
DOI: 10.1109/TNS.2009.2034521     Document Type: Conference Paper
Times cited : (6)

References (12)
  • 1
    • 77951168744 scopus 로고    scopus 로고
    • Preliminary design report of the BES-III detector Beijing
    • BES-III Collaboration
    • BES-III Collaboration, Preliminary design report of the BES-III detector Beijing, Internal Rep. IHEP-BEPCII-SB-13, 2002.
    • (2002) Internal Rep. IHEP-BEPCII-SB-13
  • 2
    • 0038853674 scopus 로고
    • Trigger system of the Beijing spectrometer
    • Dec.
    • Y. Guo et al., "Trigger system of the Beijing spectrometer," High Energy Phys. Nucl. Phys., vol. 14, no. 12, pp. 1057-1066, Dec. 1990.
    • (1990) High Energy Phys. Nucl. Phys. , vol.14 , Issue.12 , pp. 1057-1066
    • Guo, Y.1
  • 3
    • 45549114001 scopus 로고
    • A fast track finding trigger processor for the BES detector
    • Mar.
    • Z. Yu et al., "A fast track finding trigger processor for the BES detector," Nucl. Instrum. Methods A, vol. 265, no. 1-2, pp. 336-341, Mar. 1988.
    • (1988) Nucl. Instrum. Methods A , vol.265 , Issue.1-2 , pp. 336-341
    • Yu, Z.1
  • 5
    • 84945749155 scopus 로고    scopus 로고
    • The Belle detector
    • Feb.
    • A. Abashian et al., "The Belle detector," Nucl. Instrum. Methods A, vol. 479, no. 1, pp. 117-232, Feb. 2002.
    • (2002) Nucl. Instrum. Methods A , vol.479 , Issue.1 , pp. 117-232
    • Abashian, A.1
  • 7
    • 33747863625 scopus 로고    scopus 로고
    • Time measurement system prototype for BES III TOF
    • Aug.
    • J. Guo et al., "Time measurement system prototype for BES III TOF," High Energy Phys. Nucl. Phys., vol. 30, no. 8, pp. 761-766, Aug. 2006.
    • (2006) High Energy Phys. Nucl. Phys. , vol.30 , Issue.8 , pp. 761-766
    • Guo, J.1
  • 8
    • 41649106308 scopus 로고    scopus 로고
    • Muliti-channel synchronous serial transmission method of hit information in Beijing spectrometer III TOF trigger system
    • Mar.
    • X. Liu et al., "Muliti-channel synchronous serial transmission method of hit information in Beijing spectrometer III TOF trigger system," J. Jilin Univ. (Eng. Technol. Ed.), vol. 38, no. 2, pp. 483-488, Mar. 2008.
    • (2008) J. Jilin Univ. (Eng. Technol. Ed.) , vol.38 , Issue.2 , pp. 483-488
    • Liu, X.1
  • 9
    • 48349131158 scopus 로고    scopus 로고
    • FPGA based high speed data transmission with optical fiber in trigger system of BES III
    • H. Xu et al., "FPGA based high speed data transmission with optical fiber in trigger system of BES III," in 2007 IEEE Nucl. Sci. Symp. Conf. Rec., pp. 818-821.
    • 2007 IEEE Nucl. Sci. Symp. Conf. Rec. , pp. 818-821
    • Xu, H.1
  • 10
    • 57149086860 scopus 로고    scopus 로고
    • Introduction to BES III EMC sub-trigger system
    • Jan.
    • S.Wei et al., "Introduction to BES III EMC sub-trigger system," Nucl. Instrum. Methods A, vol. 598, no. 1, pp. 323-327, Jan. 2009.
    • (2009) Nucl. Instrum. Methods A , vol.598 , Issue.1 , pp. 323-327
    • Wei, S.1
  • 11
    • 42549167139 scopus 로고    scopus 로고
    • High speed data transferring technology in TOF trigger system of BES-III
    • (in Chinese) Mar.
    • S. Liu et al., "High speed data transferring technology in TOF trigger system of BES-III," (in Chinese) Nucl. Tech., vol. 31, no. 3, pp. 223-228, Mar. 2008.
    • (2008) Nucl. Tech. , vol.31 , Issue.3 , pp. 223-228
    • Liu, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.