|
Volumn , Issue , 2008, Pages
|
Xiangjiaba-Shanghai highest power of UHVDC ready for implementation
a a |
Author keywords
Design principal feature implementation; HVDC transmission; UHVDC transmission
|
Indexed keywords
BULK POWER;
DAM RESERVOIRS;
DC LINE;
DC TRANSMISSION;
EAST CHINA;
HVDC TRANSMISSION;
INTEGRAL PART;
PEAK GENERATION;
SHANGHAI AREA;
UHVDC TRANSMISSION;
WATER NEEDS;
HVDC POWER TRANSMISSION;
HYDROELECTRIC POWER;
POWER GENERATION;
RESERVOIRS (WATER);
HYDROELECTRIC POWER PLANTS;
|
EID: 77950984246
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/TDC.2008.4517107 Document Type: Conference Paper |
Times cited : (7)
|
References (3)
|