Volumn 58, Issue 4, 2010, Pages 602-609

A novel artificial immune system for solving multiobjective scheduling problems subject to special process constraint

Author keywords

Artificial immune system; Evolutionary algorithm; Multiobjective scheduling; Parallel machines

Indexed keywords

ARTIFICIAL IMMUNE SYSTEM; COMPLETION TIME; DIVERSITY TECHNIQUES; EARLINESS/TARDINESS PENALTIES; IMMUNE GENETIC ALGORITHMS; LOCAL SEARCH ALGORITHM; MAKESPAN; MULTI-OBJECTIVE SCHEDULING; MULTI-OBJECTIVE SCHEDULING PROBLEMS; PARALLEL MACHINE; SEARCH SPACES; SIMULATION RESULT; SOLUTION SPACE; SPECIAL PROCESS CONSTRAINT;

EID: 77950593822     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2009.12.009     Document Type: Article
Times cited : (28)

References (28)
  • 1
    • 0035145661 scopus 로고    scopus 로고
    • Heuristics algorithms for unrelated parallel machine scheduling with a common due date, release dates and linear earliness tardiness penalties
    • Bank J., and Werner F. Heuristics algorithms for unrelated parallel machine scheduling with a common due date, release dates and linear earliness tardiness penalties. Mathematical and Computer Modeling 33 4-5 (2001) 363-383
    • (2001) Mathematical and Computer Modeling , vol.33 , Issue.4-5 , pp. 363-383
    • Bank, J.1    Werner, F.2
  • 2
    • 64549140670 scopus 로고    scopus 로고
    • A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines
    • Chen C.L., and Chen C.L. A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines. Computers & Operations Research 36 11 (2009) 3073-3081
    • (2009) Computers & Operations Research , vol.36 , Issue.11 , pp. 3073-3081
    • Chen, C.L.1    Chen, C.L.2
  • 3
    • 67349149013 scopus 로고    scopus 로고
    • Bottleneck-based heuristics to minimize total tardiness for the flexible flow line with unrelated parallel machines
    • Chen C.L., and Chen C.L. Bottleneck-based heuristics to minimize total tardiness for the flexible flow line with unrelated parallel machines. Computers & Industrial Engineering 56 4 (2009) 1393-1401
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.4 , pp. 1393-1401
    • Chen, C.L.1    Chen, C.L.2
  • 4
    • 33745698694 scopus 로고    scopus 로고
    • Minimization of maximum tardiness on unrelated parallel machines with process restrictions and setups
    • Chen J.F. Minimization of maximum tardiness on unrelated parallel machines with process restrictions and setups. International Journal of Advanced Manufacturing Technology 29 5-6 (2006) 557-563
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , Issue.5-6 , pp. 557-563
    • Chen, J.F.1
  • 7
    • 0032156495 scopus 로고    scopus 로고
    • Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness
    • Dessouky M.M. Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness. Computers & Industrial Engineering 34 4 (1998) 793-806
    • (1998) Computers & Industrial Engineering , vol.34 , Issue.4 , pp. 793-806
    • Dessouky, M.M.1
  • 8
    • 33847144627 scopus 로고    scopus 로고
    • A parallel hybrid genetic algorithm for solving a kind of non-identical parallel machine scheduling problems
    • IEEE Computer Society, Beijing
    • Gao J.Q. A parallel hybrid genetic algorithm for solving a kind of non-identical parallel machine scheduling problems. Proceedings of the eighth conference on highperformance computing in Asia-Pacific Region (2005), IEEE Computer Society, Beijing 469-472
    • (2005) Proceedings of the eighth conference on highperformance computing in Asia-Pacific Region , pp. 469-472
    • Gao, J.Q.1
  • 9
    • 55749096385 scopus 로고    scopus 로고
    • Multi-objective scheduling problems subjected to special process constraint
    • Wang J. (Ed), IEEE Press, Hongkong
    • Gao J.Q., He G.X., and Wang Y.S. Multi-objective scheduling problems subjected to special process constraint. In: Wang J. (Ed). 2008 IEEE Congress on Evolutionary Computation (2008), IEEE Press, Hongkong 105-110
    • (2008) 2008 IEEE Congress on Evolutionary Computation , pp. 105-110
    • Gao, J.Q.1    He, G.X.2    Wang, Y.S.3
  • 10
    • 67649997345 scopus 로고    scopus 로고
    • A new parallel genetic algorithm for solving multiobjective scheduling problems subjected to special process constraint
    • Gao J.Q., He G.X., and Wang Y.S. A new parallel genetic algorithm for solving multiobjective scheduling problems subjected to special process constraint. International Journal of Advanced Manufacturing Technology 43 1-2 (2009) 151-160
    • (2009) International Journal of Advanced Manufacturing Technology , vol.43 , Issue.1-2 , pp. 151-160
    • Gao, J.Q.1    He, G.X.2    Wang, Y.S.3
  • 12
    • 0032599597 scopus 로고    scopus 로고
    • Genetic algorithms for the job-shop scheduling problem with unrelated parallel constraints: Heuristic mixing method machines and precedence
    • Ghedjati F. Genetic algorithms for the job-shop scheduling problem with unrelated parallel constraints: Heuristic mixing method machines and precedence. Computers & Industrial Engineering 37 1-2 (1999) 39-42
    • (1999) Computers & Industrial Engineering , vol.37 , Issue.1-2 , pp. 39-42
    • Ghedjati, F.1
  • 13
    • 13444278719 scopus 로고    scopus 로고
    • Makespan minimization for unrelated parallel machines: A recovering beam search approach
    • Ghirardi M., and Potts C.N. Makespan minimization for unrelated parallel machines: A recovering beam search approach. European Journal of Operational Research 165 2 (2005) 457-467
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 457-467
    • Ghirardi, M.1    Potts, C.N.2
  • 16
    • 34548500577 scopus 로고    scopus 로고
    • Application areas of AIS: The past, the present and the future
    • Hart E., and Timmis J. Application areas of AIS: The past, the present and the future. Applied Soft Computing 8 1 (2008) 191-201
    • (2008) Applied Soft Computing , vol.8 , Issue.1 , pp. 191-201
    • Hart, E.1    Timmis, J.2
  • 17
    • 54949125330 scopus 로고    scopus 로고
    • A tabu search algorithm to minimize the makespan for the unrelated parallel machines scheduling problem with setup times
    • Helal M., Rabadi G., and Al-Salem A. A tabu search algorithm to minimize the makespan for the unrelated parallel machines scheduling problem with setup times. International Journal of Operations Research 3 (2006) 182-192
    • (2006) International Journal of Operations Research , vol.3 , pp. 182-192
    • Helal, M.1    Rabadi, G.2    Al-Salem, A.3
  • 18
    • 0032141635 scopus 로고    scopus 로고
    • A multiobjective genetic local search algorithm and its application to flowshop scheduling
    • Ishibuchi H., and Murata T. A multiobjective genetic local search algorithm and its application to flowshop scheduling. IEEE Transaction on System, Man and Cybernetics 28 3 (1998) 392-403
    • (1998) IEEE Transaction on System, Man and Cybernetics , vol.28 , Issue.3 , pp. 392-403
    • Ishibuchi, H.1    Murata, T.2
  • 19
    • 33748429293 scopus 로고    scopus 로고
    • Simulated annealing and genetic algorithm for unrelated parallel machine scheduling considering set-up times
    • Kim D.W., Na D.G., Jang W., and Chen F.F. Simulated annealing and genetic algorithm for unrelated parallel machine scheduling considering set-up times. International Journal of Computer Applications in Technology 26 1-2 (2006) 28-36
    • (2006) International Journal of Computer Applications in Technology , vol.26 , Issue.1-2 , pp. 28-36
    • Kim, D.W.1    Na, D.G.2    Jang, W.3    Chen, F.F.4
  • 20
    • 34047130624 scopus 로고    scopus 로고
    • Scheduling unrelated parallel machines with sequence-dependent setups
    • Logendran R., McDonell B., and Smucker B. Scheduling unrelated parallel machines with sequence-dependent setups. Computers & Operations Research 34 11 (2007) 3420-3438
    • (2007) Computers & Operations Research , vol.34 , Issue.11 , pp. 3420-3438
    • Logendran, R.1    McDonell, B.2    Smucker, B.3
  • 21
    • 69649092061 scopus 로고    scopus 로고
    • Generating subproblems in branch and bound algorithms for parallel machines scheduling problem
    • Shim S.O. Generating subproblems in branch and bound algorithms for parallel machines scheduling problem. Computers & Industrial Engineering 57 3 (2009) 1150-1153
    • (2009) Computers & Industrial Engineering , vol.57 , Issue.3 , pp. 1150-1153
    • Shim, S.O.1
  • 22
    • 33744517681 scopus 로고    scopus 로고
    • Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry
    • Silva C., and Magalhaes J.A. Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry. Computers & Industrial Engineering 50 1-2 (2006) 76-89
    • (2006) Computers & Industrial Engineering , vol.50 , Issue.1-2 , pp. 76-89
    • Silva, C.1    Magalhaes, J.A.2
  • 23
    • 0029733044 scopus 로고    scopus 로고
    • Bicriteria scheduling problem for unrelated parallel machines
    • Suresh V., and Chaudhuri D. Bicriteria scheduling problem for unrelated parallel machines. Computers & Industrial Engineering 30 1 (1996) 77-82
    • (1996) Computers & Industrial Engineering , vol.30 , Issue.1 , pp. 77-82
    • Suresh, V.1    Chaudhuri, D.2
  • 24
    • 67349221528 scopus 로고    scopus 로고
    • Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
    • Tavakkoli-Moghaddam R., Taheri F., Bazzazi M., Izadi M., and Sassani F. Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints. Computers & Operations Research 36 12 (2009) 3224-3230
    • (2009) Computers & Operations Research , vol.36 , Issue.12 , pp. 3224-3230
    • Tavakkoli-Moghaddam, R.1    Taheri, F.2    Bazzazi, M.3    Izadi, M.4    Sassani, F.5
  • 26
    • 34147217866 scopus 로고    scopus 로고
    • Genetic algorithm for parallel machine scheduling with due windows
    • Wang L., and Li D.W. Genetic algorithm for parallel machine scheduling with due windows. Chinese Journal of System Engineering 17 1 (2002) 45-49
    • (2002) Chinese Journal of System Engineering , vol.17 , Issue.1 , pp. 45-49
    • Wang, L.1    Li, D.W.2
  • 27
    • 60549105193 scopus 로고    scopus 로고
    • An evolutionary simulation-optimization approach in solving parallel-machine scheduling problems - A case study
    • Yang T. An evolutionary simulation-optimization approach in solving parallel-machine scheduling problems - A case study. Computers & Industrial Engineering 56 3 (2009) 1126-1136
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.3 , pp. 1126-1136
    • Yang, T.1
  • 28
    • 67349131899 scopus 로고    scopus 로고
    • Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers
    • Yaurima V., Burtseva L., and Tchernykh A. Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers. Computers & Operations Research 56 4 (2009) 1452-1463
    • (2009) Computers & Operations Research , vol.56 , Issue.4 , pp. 1452-1463
    • Yaurima, V.1    Burtseva, L.2    Tchernykh, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.