-
4
-
-
76249088949
-
-
Millstone 2: Automatic reactor scram after a steam generator feed pump trip. Plant Event # 336-040315-1, Institute of Nuclear Power Operations, March 15 (2004)
-
Millstone 2: Automatic reactor scram after a steam generator feed pump trip. Plant Event # 336-040315-1, Institute of Nuclear Power Operations, March 15 (2004)
-
-
-
-
5
-
-
36749097361
-
Human-Automation Interaction
-
Human Factors and Ergonomics Society
-
Sheridan, T.B., Parasuraman, R.: Human-Automation Interaction. In: Reviews of Human Factors and Ergonomics, vol. 1, pp. 89-129. Human Factors and Ergonomics Society (2005)
-
(2005)
Reviews of Human Factors and Ergonomics
, vol.1
, pp. 89-129
-
-
Sheridan, T.B.1
Parasuraman, R.2
-
6
-
-
76249119602
-
-
Monticello: Half scram due to cold water transient during valve operation at Monticello Nuclear Generating Plant. Plant Event # 263-070314-1, Institute of Nuclear Power Operations, March 14 (2007)
-
Monticello: Half scram due to cold water transient during valve operation at Monticello Nuclear Generating Plant. Plant Event # 263-070314-1, Institute of Nuclear Power Operations, March 14 (2007)
-
-
-
-
7
-
-
76249095773
-
-
Darlington 2: Unit 2 turbine leading (normal) mode inadvertently entered. Plant Event # 932-041101-1, Institute of Nuclear Power Operations, Feburary 8 (2005)
-
Darlington 2: Unit 2 turbine leading (normal) mode inadvertently entered. Plant Event # 932-041101-1, Institute of Nuclear Power Operations, Feburary 8 (2005)
-
-
-
-
8
-
-
76249107044
-
-
Gentilly 2: Recirculated service water diesel motor pump 7131-P36 damaged. Plant Event # 851-001126-1, Institute of Nuclear Power Operations, November 26 (2000)
-
Gentilly 2: Recirculated service water diesel motor pump 7131-P36 damaged. Plant Event # 851-001126-1, Institute of Nuclear Power Operations, November 26 (2000)
-
-
-
-
9
-
-
76249106775
-
-
Cernavoda 1: Inadvertent draining of in-service fire water tank 7140-TK1 results in start and damage of the diesel engine driven pump. Plant Event # 121-030612-1, Institute of Nuclear Power Operations, June 12 (2003)
-
Cernavoda 1: Inadvertent draining of in-service fire water tank 7140-TK1 results in start and damage of the diesel engine driven pump. Plant Event # 121-030612-1, Institute of Nuclear Power Operations, June 12 (2003)
-
-
-
-
10
-
-
76249090635
-
-
Cooper 1: Unintended increase in reactor power due to misoperation of reactor recirculation pump speed control. Plant Event # 298-020212-1, Institute of Nuclear Power Operations, Feburary 12 (2002)
-
Cooper 1: Unintended increase in reactor power due to misoperation of reactor recirculation pump speed control. Plant Event # 298-020212-1, Institute of Nuclear Power Operations, Feburary 12 (2002)
-
-
-
-
11
-
-
76249109002
-
-
Trillo 1: During routine tests, start-up of emergency diesel generator GY60 activated by reactor protection system. Plant Event # 715-071128-1, Institute of Nuclear Power Operations, November 28 (2007)
-
Trillo 1: During routine tests, start-up of emergency diesel generator GY60 activated by reactor protection system. Plant Event # 715-071128-1, Institute of Nuclear Power Operations, November 28 (2007)
-
-
-
-
12
-
-
4544328028
-
Assessment of Human-Machine Interface Design for a Chinese Nuclear Power Plant
-
Elsevier Science S.A, Amsterdam
-
Xiaoming, C., Zhiwei, Z., Zuying, G., Wei, W., Nakagawa, T., Matsuo, S.: Assessment of Human-Machine Interface Design for a Chinese Nuclear Power Plant. In: Reliability Engineering and System Safety, vol. 87, pp. 37-44. Elsevier Science S.A, Amsterdam (2005)
-
(2005)
Reliability Engineering and System Safety
, vol.87
, pp. 37-44
-
-
Xiaoming, C.1
Zhiwei, Z.2
Zuying, G.3
Wei, W.4
Nakagawa, T.5
Matsuo, S.6
-
13
-
-
76249112454
-
-
Nine Mile Point 1: Two control rods scrammed during rod scram timing test. Plant Event # 220-040504-1, Institute of Nuclear Power Operations, May 4 (2004)
-
Nine Mile Point 1: Two control rods scrammed during rod scram timing test. Plant Event # 220-040504-1, Institute of Nuclear Power Operations, May 4 (2004)
-
-
-
-
15
-
-
76249125516
-
-
Perry 1: Reactor operation in unanalyzed region. Plant Event # 440-060709-1, Institute of Nuclear Power Operations, July 9 (2006)
-
Perry 1: Reactor operation in unanalyzed region. Plant Event # 440-060709-1, Institute of Nuclear Power Operations, July 9 (2006)
-
-
-
-
16
-
-
76249118519
-
-
Point Lepreau 1: Containment isolation system button-up during degassing of the degasser condenser. Plant Event # 908-990426-1, Institute of Nuclear Power Operations, April 26 (1999)
-
Point Lepreau 1: Containment isolation system button-up during degassing of the degasser condenser. Plant Event # 908-990426-1, Institute of Nuclear Power Operations, April 26 (1999)
-
-
-
-
17
-
-
33750371219
-
An Intelligent Human-Machine System Based on an Ecological Interface Design
-
Elsevier Science S.A, Amsterdam
-
Naito, N., Itoh, J., Monta, K., Makino, M.: An Intelligent Human-Machine System Based on an Ecological Interface Design. In: Nuclear Engineering and Design, vol. 154, pp. 97-108. Elsevier Science S.A, Amsterdam (1995)
-
(1995)
Nuclear Engineering and Design
, vol.154
, pp. 97-108
-
-
Naito, N.1
Itoh, J.2
Monta, K.3
Makino, M.4
-
18
-
-
76249102284
-
-
Point Lepreau 1: Primary heat transport (PHT) thermal transient. Plant Event # 908-040606-1, Institute of Nuclear Power Operations, June 6 (2004)
-
Point Lepreau 1: Primary heat transport (PHT) thermal transient. Plant Event # 908-040606-1, Institute of Nuclear Power Operations, June 6 (2004)
-
-
-
-
19
-
-
76249083116
-
-
Gentilly 2: Local radiological alert due to a moderator leak in upgrading plants. Plant Event # 851-020212-1, Institute of Nuclear Power Operations, Feburary 12 (2002)
-
Gentilly 2: Local radiological alert due to a moderator leak in upgrading plants. Plant Event # 851-020212-1, Institute of Nuclear Power Operations, Feburary 12 (2002)
-
-
-
-
20
-
-
76249105169
-
-
Duane Arnold 1: High temperature in fuel pool because of procedure use problem. Plant Event # 331-000111-1, Institute of Nuclear Power Operations, January 11 (2000)
-
Duane Arnold 1: High temperature in fuel pool because of procedure use problem. Plant Event # 331-000111-1, Institute of Nuclear Power Operations, January 11 (2000)
-
-
-
-
21
-
-
76249084190
-
-
Bugey 3: Two bank rod assemblies blocked in low position. Plant Event # 783-031230-1, Institute of Nuclear Power Operations, December 30 (2003)
-
Bugey 3: Two bank rod assemblies blocked in low position. Plant Event # 783-031230-1, Institute of Nuclear Power Operations, December 30 (2003)
-
-
-
-
22
-
-
0343819906
-
A Participant-Observer Study of Ergonomics in Engineering Design: How constraints drive design process
-
Elsevier Science S.A, Amsterdam
-
Burns, C., Vicente, K.J.: A Participant-Observer Study of Ergonomics in Engineering Design: How constraints drive design process. In: Applied Ergonomics, vol. 31, pp. 73-82. Elsevier Science S.A, Amsterdam (2000)
-
(2000)
Applied Ergonomics
, vol.31
, pp. 73-82
-
-
Burns, C.1
Vicente, K.J.2
-
23
-
-
76249129458
-
-
Gentilly 2: 3481-TK2 tank draining and 3481-P1 and P2 pump cavitations. Plant Event # 851-050530-1, Institute of Nuclear Power Operations, July 12 (2005)
-
Gentilly 2: 3481-TK2 tank draining and 3481-P1 and P2 pump cavitations. Plant Event # 851-050530-1, Institute of Nuclear Power Operations, July 12 (2005)
-
-
-
-
24
-
-
76249126989
-
-
Susquehanna 2: B circulating water pump shutdown instead of B condensate pump. Plant Event # 388-050527-1, Institute of Nuclear Power Operations, May 27 (2005)
-
Susquehanna 2: B circulating water pump shutdown instead of B condensate pump. Plant Event # 388-050527-1, Institute of Nuclear Power Operations, May 27 (2005)
-
-
-
-
25
-
-
58149402993
-
Categorization of action slips
-
Norman, D.A.: Categorization of action slips. Psychological Review 88, 1-15 (1981)
-
(1981)
Psychological Review
, vol.88
, pp. 1-15
-
-
Norman, D.A.1
-
26
-
-
76249093739
-
Designing to Avoid Human Error Consequences
-
Paper Session 5
-
Chen-Wing, S.L.N., Davey, E.C.: Designing to Avoid Human Error Consequences. In: Workshop on Human Error, Safety, and System Development, Paper Session 5 (1998)
-
(1998)
Workshop on Human Error, Safety, and System Development
-
-
Chen-Wing, S.L.N.1
Davey, E.C.2
-
27
-
-
76249102024
-
-
United States Nuclear Regulatory Commission
-
United States Nuclear Regulatory Commission, http://www.nrc.gov
-
-
-
|