Volumn 17, Issue 1, 2010, Pages 23-29

Contracted price overrun as contracted construction time overrun function

Author keywords

Construction; Contracted price; Contracted time; Overrun function

Indexed keywords

BUILDING CONSTRUCTION; CONSTRUCTION TIME; CONTRACTED PRICE; CONTRACTED TIME; EXPONENTIAL EQUATIONS; MODEL PARAMETERS; NATURAL LOGARITHMS; NEW CONSTRUCTION; PLANNING STAGES; PRICE FUNCTION; RISK FACTORS; TIME OVERRUN;

EID: 77951161304     PISSN: 13303651     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (20)

References (15)
  • 1
    • 77951154210 scopus 로고
    • Annual Review of Project Performance Results.World Bank
    • Annual Review of Project Performance Results.World Bank. Operational Evaluation Department, 1990.
    • (1990) Operational Evaluation Department
  • 2
    • 77951175551 scopus 로고    scopus 로고
    • Construction Project Risk and Resource Management scientific research work of MZITRH (Ministry of Science and Technology)
    • University of Zagreb, Zagreb
    • Radujković, M. Construction Project Risk and Resource Management, scientific research work of MZITRH (Ministry of Science and Technology), Faculty of Civil Engineering, University of Zagreb, Zagreb, 1999
    • (1999) Faculty of Civil Engineering
    • Radujković, M.1
  • 3
    • 84874360339 scopus 로고    scopus 로고
    • Construction Project Risk Management in a Transition Country, master's thesis
    • University of Zagreb, Zagreb
    • Nikic, R. Construction Project Risk Management in a Transition Country, master's thesis, Faculty of Civil Engineering, University of Zagreb, Zagreb, 1998.
    • (1998) Faculty of Civil Engineering
    • Nikić, R.1
  • 4
    • 77951175865 scopus 로고    scopus 로고
    • Contributing to Construction Project Management through Construction Time Planning, dissertation
    • Mostar
    • Žujo, V. Contributing to Construction Project Management through Construction Time Planning, dissertation, Faculty of Civil Engineering, Mostar, 2008.
    • (2008) Faculty of Civil Engineering
    • Žujo, V.1
  • 6
    • 0001361084 scopus 로고
    • Relationship between Value and Duration of Construction Projects
    • Kaka, A.; Price, A.D.F. Relationship between Value and Duration of Construction Projects. Construction Management and Economics, 1991 , 383-400.
    • (1991) Construction Management and Economics , pp. 383-400
    • Kaka, A.1    Price, A.D.F.2
  • 7
    • 84948516864 scopus 로고
    • A Study of the Factors Affecting Construction Duration in Hong Kong
    • Chan, D. W.M. and Kumaraswamy, M. M. A Study of the Factors Affecting Construction Duration in Hong Kong. Construction Management and Economics, 13 1995 4, 319-333
    • (1995) Construction Management and Economics , vol.13 , Issue.4 , pp. 319-333
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 8
    • 0035341251 scopus 로고    scopus 로고
    • Time-cost Relationiship of Public SectorProjects in Malaysia
    • Chan, A. P.C. Time-cost Relationiship of Public SectorProjects in Malaysia, International Journal of Project Management, 19 1999 , 223-229
    • (1999) International Journal of Project Management , vol.19 , pp. 223-229
    • Chan, A.P.C.1
  • 11
    • 0004272385 scopus 로고    scopus 로고
    • Regression Analysis-I, Regression Analysis-II, University of Wisconsin at Madison
    • Johnson, A.; Bhattacharyya, G.K., Statistics: Principles and Methods. Regression Analysis-I, Regression Analysis-II, University of Wisconsin at Madison, 2001. 477-512, 523-
    • (2001) Statistics: Principles and Methods , pp. 477-512
    • Johnson, A.1    Bhattacharyya, G.K.2
  • 12
  • 14
    • 77951157360 scopus 로고    scopus 로고
    • Federal Bureau of Statistics (December Statistical Bulletin 95, Sarajevo
    • Federal Bureau of Statistics (December 2005). Construction Industry in Federation of Bosnia and Herzegovina, Statistical Bulletin 95, Sarajevo, 73.
    • (2005) Construction Industry in Federation of Bosnia and Herzegovina , vol.73


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.