메뉴 건너뛰기




Volumn 3172 LNCS, Issue , 2004, Pages 49-60

An ant colony optimisation algorithm for the set packing problem

Author keywords

[No Author keywords available]

Indexed keywords

SWARM INTELLIGENCE; ALGORITHMS; ANT COLONY OPTIMIZATION; ARTIFICIAL INTELLIGENCE;

EID: 77049087829     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/978-3-540-28646-2_5     Document Type: Conference Paper
Times cited : (38)

References (18)
  • 3
    • 0242555878 scopus 로고    scopus 로고
    • X. Delorme, J. Rodriguez, and X. Gandibleux. Heuristics for railway infrastructure saturation. In L. Baresi, J-J. Lévy, R. Mayr, M. Pezzè, G. Taentzer, and C. Zaroliagis, editors, ICALP 2001, 50 of Electronic Notes in Theoretical Computer Science (URL: http://www.elsevier. nl/locate/entcs/volume50.html), pages 41-55. Elsevier Science, 2001.
    • X. Delorme, J. Rodriguez, and X. Gandibleux. Heuristics for railway infrastructure saturation. In L. Baresi, J-J. Lévy, R. Mayr, M. Pezzè, G. Taentzer, and C. Zaroliagis, editors, ICALP 2001, volume 50 of Electronic Notes in Theoretical Computer Science (URL: http://www.elsevier. nl/locate/entcs/volume50.html), pages 41-55. Elsevier Science, 2001.
  • 4
    • 0033084695 scopus 로고    scopus 로고
    • Ant algorithms for discrete optimization
    • M. Dorigo, G. Di Caro, and L.M. Gambardella. Ant algorithms for discrete optimization. Artificial Life, 5(3):137-172, 1999.
    • (1999) Artificial Life , vol.5 , Issue.3 , pp. 137-172
    • Dorigo, M.1    Di Caro, G.2    Gambardella, L.M.3
  • 7
    • 0031335119 scopus 로고    scopus 로고
    • An optimization-based decision support system for ship scheduling
    • S.-H. Kim and K.-K. Lee. An optimization-based decision support system for ship scheduling. Computers and Industrial Engineering, 33:689-692, 1997.
    • (1997) Computers and Industrial Engineering , vol.33 , pp. 689-692
    • Kim, S.-H.1    Lee, K.-K.2
  • 8
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for the project scheduling with ressource constraints based on a new mathematical formulation
    • mai
    • A. Mingozzi, V. Maniezzo, S. Ricciardelli, and L. Bianco. An exact algorithm for the project scheduling with ressource constraints based on a new mathematical formulation. Management Science, 44(5):714-729, mai 1998.
    • (1998) Management Science , vol.44 , Issue.5 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 12
    • 34250429350 scopus 로고
    • On the facial structure of set packing polyhedra
    • M.W. Padberg. On the facial structure of set packing polyhedra. Mathematical Programming, 5:199-215, 1973.
    • (1973) Mathematical Programming , vol.5 , pp. 199-215
    • Padberg, M.W.1
  • 13
    • 0043167200 scopus 로고
    • A method for the cutting stock problem with different qualities
    • M. R̈onnqvist. A method for the cutting stock problem with different qualities. European Journal of Operational Research, 83:57-68, 1995.
    • (1995) European Journal of Operational Research , vol.83 , pp. 57-68
    • R̈onnqvist, M.1
  • 14
    • 0035372286 scopus 로고    scopus 로고
    • A set packing model for the ground holding problem in congested networks
    • F. Rossi and S. Smriglio. A set packing model for the ground holding problem in congested networks. European Journal of Operational Research, 131:400-416, 2001.
    • (2001) European Journal of Operational Research , vol.131 , pp. 400-416
    • Rossi, F.1    Smriglio, S.2
  • 15
    • 0001467784 scopus 로고    scopus 로고
    • An ant approach for the flow shop problem
    • Aachen Germany
    • T. Stützle. An ant approach for the flow shop problem. In Proceedings of EUFIT'98, Aachen (Germany), pages 1560-1564, 1998.
    • (1998) Proceedings of EUFIT'98 , pp. 1560-1564
    • Stützle, T.1
  • 17
    • 0037120688 scopus 로고    scopus 로고
    • An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem
    • V. T'kindt, N. Monmarché, F. Tercinet, and D. Laugt. An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem. European Journal of Operational Research, 142(2):250-257, 2002.
    • (2002) European Journal of Operational Research , vol.142 , Issue.2 , pp. 250-257
    • T'kindt, V.1    Monmarché, N.2    Tercinet, F.3    Laugt, D.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.