-
1
-
-
77349110234
-
-
Ahmed S. Strategic planning under uncertainty: stochastic integer programming approaches. Ph.D. thesis, University of Illinois at Urbana-Champaign, 2000.
-
Ahmed S. Strategic planning under uncertainty: stochastic integer programming approaches. Ph.D. thesis, University of Illinois at Urbana-Champaign, 2000.
-
-
-
-
2
-
-
0036013019
-
The sample average approximation method for stochastic programs with integer recourse
-
Ahmed S., and Shapiro A. The sample average approximation method for stochastic programs with integer recourse. SIAM Journal on Optimization 12 (2002) 479-502
-
(2002)
SIAM Journal on Optimization
, vol.12
, pp. 479-502
-
-
Ahmed, S.1
Shapiro, A.2
-
3
-
-
77957036347
-
Network reliability
-
Ball M.O., et al. (Ed), Elsevier Science, Amsterdam
-
Ball M.O., Colbourn C.J., and Colbourn J.S. Network reliability. In: Ball M.O., et al. (Ed). Handbooks of operations research and management science: network models (1995), Elsevier Science, Amsterdam
-
(1995)
Handbooks of operations research and management science: network models
-
-
Ball, M.O.1
Colbourn, C.J.2
Colbourn, J.S.3
-
4
-
-
34247580828
-
Prioritization of bridges and tunnels in earthquake risk mitigation using multicriteria decision analysis: application to Lisbon
-
Bana e Costa C.A., Oliveira C.S., and Vieira V. Prioritization of bridges and tunnels in earthquake risk mitigation using multicriteria decision analysis: application to Lisbon. Omega 36 3 (2008) 442-450
-
(2008)
Omega
, vol.36
, Issue.3
, pp. 442-450
-
-
Bana e Costa, C.A.1
Oliveira, C.S.2
Vieira, V.3
-
5
-
-
0042218111
-
Prioritization of bridges for seismic retrofitting
-
Report 114, John Blume Earthquake Engineering Center, Department of Civil Engineering, Stanford University, Stanford, CA;
-
Basöz N, Kiremidjian AS. Prioritization of bridges for seismic retrofitting. Report 114, John Blume Earthquake Engineering Center, Department of Civil Engineering, Stanford University, Stanford, CA; 1995.
-
(1995)
-
-
Basöz, N.1
Kiremidjian, A.S.2
-
7
-
-
0008230792
-
L-shaped decomposition of two-stage stochastic programs with integer recourse
-
Carøe C.C., and Tind J. L-shaped decomposition of two-stage stochastic programs with integer recourse. Mathematical Programming 83 (1998) 451-464
-
(1998)
Mathematical Programming
, vol.83
, pp. 451-464
-
-
Carøe, C.C.1
Tind, J.2
-
8
-
-
0036497661
-
Capacity reliability of a road network: an assessment methodology and numerical results
-
Chen A., Yang H., Lo H.K., and Tang W.H. Capacity reliability of a road network: an assessment methodology and numerical results. Transportation Research Part B-Methodological 36 3 (2002) 225-252
-
(2002)
Transportation Research Part B-Methodological
, vol.36
, Issue.3
, pp. 225-252
-
-
Chen, A.1
Yang, H.2
Lo, H.K.3
Tang, W.H.4
-
9
-
-
11144340813
-
Modeling network travel time reliability under stochastic demand
-
Clark S., and Watling D. Modeling network travel time reliability under stochastic demand. Transportation Research Part B-Methodological 39 2 (2005) 119-140
-
(2005)
Transportation Research Part B-Methodological
, vol.39
, Issue.2
, pp. 119-140
-
-
Clark, S.1
Watling, D.2
-
10
-
-
0028442754
-
The northridge earthquake: progress made, lessons learned in seismic-resistant bridge design
-
Cooper J.D., Friedland I.M., Buckle I.G., Nimis R.B., and Bobb N.M. The northridge earthquake: progress made, lessons learned in seismic-resistant bridge design. Public Roads 58 1 (1994)
-
(1994)
Public Roads
, vol.58
, Issue.1
-
-
Cooper, J.D.1
Friedland, I.M.2
Buckle, I.G.3
Nimis, R.B.4
Bobb, N.M.5
-
11
-
-
33745684030
-
A class of stochastic programs with decision dependent uncertainty
-
Goel V., and Grossmann I.E. A class of stochastic programs with decision dependent uncertainty. Mathematical Programming, Series B 108 (2006) 355-394
-
(2006)
Mathematical Programming, Series B
, vol.108
, pp. 355-394
-
-
Goel, V.1
Grossmann, I.E.2
-
14
-
-
0036013019
-
The sample average approximation method for stochastic discrete optimization
-
Kleywegt A.J., Shapiro A., and Homem-de-Mello T. The sample average approximation method for stochastic discrete optimization. SIAM Journal on Optimization 12 2 (2002) 479-502
-
(2002)
SIAM Journal on Optimization
, vol.12
, Issue.2
, pp. 479-502
-
-
Kleywegt, A.J.1
Shapiro, A.2
Homem-de-Mello, T.3
-
15
-
-
0000415520
-
The integer L-shaped method for stochastic integer programs with complete recourse
-
Laporte G., and Louveaux F.V. The integer L-shaped method for stochastic integer programs with complete recourse. Operational Research Letter 13 (1993) 133-142
-
(1993)
Operational Research Letter
, vol.13
, pp. 133-142
-
-
Laporte, G.1
Louveaux, F.V.2
-
16
-
-
33745028568
-
Degradable transport network: travel time budget of travelers with heterogeneous risk aversion
-
Lo H.K., Luo X.W., and Siu B.W.Y. Degradable transport network: travel time budget of travelers with heterogeneous risk aversion. Transportation Research Part B-Methodological 40 9 (2006) 792-806
-
(2006)
Transportation Research Part B-Methodological
, vol.40
, Issue.9
, pp. 792-806
-
-
Lo, H.K.1
Luo, X.W.2
Siu, B.W.Y.3
-
17
-
-
0037401572
-
Network with degradable links: capacity analysis and design
-
Lo H.K., and Tung Y.K. Network with degradable links: capacity analysis and design. Transportation Research Part B-Methodological 37 4 (2003) 345-363
-
(2003)
Transportation Research Part B-Methodological
, vol.37
, Issue.4
, pp. 345-363
-
-
Lo, H.K.1
Tung, Y.K.2
-
21
-
-
46649114342
-
Methodology for the development of analytical fragility curves for retrofitted bridges
-
Padgett J.E., and DesRoches R. Methodology for the development of analytical fragility curves for retrofitted bridges. Earthquake Engineering and Structural Dynamics 37 (2008) 1157-1174
-
(2008)
Earthquake Engineering and Structural Dynamics
, vol.37
, pp. 1157-1174
-
-
Padgett, J.E.1
DesRoches, R.2
-
22
-
-
0034724954
-
Heightened odds of large earthquakes near Istanbul: an interaction-based probability calculation
-
Parsons T., Toda S., Stein R.S., Barka A., and Dieterich J.H. Heightened odds of large earthquakes near Istanbul: an interaction-based probability calculation. Science 288 (2000) 661-665
-
(2000)
Science
, vol.288
, pp. 661-665
-
-
Parsons, T.1
Toda, S.2
Stein, R.S.3
Barka, A.4
Dieterich, J.H.5
-
23
-
-
77349093561
-
-
Ramirez J, Peeta S, Sozen M, Garcia L, Viswanath K. Emergency earthquake routes for the state of Indiana; Part I: criteria for selection of primary routes: transportation aspects; Part II: route seismic vulnerability aspects. Report Number FHWA/IN/JTRP-2003/22 2005. Joint Transportation Research Program, Purdue University. 504p.
-
Ramirez J, Peeta S, Sozen M, Garcia L, Viswanath K. Emergency earthquake routes for the state of Indiana; Part I: criteria for selection of primary routes: transportation aspects; Part II: route seismic vulnerability aspects. Report Number FHWA/IN/JTRP-2003/22 2005. Joint Transportation Research Program, Purdue University. 504p.
-
-
-
-
24
-
-
4344585538
-
A transport network reliability model for the efficient assignment of resources
-
Sanchez-Silva M., Daniels M., Lleras G., and Patino D. A transport network reliability model for the efficient assignment of resources. Transportation Research Part B-Methodological 39 1 (2005) 47-63
-
(2005)
Transportation Research Part B-Methodological
, vol.39
, Issue.1
, pp. 47-63
-
-
Sanchez-Silva, M.1
Daniels, M.2
Lleras, G.3
Patino, D.4
-
25
-
-
0009313925
-
Performability of a congested urban transportation network when accident information is available
-
Sanso B., and Milot L. Performability of a congested urban transportation network when accident information is available. Transportation Science 33 1 (1999) 68-79
-
(1999)
Transportation Science
, vol.33
, Issue.1
, pp. 68-79
-
-
Sanso, B.1
Milot, L.2
-
26
-
-
12344324433
-
Stochastic programming with integer variables
-
Schultz R. Stochastic programming with integer variables. Mathematical Programming Series B 97 (2003) 285-309
-
(2003)
Mathematical Programming Series B
, vol.97
, pp. 285-309
-
-
Schultz, R.1
-
27
-
-
31744441041
-
Decomposition with branch-and-cut approaches for two-stage stochastic mixed-integer programming
-
Sen S., and Sherali H.D. Decomposition with branch-and-cut approaches for two-stage stochastic mixed-integer programming. Mathematical Programming Series A 106 (2006) 203-223
-
(2006)
Mathematical Programming Series A
, vol.106
, pp. 203-223
-
-
Sen, S.1
Sherali, H.D.2
-
28
-
-
33645888408
-
Evaluating the significance of highway network links under the flood damage: an accessibility approach
-
Sohn J. Evaluating the significance of highway network links under the flood damage: an accessibility approach. Transportation Research Part A Policy and Practice 40 6 (2006) 491-506
-
(2006)
Transportation Research Part A Policy and Practice
, vol.40
, Issue.6
, pp. 491-506
-
-
Sohn, J.1
-
29
-
-
0347029827
-
Retrofit priority of transportation network links under an earthquake
-
Sohn J., Kim T.J., Hewings G.J.D., Lee J.S., and Jang S. Retrofit priority of transportation network links under an earthquake. Journal of Urban Planning and Development 129 4 (2003) 195-210
-
(2003)
Journal of Urban Planning and Development
, vol.129
, Issue.4
, pp. 195-210
-
-
Sohn, J.1
Kim, T.J.2
Hewings, G.J.D.3
Lee, J.S.4
Jang, S.5
-
31
-
-
2142750219
-
The multicommodity maximal covering network design problem for planning critical routes for earthquake response
-
Viswanath K., and Peeta S. The multicommodity maximal covering network design problem for planning critical routes for earthquake response. Transportation Research Record 1857 (2003) 1-10
-
(2003)
Transportation Research Record
, vol.1857
, pp. 1-10
-
-
Viswanath, K.1
Peeta, S.2
-
32
-
-
84987041118
-
Investing in arcs in a network to maximize the expected max flow
-
Wallace S.W. Investing in arcs in a network to maximize the expected max flow. Networks 17 (1987) 87-103
-
(1987)
Networks
, vol.17
, pp. 87-103
-
-
Wallace, S.W.1
-
33
-
-
0031270310
-
Loss estimation due to seismic risks to highway systems
-
Werner S.D., Taylor C.E., and Moore J.E. Loss estimation due to seismic risks to highway systems. Earthquake Spectra 13 4 (1997) 585-604
-
(1997)
Earthquake Spectra
, vol.13
, Issue.4
, pp. 585-604
-
-
Werner, S.D.1
Taylor, C.E.2
Moore, J.E.3
-
34
-
-
84986977097
-
Investment in stochastic minimum cost generalized multi-commodity networks with application to coal transport
-
Wollmer R.D. Investment in stochastic minimum cost generalized multi-commodity networks with application to coal transport. Networks 10 (1980) 351-362
-
(1980)
Networks
, vol.10
, pp. 351-362
-
-
Wollmer, R.D.1
-
35
-
-
34249924690
-
Investments in stochastic maximum flow networks
-
Wollmer R.D. Investments in stochastic maximum flow networks. Annals of Operational Research 31 (1991) 459-468
-
(1991)
Annals of Operational Research
, vol.31
, pp. 459-468
-
-
Wollmer, R.D.1
|