-
1
-
-
0029547482
-
Effort estimation using analogy
-
Berlin, Germany, Mar
-
M. Shepperd, C. Schofield, and B. Kitchenham, "Effort estimation using analogy," in Proceedings of IEEE International Conference on Software Engineering, Berlin, Germany, Mar. 1996, pp. 170-178.
-
(1996)
Proceedings of IEEE International Conference on Software Engineering
, pp. 170-178
-
-
Shepperd, M.1
Schofield, C.2
Kitchenham, B.3
-
2
-
-
0037950133
-
A comparative study of cost estimation models for web hypermedia applications
-
Jun
-
E. Mendes, I. Watson, C. Triggs, N. Mosley, and S. Counsell, "A comparative study of cost estimation models for web hypermedia applications," Empirical Software Engineering, vol. 8, no. 2, pp. 163-196, Jun. 2003.
-
(2003)
Empirical Software Engineering
, vol.8
, Issue.2
, pp. 163-196
-
-
Mendes, E.1
Watson, I.2
Triggs, C.3
Mosley, N.4
Counsell, S.5
-
3
-
-
0000356302
-
Examining the feasibility of a case-based reasoning model for software effort estimation
-
Jun
-
T. Mukhopadhyay, S. S. Vicinanza, and M. J. Prietula, "Examining the feasibility of a case-based reasoning model for software effort estimation," MIS Quarterly, vol. 16, no. 2, pp. 155-171, Jun. 1992.
-
(1992)
MIS Quarterly
, vol.16
, Issue.2
, pp. 155-171
-
-
Mukhopadhyay, T.1
Vicinanza, S.S.2
Prietula, M.J.3
-
4
-
-
0031268094
-
Estimating software project effort using analogies
-
Nov
-
M. Shepperd and C. Schofield, "Estimating software project effort using analogies," IEEE Transactions on Software Engineering, vol. 23, no. 11, pp. 736-743, Nov. 1997.
-
(1997)
IEEE Transactions on Software Engineering
, vol.23
, Issue.11
, pp. 736-743
-
-
Shepperd, M.1
Schofield, C.2
-
5
-
-
33846691171
-
A flexible method for software effort estimation by analogy
-
Feb
-
J. Li, G. Ruhe, A. Al-Emran, and M. M. Richter, "A flexible method for software effort estimation by analogy," Empirical Software Engineering, vol. 12, no. 1, pp. 65-106, Feb. 2007.
-
(2007)
Empirical Software Engineering
, vol.12
, Issue.1
, pp. 65-106
-
-
Li, J.1
Ruhe, G.2
Al-Emran, A.3
Richter, M.M.4
-
6
-
-
37649001168
-
+
-
Feb
-
+," Empirical Software Engineering, vol. 13, no. 1, pp. 63-96, Feb. 2008.
-
(2008)
Empirical Software Engineering
, vol.13
, Issue.1
, pp. 63-96
-
-
Li, J.1
Ruhe, G.2
-
7
-
-
49349110547
-
Analogy-X: Providing statistical inference to analogy-based software cost estimation
-
July-Aug
-
J. W. Keung, B. A. Kitchenham, and D. R. Jeffery, "Analogy-X: Providing statistical inference to analogy-based software cost estimation," IEEE Transactions on Software Engineering, vol. 34, no. 4, pp. 471-484, July-Aug. 2008.
-
(2008)
IEEE Transactions on Software Engineering
, vol.34
, Issue.4
, pp. 471-484
-
-
Keung, J.W.1
Kitchenham, B.A.2
Jeffery, D.R.3
-
8
-
-
58749087373
-
A study of project selection and feature weighting for analogy based software cost estimation
-
Feb
-
Y. F. Li, M. Xie, and T. N. Goh, "A study of project selection and feature weighting for analogy based software cost estimation," Journal of Systems and Software, vol. 82, no. 2, pp. 241-252, Feb. 2009.
-
(2009)
Journal of Systems and Software
, vol.82
, Issue.2
, pp. 241-252
-
-
Li, Y.F.1
Xie, M.2
Goh, T.N.3
-
9
-
-
58749103850
-
A study of mutual information based feature selection for case based reasoning in software cost estimation
-
Apr
-
-, "A study of mutual information based feature selection for case based reasoning in software cost estimation," Expert Systems with Applications, vol. 36, no. 3, pp. 5921-5931, Apr. 2009.
-
(2009)
Expert Systems with Applications
, vol.36
, Issue.3
, pp. 5921-5931
-
-
Li, Y.F.1
Xie, M.2
Goh, T.N.3
-
10
-
-
33644660383
-
Optimal project feature weights in analogy-based cost estimation: Improvement and limitations
-
Feb
-
M. Auer, A. Trendowicz, B. Graser, E. Haunschmid, and S. Biffl, "Optimal project feature weights in analogy-based cost estimation: Improvement and limitations," IEEE Transactions on Software Engineering, vol. 32, no. 2, pp. 83-92, Feb. 2006.
-
(2006)
IEEE Transactions on Software Engineering
, vol.32
, Issue.2
, pp. 83-92
-
-
Auer, M.1
Trendowicz, A.2
Graser, B.3
Haunschmid, E.4
Biffl, S.5
-
11
-
-
67349180983
-
-
A. Tosun, B. Turhan, and A. B. Bener, Feature weighting heuristics for analogy-based effort estimation models, Expert Systems with Applications, 36, no. 7, pp. 10 325-10 333, Sep. 2009.
-
A. Tosun, B. Turhan, and A. B. Bener, "Feature weighting heuristics for analogy-based effort estimation models," Expert Systems with Applications, vol. 36, no. 7, pp. 10 325-10 333, Sep. 2009.
-
-
-
-
14
-
-
0003448337
-
Analyse statistique de la productivitie des projets informatique a partie de la technique des point des fonction,
-
Master's thesis, University of Montreal
-
J. M. Desharnais, "Analyse statistique de la productivitie des projets informatique a partie de la technique des point des fonction," Master's thesis, University of Montreal, 1989.
-
(1989)
-
-
Desharnais, J.M.1
-
15
-
-
85050854798
-
A meta-model for software development resource expenditures
-
San Diego, California
-
J. W. Bailey and V. R. Basili, "A meta-model for software development resource expenditures," in Proceedings of IEEE International Conference on Software Engineering, San Diego, California, 1981, pp. 107-116.
-
(1981)
Proceedings of IEEE International Conference on Software Engineering
, pp. 107-116
-
-
Bailey, J.W.1
Basili, V.R.2
-
16
-
-
0036605452
-
Estimating maintenance effort by analogy
-
Jun
-
H. K. N. Leung, "Estimating maintenance effort by analogy," Empirical Software Engineering, vol. 7, no. 2, pp. 157-175, Jun. 2002.
-
(2002)
Empirical Software Engineering
, vol.7
, Issue.2
, pp. 157-175
-
-
Leung, H.K.N.1
|