-
1
-
-
11244349649
-
Job release control using a cyclic schedule
-
R.A. Bowman, Job release control using a cyclic schedule, Production and Operations Management, 11(2), 2002, 274-287.
-
(2002)
Production and Operations Management
, vol.11
, Issue.2
, pp. 274-287
-
-
Bowman, R.A.1
-
2
-
-
0036476753
-
Multicyclic hoist scheduling with constant processing times
-
A. Che, C. Chu, F. Chu, Multicyclic hoist scheduling with constant processing times, IEEE Transactions on Robotics and Automation, 18(1), 2002, 69-80.
-
(2002)
IEEE Transactions on Robotics and Automation
, vol.18
, Issue.1
, pp. 69-80
-
-
Che, A.1
Chu, C.2
Chu, F.3
-
3
-
-
0037448766
-
A polynomial algorithm for 2-degree cyclic robot scheduling
-
A. Che, C. Chu, E. Levner, A polynomial algorithm for 2-degree cyclic robot scheduling, European Journal of Operational Research, 145(1), 2003, 31-44.
-
(2003)
European Journal of Operational Research
, vol.145
, Issue.1
, pp. 31-44
-
-
Che, A.1
Chu, C.2
Levner, E.3
-
4
-
-
17644374193
-
Multi-degree cyclic scheduling of two robots in a no-wait flowshop
-
A. Che, C. Chu, Multi-degree cyclic scheduling of two robots in a no-wait flowshop, IEEE Transactions on Automation Science and Engineering, 2(2), 2005, 173-183.
-
(2005)
IEEE Transactions on Automation Science and Engineering
, vol.2
, Issue.2
, pp. 173-183
-
-
Che, A.1
Chu, C.2
-
5
-
-
33745207776
-
A faster polynomial algorithm for 2-cyclic robotic scheduling
-
C. Chu, A faster polynomial algorithm for 2-cyclic robotic scheduling, Journal of Scheduling, 9(5), 2006, 453-468.
-
(2006)
Journal of Scheduling
, vol.9
, Issue.5
, pp. 453-468
-
-
Chu, C.1
-
6
-
-
0034367676
-
Cyclic scheduling in robotic flowshop
-
Y. Crama, V. Kats, J. van de Klundert and E. Levner, Cyclic scheduling in robotic flowshop, Annals of Operations Research, 96(1-4), 2000, 97-123.
-
(2000)
Annals of Operations Research
, vol.96
, Issue.1-4
, pp. 97-123
-
-
Crama, Y.1
Kats, V.2
Van De Klundert, J.3
Levner, E.4
-
7
-
-
33645433061
-
-
Springer, Berlin
-
M. W. Dawande, H. N. Geismar, S. P. Sethi and C. Sriskandarajah, Througput Optimization in Robotic Cells, (Springer, Berlin, 2007).
-
(2007)
Througput Optimization in Robotic Cells
-
-
Dawande, M.W.1
Geismar, H.N.2
Sethi, S.P.3
Sriskandarajah, C.4
-
8
-
-
0012220631
-
Operations research techniques for robotic systems.
-
S.Y. Nof (ed.), Wiley, New York
-
N. G. Hall, Operations research techniques for robotic systems. In: S.Y. Nof (ed.), Handbook of Industrial Robotics (pp. 543-577), vol.II (Wiley, New York, 2007).
-
(2007)
Handbook of Industrial Robotics
, vol.2
, pp. 543-577
-
-
Hall, N.G.1
-
9
-
-
37049026687
-
Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence and time-window constraints
-
V. Kats, L. Lei, E. Levner, Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence and time-window constraints, European Journal of Operational Research, 187(3), 1196-1211, 2008.
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 1196-1211
-
-
Kats, V.1
Lei, L.2
Levner, E.3
-
10
-
-
0036537597
-
A new cyclic scheduling algorithm for flexible manufacturing systems
-
O. Korbaa, H. Camus and J.-C. Gentina, A new cyclic scheduling algorithm for flexible manufacturing systems, International Journal of Flexible Manufacturing Systems, 14(2), 2002, 173-187.
-
(2002)
International Journal of Flexible Manufacturing Systems
, vol.14
, Issue.2
, pp. 173-187
-
-
Korbaa, O.1
Camus, H.2
Gentina, J.-C.3
-
11
-
-
32144448734
-
Scheduling analysis of FMS: An unfolding timed Petri nets approach
-
J.-K. Lee, O. Korbaa, Scheduling analysis of FMS: an unfolding timed Petri nets approach, Mathematics and Computers in Simulation, 70(5), 2006, 419-432.
-
(2006)
Mathematics and Computers in Simulation
, vol.70
, Issue.5
, pp. 419-432
-
-
Lee, J.-K.1
Korbaa, O.2
-
12
-
-
0030691565
-
Performance measures and schedules in periodic job shops
-
T. E. Lee and M. E. Posner, Performance measures and schedules in periodic job shops, Operations Research 45(1), 1997, 72-91.
-
(1997)
Operations Research
, vol.45
, Issue.1
, pp. 72-91
-
-
Lee, T.E.1
Posner, M.E.2
-
13
-
-
0028396353
-
Determining optimal cyclic hoist schedules in a single-hoist electroplating line
-
L. Lei and T. J. Wang, Determining optimal cyclic hoist schedules in a single-hoist electroplating line, IEE Transactions, 26(2), 1994, 25-33.
-
(1994)
IEE Transactions
, vol.26
, Issue.2
, pp. 25-33
-
-
Lei, L.1
Wang, T.J.2
-
14
-
-
59349109188
-
A quadratic algorithm for the 2-cyclic robotic scheduling problem
-
P. Saez, A quadratic algorithm for the 2-cyclic robotic scheduling problem, Theoretical Computer Science, 410, 2009, 973-976.
-
(2009)
Theoretical Computer Science
, vol.410
, pp. 973-976
-
-
Saez, P.1
|