메뉴 건너뛰기




Volumn 34, Issue 2, 2010, Pages 89-92

Wind power dispatch model based on constraints

Author keywords

Constraints dispatching; Model; Wind power

Indexed keywords

CONSTRAINTS DISPATCHING; DISPATCHING MODELS; ENERGY SAVING; GENERATION DISPATCH; GRID-CONNECTED; LARGE-SCALE WIND POWER; LOAD MODE; MAXIMUM OUTPUT; MODEL-BASED; POWER DISPATCHING; POWER GRIDS; POWER NETWORKS; ROLLING PLANES; SECURITY AND STABILITY; TIME ADJUSTMENT;

EID: 77949402362     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (41)

References (6)
  • 1
    • 77949360555 scopus 로고    scopus 로고
    • Chinese source
    • 2008.
    • (2008)
  • 2
    • 70049115184 scopus 로고    scopus 로고
    • Wind power forecast system of Gansu Jiuquan wind power base
    • MA Yanhong, WANG Ningbo, LIU Fuchao, et al. Wind power forecast system of Gansu Jiuquan wind power base. Automation of Electric Power Systems, 2009, 33(16): 88-90.
    • (2009) Automation of Electric Power Systems , vol.33 , Issue.16 , pp. 88-90
    • Ma, Y.1    Wang, N.2    Liu, F.3
  • 3
    • 16644367195 scopus 로고    scopus 로고
    • Studies on wind farm integration into power system
    • LEI Yazhou. Studies on wind farm integration into power system. Automation of Electric Power Systems, 2003, 27(8): 84-89.
    • (2003) Automation of Electric Power Systems , vol.27 , Issue.8 , pp. 84-89
    • Lei, Y.1
  • 4
    • 36549014713 scopus 로고    scopus 로고
    • Studies on the transient behavior and dispatching strategy of power system integrated with large scale wind farm
    • ZHANG Hongguang, ZHANG Lizi, CHENG Shuyong, et al. Studies on the transient behavior and dispatching strategy of power system integrated with large scale wind farm. Proceedings of the CSEE, 2007, 27(31): 45-51.
    • (2007) Proceedings of the CSEE , vol.27 , Issue.31 , pp. 45-51
    • Zhang, H.1    Zhang, L.2    Cheng, S.3
  • 5
    • 73449099410 scopus 로고    scopus 로고
    • Power system operation and stability problems caused by integration of large-scale wind power and corresponding solutions
    • CHI Yongning, LI Qunying, LI Yan, et al. Power system operation and stability problems caused by integration of large-scale wind power and corresponding solutions. Electrical Equipment, 2008, 9(11): 16-19.
    • (2008) Electrical Equipment , vol.9 , Issue.11 , pp. 16-19
    • Chi, Y.1    Li, Q.2    Li, Y.3
  • 6
    • 77949369922 scopus 로고    scopus 로고
    • Industry analysis and countermeasures of wind power complete sets of equipment manufacturing
    • SHAN Chao, LIU Guangde, WANG Qi, et al. Industry analysis and countermeasures of wind power complete sets of equipment manufacturing. Corporation Research, 2007, 19(8): 48-49.
    • (2007) Corporation Research , vol.19 , Issue.8 , pp. 48-49
    • Shan, C.1    Liu, G.2    Wang, Q.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.