-
1
-
-
0038491635
-
Practical Aspects of C02 Flooding
-
SPE, Richardson, Texas
-
Jarrell, P., Fox, C., Stein, M., and Webb, S. L. 2002. Practical Aspects of C02 Flooding. Monograph Series, SPE, Richardson, Texas 22.
-
(2002)
Monograph Series
, vol.22
-
-
Jarrell, P.1
Fox, C.2
Stein, M.3
Webb, S.L.4
-
2
-
-
85126168048
-
-
Davidson, J. E. and Beckner, B. L. 2003. Integrated Optimization for Rate Allocation in Reservoir Simulation. SPE Res Eval & Eng 6(6):426-432. SPE-87309-PA. doi:10.2118/87309-PA.
-
Davidson, J. E. and Beckner, B. L. 2003. Integrated Optimization for Rate Allocation in Reservoir Simulation. SPE Res Eval & Eng 6(6):426-432. SPE-87309-PA. doi:10.2118/87309-PA.
-
-
-
-
3
-
-
0037292026
-
Integrated Optimization and Control of the Production-Injection Operation Systems for Hydrocarbon Reservoirs
-
doi:10.1016/S0920-4105 (02) 00311-X
-
Yang, D., Zhang, Q., and Gu, Y. 2003. Integrated Optimization and Control of the Production-Injection Operation Systems for Hydrocarbon Reservoirs. J. Pet. Sci. Eng. 37 (1-2) 69-81. doi:10.1016/S0920-4105 (02) 00311-X.
-
(2003)
J. Pet. Sci. Eng
, vol.37
, Issue.1-2
, pp. 69-81
-
-
Yang, D.1
Zhang, Q.2
Gu, Y.3
-
4
-
-
1142290703
-
-
Sudaryanto, B. and Yortsos, Y. C. 2001. Optimization of displacement in porous media using rate control. Paper 71509 presented at the SPE Annual Technical Conference and Exhibition, New Orleans, 30 September-3 October. doi:10.2118/71509-MS.
-
Sudaryanto, B. and Yortsos, Y. C. 2001. Optimization of displacement in porous media using rate control. Paper 71509 presented at the SPE Annual Technical Conference and Exhibition, New Orleans, 30 September-3 October. doi:10.2118/71509-MS.
-
-
-
-
5
-
-
33745479495
-
-
Fyrozjaee, H. and Yortsos, Y. C. 2006. Control of a Displacement Front in Potential Flow Using Flow-Rate Partition. Paper SPE 99524 presented at the Intelligent Energy Conference and Exhibition, Amsterdam, 11-13 April. doi:10.2118/99524-MS.
-
Fyrozjaee, H. and Yortsos, Y. C. 2006. Control of a Displacement Front in Potential Flow Using Flow-Rate Partition. Paper SPE 99524 presented at the Intelligent Energy Conference and Exhibition, Amsterdam, 11-13 April. doi:10.2118/99524-MS.
-
-
-
-
6
-
-
34250834574
-
-
Liang, X., Weber, D. B., Edgar, T. F., Lake, L. W., Sayarpour, M., and Al-Yousef, A. 2007. Optimization of Oil Production in a Reservoir Based on Capacitance Model of Production and Injection Rates. Paper SPE 107713 presented at the Hydrocarbon Economics and Evaluation Symposium, Dallas, 1-3 April. doi:10.2118/107713-MS.
-
Liang, X., Weber, D. B., Edgar, T. F., Lake, L. W., Sayarpour, M., and Al-Yousef, A. 2007. Optimization of Oil Production in a Reservoir Based on Capacitance Model of Production and Injection Rates. Paper SPE 107713 presented at the Hydrocarbon Economics and Evaluation Symposium, Dallas, 1-3 April. doi:10.2118/107713-MS.
-
-
-
-
7
-
-
36148978912
-
-
Alhuthali, A., Oyerinde, D., and Datta-Gupta, A. 2007. Optimal Waterflood Management Using Rate Control. SPE Res Eval & Eng 10(5):539-551. SPE-102478-PA. doi:10.2118/102478-PA.
-
Alhuthali, A., Oyerinde, D., and Datta-Gupta, A. 2007. Optimal Waterflood Management Using Rate Control. SPE Res Eval & Eng 10(5):539-551. SPE-102478-PA. doi:10.2118/102478-PA.
-
-
-
-
8
-
-
85126168048
-
-
Davidson, J. E. and Beckner, B. L. 2003. Integrated Optimization for Rate Allocation in Reservoir Simulation. SPE Res Eval & Eng 6(6):426-432. SPE-87309-PA. doi:10.2118/87309-PA.
-
Davidson, J. E. and Beckner, B. L. 2003. Integrated Optimization for Rate Allocation in Reservoir Simulation. SPE Res Eval & Eng 6(6):426-432. SPE-87309-PA. doi:10.2118/87309-PA.
-
-
-
-
9
-
-
1642528318
-
Use of reservoir simulation for optimizing recovery performance
-
doi:10.1016/j. petrol.2003.12.010
-
Gharbi, R. B. C. 2004. Use of reservoir simulation for optimizing recovery performance. J. Pet. Sci. Eng. 42 (2-4) 183-194. doi:10.1016/j. petrol.2003.12.010.
-
(2004)
J. Pet. Sci. Eng
, vol.42
, Issue.2-4
, pp. 183-194
-
-
Gharbi, R.B.C.1
-
10
-
-
0347819427
-
-
Zapata, V. J., Brummett, W. M., Osborne, M. E., and Van Nispen, D. J. 2001. Advances in Tightly Coupled Reservoir/Wellbore/Surface-Network Simulation. SPE Res Eval & Eng 4(2):114-120. SPE-71120-PA. doi:10.2118/71120-PA.
-
Zapata, V. J., Brummett, W. M., Osborne, M. E., and Van Nispen, D. J. 2001. Advances in Tightly Coupled Reservoir/Wellbore/Surface-Network Simulation. SPE Res Eval & Eng 4(2):114-120. SPE-71120-PA. doi:10.2118/71120-PA.
-
-
-
-
11
-
-
0032092248
-
-
Harding, T. J., Radcliffe, N. J., and King, P. R. 1998. Hydrocarbon Production Scheduling With Genetic Algorithms. SPE J. 3(2):99-107. SPE-36379-PA. doi:10.2118/36379-PA.
-
Harding, T. J., Radcliffe, N. J., and King, P. R. 1998. Hydrocarbon Production Scheduling With Genetic Algorithms. SPE J. 3(2):99-107. SPE-36379-PA. doi:10.2118/36379-PA.
-
-
-
-
12
-
-
3242786974
-
-
Zandin, K. B. ed, 5th edition. Columbus, Ohio: McGraw-Hill Standard Handbooks, McGraw-Hill
-
Zandin, K. B. ed. 2001. Maynard's Industrial Engineering Handbook, 5th edition. Columbus, Ohio: McGraw-Hill Standard Handbooks, McGraw-Hill.
-
(2001)
Maynard's Industrial Engineering Handbook
-
-
-
13
-
-
85126171945
-
-
Ates, H., Bahar, A., and El-Abd, S., Charfeddine, M., Kelkar, M., and Datta-Gupta, A. 2005. Ranking and Upscaling of Geostatistical Reservoir Models Using Streamline Simulation: A Field Case Study. SPE Res Eval & Eng 8(1):22-32. SPE-81497-PA. doi:10.2118/81497-PA.
-
Ates, H., Bahar, A., and El-Abd, S., Charfeddine, M., Kelkar, M., and Datta-Gupta, A. 2005. Ranking and Upscaling of Geostatistical Reservoir Models Using Streamline Simulation: A Field Case Study. SPE Res Eval & Eng 8(1):22-32. SPE-81497-PA. doi:10.2118/81497-PA.
-
-
-
-
14
-
-
77149147984
-
-
Justice, J. H., Woerpel, J. C., Watts, G. P., and Waddell, W. 2000. Geostatistical Reservoir Characterization Using Interwell Seismic Data. Paper SPE 62973 presented at the SPE Annual Technical Conference and Exhibition, Dallas, 1-4 October. doi:10.2118/62973-MS.
-
Justice, J. H., Woerpel, J. C., Watts, G. P., and Waddell, W. 2000. Geostatistical Reservoir Characterization Using Interwell Seismic Data. Paper SPE 62973 presented at the SPE Annual Technical Conference and Exhibition, Dallas, 1-4 October. doi:10.2118/62973-MS.
-
-
-
-
15
-
-
0023313309
-
-
Seba, R. D. 1987. Determining Project Profitability. J. Pet Tech 39(3):263-271. SPE-16449-PA. doi:10.2118/16449-PA.
-
Seba, R. D. 1987. Determining Project Profitability. J. Pet Tech 39(3):263-271. SPE-16449-PA. doi:10.2118/16449-PA.
-
-
-
-
16
-
-
0029359757
-
-
Fujii, H. and Horne, R. 1995. Multivariate Optimization of Networked Production Systems. SPE Prod & Fac 10(3):165-171. SPE-27617-PA. doi:10.2118/27617-PA.
-
Fujii, H. and Horne, R. 1995. Multivariate Optimization of Networked Production Systems. SPE Prod & Fac 10(3):165-171. SPE-27617-PA. doi:10.2118/27617-PA.
-
-
-
-
17
-
-
77149131132
-
Real-time Reservoir Geological Model Updating Using the Hybrid EnKF and Geostatistical Technique
-
Paper CIPC 2008-128 presented at the, Calgary, 17-19 June. doi:10.2118/2008-128-EA
-
Li, H., Chen, S., and Yang, D. 2008. Real-time Reservoir Geological Model Updating Using the Hybrid EnKF and Geostatistical Technique. Paper CIPC 2008-128 presented at the Canadian International Petroleum Conference, Calgary, 17-19 June. doi:10.2118/2008-128-EA.
-
(2008)
Canadian International Petroleum Conference
-
-
Li, H.1
Chen, S.2
Yang, D.3
-
18
-
-
0034978702
-
Integration of production data into reservoir models
-
1 May
-
Oliver, D. S., Reynolds, A. C., Bi, Z., and Abacioglu, Y. 2001. Integration of production data into reservoir models. Petroleum Geoscience 7 (Supplement, 1 May) 65-73.
-
(2001)
Petroleum Geoscience
, vol.7
, Issue.SUPPL.EMENT
, pp. 65-73
-
-
Oliver, D.S.1
Reynolds, A.C.2
Bi, Z.3
Abacioglu, Y.4
|