메뉴 건너뛰기




Volumn 49, Issue 2, 2010, Pages 71-78

Optimization of production performance in a CO2 flooding reservoir under uncertainty

Author keywords

[No Author keywords available]

Indexed keywords

BOTTOM HOLE PRESSURE; CARBON DIOXIDE; FLOODS; GAS INDUSTRY; GENETIC ALGORITHMS; PETROLEUM INDUSTRY; PETROLEUM RESERVOIR ENGINEERING; PETROLEUM RESERVOIRS; RESERVOIRS (WATER); UNCERTAINTY ANALYSIS;

EID: 77149120778     PISSN: 00219487     EISSN: None     Source Type: Journal    
DOI: 10.2118/133374-PA     Document Type: Article
Times cited : (35)

References (18)
  • 1
    • 0038491635 scopus 로고    scopus 로고
    • Practical Aspects of C02 Flooding
    • SPE, Richardson, Texas
    • Jarrell, P., Fox, C., Stein, M., and Webb, S. L. 2002. Practical Aspects of C02 Flooding. Monograph Series, SPE, Richardson, Texas 22.
    • (2002) Monograph Series , vol.22
    • Jarrell, P.1    Fox, C.2    Stein, M.3    Webb, S.L.4
  • 2
    • 85126168048 scopus 로고    scopus 로고
    • Davidson, J. E. and Beckner, B. L. 2003. Integrated Optimization for Rate Allocation in Reservoir Simulation. SPE Res Eval & Eng 6(6):426-432. SPE-87309-PA. doi:10.2118/87309-PA.
    • Davidson, J. E. and Beckner, B. L. 2003. Integrated Optimization for Rate Allocation in Reservoir Simulation. SPE Res Eval & Eng 6(6):426-432. SPE-87309-PA. doi:10.2118/87309-PA.
  • 3
    • 0037292026 scopus 로고    scopus 로고
    • Integrated Optimization and Control of the Production-Injection Operation Systems for Hydrocarbon Reservoirs
    • doi:10.1016/S0920-4105 (02) 00311-X
    • Yang, D., Zhang, Q., and Gu, Y. 2003. Integrated Optimization and Control of the Production-Injection Operation Systems for Hydrocarbon Reservoirs. J. Pet. Sci. Eng. 37 (1-2) 69-81. doi:10.1016/S0920-4105 (02) 00311-X.
    • (2003) J. Pet. Sci. Eng , vol.37 , Issue.1-2 , pp. 69-81
    • Yang, D.1    Zhang, Q.2    Gu, Y.3
  • 4
    • 1142290703 scopus 로고    scopus 로고
    • Sudaryanto, B. and Yortsos, Y. C. 2001. Optimization of displacement in porous media using rate control. Paper 71509 presented at the SPE Annual Technical Conference and Exhibition, New Orleans, 30 September-3 October. doi:10.2118/71509-MS.
    • Sudaryanto, B. and Yortsos, Y. C. 2001. Optimization of displacement in porous media using rate control. Paper 71509 presented at the SPE Annual Technical Conference and Exhibition, New Orleans, 30 September-3 October. doi:10.2118/71509-MS.
  • 5
    • 33745479495 scopus 로고    scopus 로고
    • Fyrozjaee, H. and Yortsos, Y. C. 2006. Control of a Displacement Front in Potential Flow Using Flow-Rate Partition. Paper SPE 99524 presented at the Intelligent Energy Conference and Exhibition, Amsterdam, 11-13 April. doi:10.2118/99524-MS.
    • Fyrozjaee, H. and Yortsos, Y. C. 2006. Control of a Displacement Front in Potential Flow Using Flow-Rate Partition. Paper SPE 99524 presented at the Intelligent Energy Conference and Exhibition, Amsterdam, 11-13 April. doi:10.2118/99524-MS.
  • 6
    • 34250834574 scopus 로고    scopus 로고
    • Liang, X., Weber, D. B., Edgar, T. F., Lake, L. W., Sayarpour, M., and Al-Yousef, A. 2007. Optimization of Oil Production in a Reservoir Based on Capacitance Model of Production and Injection Rates. Paper SPE 107713 presented at the Hydrocarbon Economics and Evaluation Symposium, Dallas, 1-3 April. doi:10.2118/107713-MS.
    • Liang, X., Weber, D. B., Edgar, T. F., Lake, L. W., Sayarpour, M., and Al-Yousef, A. 2007. Optimization of Oil Production in a Reservoir Based on Capacitance Model of Production and Injection Rates. Paper SPE 107713 presented at the Hydrocarbon Economics and Evaluation Symposium, Dallas, 1-3 April. doi:10.2118/107713-MS.
  • 7
    • 36148978912 scopus 로고    scopus 로고
    • Alhuthali, A., Oyerinde, D., and Datta-Gupta, A. 2007. Optimal Waterflood Management Using Rate Control. SPE Res Eval & Eng 10(5):539-551. SPE-102478-PA. doi:10.2118/102478-PA.
    • Alhuthali, A., Oyerinde, D., and Datta-Gupta, A. 2007. Optimal Waterflood Management Using Rate Control. SPE Res Eval & Eng 10(5):539-551. SPE-102478-PA. doi:10.2118/102478-PA.
  • 8
    • 85126168048 scopus 로고    scopus 로고
    • Davidson, J. E. and Beckner, B. L. 2003. Integrated Optimization for Rate Allocation in Reservoir Simulation. SPE Res Eval & Eng 6(6):426-432. SPE-87309-PA. doi:10.2118/87309-PA.
    • Davidson, J. E. and Beckner, B. L. 2003. Integrated Optimization for Rate Allocation in Reservoir Simulation. SPE Res Eval & Eng 6(6):426-432. SPE-87309-PA. doi:10.2118/87309-PA.
  • 9
    • 1642528318 scopus 로고    scopus 로고
    • Use of reservoir simulation for optimizing recovery performance
    • doi:10.1016/j. petrol.2003.12.010
    • Gharbi, R. B. C. 2004. Use of reservoir simulation for optimizing recovery performance. J. Pet. Sci. Eng. 42 (2-4) 183-194. doi:10.1016/j. petrol.2003.12.010.
    • (2004) J. Pet. Sci. Eng , vol.42 , Issue.2-4 , pp. 183-194
    • Gharbi, R.B.C.1
  • 10
    • 0347819427 scopus 로고    scopus 로고
    • Zapata, V. J., Brummett, W. M., Osborne, M. E., and Van Nispen, D. J. 2001. Advances in Tightly Coupled Reservoir/Wellbore/Surface-Network Simulation. SPE Res Eval & Eng 4(2):114-120. SPE-71120-PA. doi:10.2118/71120-PA.
    • Zapata, V. J., Brummett, W. M., Osborne, M. E., and Van Nispen, D. J. 2001. Advances in Tightly Coupled Reservoir/Wellbore/Surface-Network Simulation. SPE Res Eval & Eng 4(2):114-120. SPE-71120-PA. doi:10.2118/71120-PA.
  • 11
    • 0032092248 scopus 로고    scopus 로고
    • Harding, T. J., Radcliffe, N. J., and King, P. R. 1998. Hydrocarbon Production Scheduling With Genetic Algorithms. SPE J. 3(2):99-107. SPE-36379-PA. doi:10.2118/36379-PA.
    • Harding, T. J., Radcliffe, N. J., and King, P. R. 1998. Hydrocarbon Production Scheduling With Genetic Algorithms. SPE J. 3(2):99-107. SPE-36379-PA. doi:10.2118/36379-PA.
  • 12
    • 3242786974 scopus 로고    scopus 로고
    • Zandin, K. B. ed, 5th edition. Columbus, Ohio: McGraw-Hill Standard Handbooks, McGraw-Hill
    • Zandin, K. B. ed. 2001. Maynard's Industrial Engineering Handbook, 5th edition. Columbus, Ohio: McGraw-Hill Standard Handbooks, McGraw-Hill.
    • (2001) Maynard's Industrial Engineering Handbook
  • 13
    • 85126171945 scopus 로고    scopus 로고
    • Ates, H., Bahar, A., and El-Abd, S., Charfeddine, M., Kelkar, M., and Datta-Gupta, A. 2005. Ranking and Upscaling of Geostatistical Reservoir Models Using Streamline Simulation: A Field Case Study. SPE Res Eval & Eng 8(1):22-32. SPE-81497-PA. doi:10.2118/81497-PA.
    • Ates, H., Bahar, A., and El-Abd, S., Charfeddine, M., Kelkar, M., and Datta-Gupta, A. 2005. Ranking and Upscaling of Geostatistical Reservoir Models Using Streamline Simulation: A Field Case Study. SPE Res Eval & Eng 8(1):22-32. SPE-81497-PA. doi:10.2118/81497-PA.
  • 14
    • 77149147984 scopus 로고    scopus 로고
    • Justice, J. H., Woerpel, J. C., Watts, G. P., and Waddell, W. 2000. Geostatistical Reservoir Characterization Using Interwell Seismic Data. Paper SPE 62973 presented at the SPE Annual Technical Conference and Exhibition, Dallas, 1-4 October. doi:10.2118/62973-MS.
    • Justice, J. H., Woerpel, J. C., Watts, G. P., and Waddell, W. 2000. Geostatistical Reservoir Characterization Using Interwell Seismic Data. Paper SPE 62973 presented at the SPE Annual Technical Conference and Exhibition, Dallas, 1-4 October. doi:10.2118/62973-MS.
  • 15
    • 0023313309 scopus 로고    scopus 로고
    • Seba, R. D. 1987. Determining Project Profitability. J. Pet Tech 39(3):263-271. SPE-16449-PA. doi:10.2118/16449-PA.
    • Seba, R. D. 1987. Determining Project Profitability. J. Pet Tech 39(3):263-271. SPE-16449-PA. doi:10.2118/16449-PA.
  • 16
    • 0029359757 scopus 로고    scopus 로고
    • Fujii, H. and Horne, R. 1995. Multivariate Optimization of Networked Production Systems. SPE Prod & Fac 10(3):165-171. SPE-27617-PA. doi:10.2118/27617-PA.
    • Fujii, H. and Horne, R. 1995. Multivariate Optimization of Networked Production Systems. SPE Prod & Fac 10(3):165-171. SPE-27617-PA. doi:10.2118/27617-PA.
  • 17
    • 77149131132 scopus 로고    scopus 로고
    • Real-time Reservoir Geological Model Updating Using the Hybrid EnKF and Geostatistical Technique
    • Paper CIPC 2008-128 presented at the, Calgary, 17-19 June. doi:10.2118/2008-128-EA
    • Li, H., Chen, S., and Yang, D. 2008. Real-time Reservoir Geological Model Updating Using the Hybrid EnKF and Geostatistical Technique. Paper CIPC 2008-128 presented at the Canadian International Petroleum Conference, Calgary, 17-19 June. doi:10.2118/2008-128-EA.
    • (2008) Canadian International Petroleum Conference
    • Li, H.1    Chen, S.2    Yang, D.3
  • 18
    • 0034978702 scopus 로고    scopus 로고
    • Integration of production data into reservoir models
    • 1 May
    • Oliver, D. S., Reynolds, A. C., Bi, Z., and Abacioglu, Y. 2001. Integration of production data into reservoir models. Petroleum Geoscience 7 (Supplement, 1 May) 65-73.
    • (2001) Petroleum Geoscience , vol.7 , Issue.SUPPL.EMENT , pp. 65-73
    • Oliver, D.S.1    Reynolds, A.C.2    Bi, Z.3    Abacioglu, Y.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.