메뉴 건너뛰기




Volumn 50, Issue , 2009, Pages 211-222

Fitness-for-service of CO2 absorbers in ammonia plants

Author keywords

[No Author keywords available]

Indexed keywords

ABSORPTION SYSTEM; AMMONIA PLANTS; CORROSION DAMAGE; CRITICAL EQUIPMENT; FITNESS FOR SERVICE; INDUSTRY APPLICATIONS; INDUSTRY EXPERIENCE; MITIGATION TECHNIQUES; ON-LINE INSPECTION; OPERATING EFFICIENCY; REPAIR PROCESS; RUN LENGTH; SAFETY RISKS; SEVERE CORROSION;

EID: 77950810455     PISSN: 03607011     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (3)
  • 1
    • 49649097720 scopus 로고    scopus 로고
    • 2 absorber: Innovative Insitu Repair and then Replacement
    • 2 absorber: Innovative Insitu Repair and then Replacement, N. Ahmed Ammonia Technical Manual, Volume 48, 2007
    • (2007) Ammonia Technical Manual , vol.48
    • Ahmed, N.1
  • 2
    • 77950795567 scopus 로고    scopus 로고
    • Successful Repair of Absorber in Amine Service with Organic Coating
    • Successful Repair of Absorber in Amine Service with Organic Coating, J.C.R. Rico, Ammonia Technical Manual, Volume 37, 1996.
    • (1996) Ammonia Technical Manual , vol.37
    • Rico, J.C.R.1
  • 3
    • 77950814749 scopus 로고    scopus 로고
    • American Petroleum Institute, Fitness-for-Service, June
    • American Petroleum Institute, API Standard 579-1/ASME FFS-1 2007, Fitness-for-Service, June 2007.
    • (2007) API Standard 579-1/ASME FFS-1 2007


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.