Volumn , Issue , 2008, Pages
|
How the Lake Bonney wind farm met ESCOSA's, NEMMCO's, and ElectraNet's rigorous interconnecting requirements
|
Author keywords
D VAR system; Grid code; High voltage ride through; Interconnection requirements; Low voltage ride through; STATCOM; Voltage regulation; Wind farm
|
Indexed keywords
GRID CODES;
HIGH VOLTAGE;
INTERCONNECTION REQUIREMENTS;
LOW-VOLTAGE RIDE-THROUGH;
STATCOM;
VOLTAGE REGULATIONS;
WIND FARM;
ELECTRIC CURRENT REGULATORS;
ELECTRIC POWER FACTOR;
ELECTRIC POWER TRANSMISSION;
ELECTRIC UTILITIES;
FARMS;
VALUE ENGINEERING;
VOLTAGE CONTROL;
VOLTAGE REGULATORS;
WIND POWER;
|
EID: 77950965535
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/TDC.2008.4517196 Document Type: Conference Paper |
Times cited : (6)
|
References (6)
|