메뉴 건너뛰기




Volumn 48, Issue 12, 2010, Pages 3513-3534

A scatter search approach with dispatching rules for a joint decision of cell formation and parts scheduling in batches

Author keywords

Cell formation; Cell scheduling; Cellular manufacture

Indexed keywords

CELL FORMATION; CELL SCHEDULING; CELLULAR MANUFACTURING SYSTEMS; COMBINATION METHOD; COMPUTATIONAL RESULTS; COMPUTATIONAL STUDIES; CONCEPTUAL FRAMEWORKS; DISPATCHING RULES; IMPROVEMENT METHODS; INTEGER SOLUTIONS; INTEGER VARIABLES; JOINT DECISIONS; NON-LINEAR MIXED INTEGER PROGRAMMING; NONLINEAR TERMS; SCATTER SEARCH; SCHEDULING SUB-PROBLEM; SEARCH PROCESS; TEST PROBLEM; TOTAL TARDINESS;

EID: 77951107281     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540902922828     Document Type: Article
Times cited : (20)

References (34)
  • 2
    • 18744395185 scopus 로고    scopus 로고
    • Cell formation and layout designs in a cellular manufacturing environment-A case study
    • Bazargan-Lari, M., Kaebernick, H., and Harraf, A., 2000. Cell formation and layout designs in a cellular manufacturing environment-A case study. International Journal of Production Research, 38 (7), 1689-1709.
    • (2000) International Journal of Production Research , vol.38 , Issue.7 , pp. 1689-1709
    • Bazargan-Lari, M.1    Kaebernick, H.2    Harraf, A.3
  • 3
    • 40849088044 scopus 로고    scopus 로고
    • Cell formation problem with consideration of both intracellular and intercellular movements
    • Chan, F.T.S., et al., 2008. Cell formation problem with consideration of both intracellular and intercellular movements. International Journal of Production Research, 46 (10), 2589-2620.
    • (2008) International Journal of Production Research , vol.46 , Issue.10 , pp. 2589-2620
    • Chan, F.T.S.1
  • 4
    • 0032071783 scopus 로고    scopus 로고
    • TSP-based heuristic for forming machine groups and part families
    • Cheng, C.H., et al., 1998. TSP-based heuristic for forming machine groups and part families. International Journal of Production Research, 36 (5), 1325-1337.
    • (1998) International Journal of Production Research , vol.36 , Issue.5 , pp. 1325-1337
    • Cheng, C.H.1
  • 5
    • 0037050369 scopus 로고    scopus 로고
    • Cell formation using a fuzzy min-max neural network
    • Dobado, D., et al., 2002. Cell formation using a fuzzy min-max neural network. International Journal of Production Research, 40 (1), 93-107.
    • (2002) International Journal of Production Research , vol.40 , Issue.1 , pp. 93-107
    • Dobado, D.1
  • 6
    • 33847054816 scopus 로고    scopus 로고
    • Machine cell formation for production management in cellular manufacturing systems
    • Farouq, A. and Seifoddini, H., 2007. Machine cell formation for production management in cellular manufacturing systems. International Journal of Production Research, 45 (4), 913-934.
    • (2007) International Journal of Production Research , vol.45 , Issue.4 , pp. 913-934
    • Farouq, A.1    Seifoddini, H.2
  • 8
    • 84989487658 scopus 로고
    • Heuristics for integer programming using surrogate constraints
    • Glover, F., 1977. Heuristics for integer programming using surrogate constraints. Decision Sciences, 8, 156-166.
    • (1977) Decision Sciences , vol.8 , pp. 156-166
    • Glover, F.1
  • 9
    • 0002267257 scopus 로고    scopus 로고
    • A template for scatter search and path relinking
    • J.-K. Hao, et al., eds. (Lecture notes in computer science 1363).Berlin: Springer
    • Glover, F., 1998. A template for scatter search and path relinking, In: J.-K. Hao, et al., eds. Artificial evolution (Lecture notes in computer science 1363). Berlin: Springer, 13-54.
    • (1998) Artificial Evolution , pp. 13-54
    • Glover, F.1
  • 10
    • 27344449327 scopus 로고    scopus 로고
    • A scatter search approach to the optimum disassembly sequence problem
    • Gonzá lez, B. and Adenso-Díaz, B., 2006. A scatter search approach to the optimum disassembly sequence problem. Computers & Operations Research, 33 (6), 1776-1793.
    • (2006) Computers & Operations Research , vol.33 , Issue.6 , pp. 1776-1793
    • Gonzá Lez, B.1    Adenso-Díaz, B.2
  • 13
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • Haupt, R., 1989. A survey of priority rule-based scheduling. OR Spektrum, 11, 3-16.
    • (1989) OR Spektrum , vol.11 , pp. 3-16
    • Haupt, R.1
  • 14
    • 0030782894 scopus 로고    scopus 로고
    • Efficient dispatching rules for scheduling in a job shop
    • PII S0925527396000680
    • Holthaus, O. and Rajendran, C., 1997. Efficient dispatching rules for scheduling in a job shop. International Journal of Production Economics, 48 (1), 87-105. (Pubitemid 127410559)
    • (1997) International Journal of Production Economics , vol.48 , Issue.1 , pp. 87-105
    • Holthaus, O.1    Rajendran, C.2
  • 16
    • 21444447528 scopus 로고    scopus 로고
    • Forming part families by using genetic algorithm and designing machine cells under demand changes
    • Jeon, G. and Leep, H.R., 2006. Forming part families by using genetic algorithm and designing machine cells under demand changes. Computers & Operations Research, 33 (1), 263-283.
    • (2006) Computers & Operations Research , vol.33 , Issue.1 , pp. 263-283
    • Jeon, G.1    Leep, H.R.2
  • 17
    • 0012298197 scopus 로고
    • Priority dispatching with operation due-dates in a job shop
    • Kanet, J.J. and Hayya, J.G., 1981. Priority dispatching with operation due-dates in a job shop. Journal of Operations Management, 2, 167-176.
    • (1981) Journal of Operations Management , vol.2 , pp. 167-176
    • Kanet, J.J.1    Hayya, J.G.2
  • 18
    • 33847625433 scopus 로고    scopus 로고
    • A scatter search-based heuristic to locate capacitated transshipment points
    • Keskin, B.B. and Uster, H., 2007. A scatter search-based heuristic to locate capacitated transshipment points. Computers & Operations Research, 34 (10), 3112-3125.
    • (2007) Computers & Operations Research , vol.34 , Issue.10 , pp. 3112-3125
    • Keskin, B.B.1    Uster, H.2
  • 19
    • 4944238366 scopus 로고    scopus 로고
    • A two-phase heuristic algorithm for cell formation problems alternative part routes and machine sequences
    • Kim, C.O., Baek, J.G., and Baek, J.K., 2004. A two-phase heuristic algorithm for cell formation problems alternative part routes and machine sequences. International Journal of Production Research, 42 (18), 3911-3927.
    • (2004) International Journal of Production Research , vol.42 , Issue.18 , pp. 3911-3927
    • Kim, C.O.1    Baek, J.G.2    Baek, J.K.3
  • 20
    • 0033397380 scopus 로고    scopus 로고
    • Intensification and diversification with elite tabu search solutions for the linear ordering problem
    • Laguna, M., Martí, R., and Campos, V., 1998. Intensification and diversification with elite tabu search solutions for the linear ordering problem. Computers & Operations Research, 26 (12), 1217-1230.
    • (1998) Computers & Operations Research , vol.26 , Issue.12 , pp. 1217-1230
    • Laguna, M.1    Martí, R.2    Campos, V.3
  • 21
    • 34548386221 scopus 로고    scopus 로고
    • Scatter search heuristic for least-cost design of water distribution networks
    • Lin, M.D., et al., 2007. Scatter search heuristic for least-cost design of water distribution networks. Engineering Optimization, 39 (7), 857-876.
    • (2007) Engineering Optimization , vol.39 , Issue.7 , pp. 857-876
    • Lin, M.D.1
  • 22
    • 33847650472 scopus 로고    scopus 로고
    • A hybrid scatter search for the probabilistic travelling salesman problem
    • Liu, Y.H., 2007. A hybrid scatter search for the probabilistic travelling salesman problem. Computers & Operations Research, 34 (10), 2949-2963.
    • (2007) Computers & Operations Research , vol.34 , Issue.10 , pp. 2949-2963
    • Liu, Y.H.1
  • 24
    • 25444485816 scopus 로고    scopus 로고
    • Principles of scatter search
    • DOI 10.1016/j.ejor.2004.08.004, PII S0377221704005430, Feature Cluster on Scatter Search Methods for Optimization
    • Marti, R., Laguna, M., and Glover, F., 2006. Principles of scatter search. European Journal of Operational Research, 169 (2), 359-372. (Pubitemid 41375696)
    • (2006) European Journal of Operational Research , vol.169 , Issue.2 , pp. 359-372
    • Marti, R.1    Laguna, M.2    Glover, F.3
  • 25
    • 7544240596 scopus 로고    scopus 로고
    • A scatter search approach for the minimum sum-of-squares clustering problem
    • Pacheco, J.A., 2005. A scatter search approach for the minimum sum-of-squares clustering problem. Computers & Operations Research, 32 (5), 1325-1335.
    • (2005) Computers & Operations Research , vol.32 , Issue.5 , pp. 1325-1335
    • Pacheco, J.A.1
  • 26
    • 34848844687 scopus 로고    scopus 로고
    • Concurrent optimization of assembly tolerances for quality with position control using scatter search approach
    • DOI 10.1080/00207540600596866, PII 778983173
    • Prabhaharan, G., Ramesh, R., and Asokan, P., 2007. Concurrent optimization of assembly tolerances for quality with position control using scatter search approach. International Journal of Production Research, 45 (21), 4959-4988. (Pubitemid 47507495)
    • (2007) International Journal of Production Research , vol.45 , Issue.21 , pp. 4959-4988
    • Prabhaharan, G.1    Ramesh, R.2    Asokan, P.3
  • 27
    • 0242333827 scopus 로고    scopus 로고
    • Heuristics for scheduling sequence-dependent set-up jobs in flow line cells
    • Reddy, V. and Narendran, T.T., 2003. Heuristics for scheduling sequence-dependent set-up jobs in flow line cells. International Journal of Production Research, 41 (1), 193-206.
    • (2003) International Journal of Production Research , vol.41 , Issue.1 , pp. 193-206
    • Reddy, V.1    Narendran, T.T.2
  • 28
    • 0026156030 scopus 로고
    • Algebraic, mathematical programming, and network models of the deterministic job-shop scheduling problem
    • Rogers, R.V. and White Jr, K.P., 1991. Algebraic, mathematical programming, and network models of the deterministic job-shop scheduling problem. IEEE Transactions on Systems, Man and Cybernetics, 21 (3), 693-697.
    • (1991) IEEE Transactions on Systems, Man and Cybernetics , vol.21 , Issue.3 , pp. 693-697
    • Rogers, R.V.1    White Jr, K.P.2
  • 29
    • 0034688379 scopus 로고    scopus 로고
    • A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell
    • DOI 10.1080/002075400189419
    • Schaller, J., 2000. A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell. International Journal of Production Research, 38 (2), 287-308. (Pubitemid 35395476)
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 287-308
    • Schaller, J.1
  • 30
    • 36248985029 scopus 로고    scopus 로고
    • Scheduling in cellular manufacturing systems: An heuristic approach
    • DOI 10.1080/00207540601138577, PII 778048149, Selected papers from the 2nd Group Technology/Cellular Manufacturing World Symposium
    • Venkataramanaiah, S., 2008. Scheduling in cellular manufacturing systems: A heuristic approach. International Journal of Production Research, 46 (2), 429-449. (Pubitemid 350136917)
    • (2008) International Journal of Production Research , vol.46 , Issue.2 , pp. 429-449
    • Venkataramanaiah, S.1
  • 31
    • 69049115228 scopus 로고    scopus 로고
    • Optimization of the multi-objective dynamic cell formation problem using a scatter search approach
    • (accepted, DOI: 10.1007/s00170-008-1835-4)
    • Wang, X., Tang, J., and Yung, K., 2008. Optimization of the multi-objective dynamic cell formation problem using a scatter search approach. International Journal of Advanced Manufacturing Technology, (accepted, DOI: 10.1007/s00170-008-1835-4).
    • (2008) International Journal of Advanced Manufacturing Technology
    • Wang, X.1    Tang, J.2    Yung, K.3
  • 32
    • 0030784413 scopus 로고    scopus 로고
    • Cellular manufacturing at 46 user plants: Implementation experiences and performance improvements
    • Wemmerlov, U. and Johnson, D.J., 1997. Cellular manufacturing at 46 user plants: implementation experiences and performance improvements. International Journal of Production Research, 35 (1), 29-49. (Pubitemid 127553367)
    • (1997) International Journal of Production Research , vol.35 , Issue.1 , pp. 29-49
    • Wemmerlov, U.1    Johnson, D.J.2
  • 33
    • 9644287019 scopus 로고
    • Job and family scheduling of a flow-line manufacturing cell: A simulation study
    • Wemmerlov, U. and Vakharia, A.J., 1991. Job and family scheduling of a flow-line manufacturing cell: a simulation study. IIE Transactions, 23 (4), 383-393.
    • (1991) IIE Transactions , vol.23 , Issue.4 , pp. 383-393
    • Wemmerlov, U.1    Vakharia, A.J.2
  • 34
    • 34548244041 scopus 로고    scopus 로고
    • Genetic algorithms for integrating cell formation with machine layout and scheduling
    • DOI 10.1016/j.cie.2007.06.021, PII S0360835207001118, Selected Papers from The 27th. International Conference on Computers and Industrial Engineering - Part 2
    • Wu, X., et al., 2007. Genetic algorithms for integrating cell formation with machine layout and scheduling. Computers & Industrial Engineering, 53 (2), 277-289. (Pubitemid 47332905)
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.2 , pp. 277-289
    • Wu, X.1    Chu, C.-H.2    Wang, Y.3    Yue, D.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.