![]() |
Volumn 57, Issue 3, 2009, Pages 229-239
|
Production control in moving bottlenecks in conditions of unit and small-batch production
|
Author keywords
Heuristic algorithm; Job shop scheduling; Moving bottlenecks; Theory of constraints; Unit and small batch production
|
Indexed keywords
BIG DATA;
ENTERPRISE RESOURCE PLANNING;
HEURISTIC ALGORITHMS;
INDUSTRIAL ECONOMICS;
INDUSTRIAL RESEARCH;
JOB SHOP SCHEDULING;
PRODUCTION CONTROL;
ADVANCED PLANNING SYSTEM;
MOVING BOTTLENECKS;
PLANNING SUPPORT SYSTEMS;
PRODUCTION PROCESS;
SMALL AND MEDIUM ENTERPRISE;
SMALL BATCH PRODUCTION;
SMALL- AND MEDIUM-SIZED ENTERPRISE;
THEORY OF CONSTRAINT;
OPTIMIZATION;
|
EID: 77949889534
PISSN: 02397528
EISSN: None
Source Type: Journal
DOI: 10.2478/v10175-010-0124-1 Document Type: Article |
Times cited : (4)
|
References (10)
|