|
Volumn , Issue , 2009, Pages
|
Smoothing control of generated power fluctuation of WTG using gain-scheduled control
|
Author keywords
Battery energy storage system; Gain scheduled control; Pitch control; Smoothing; Wind turbine generator
|
Indexed keywords
BATTERY ENERGY STORAGE SYSTEMS;
BATTERY STORAGE;
CAPITAL COSTS;
CHARGE/DISCHARGE;
GAIN-SCHEDULED CONTROL;
HIGH NONLINEARITY;
LOW AND HIGH FREQUENCIES;
MECHANICAL STRESS;
OUTPUT POWER FLUCTUATIONS;
PITCH CONTROL;
PITCH-ANGLE CONTROL;
POWER FLUCTUATIONS;
POWER SYSTEMS;
SIMULATION RESULT;
WIND POWER GENERATORS;
WIND TURBINE GENERATORS;
WIND TURBINE SYSTEMS;
COST REDUCTION;
ENERGY STORAGE;
FLYWHEELS;
ROBUSTNESS (CONTROL SYSTEMS);
STRESSES;
TURBOGENERATORS;
WIND TURBINES;
WIND POWER;
|
EID: 76249127408
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/TD-ASIA.2009.5356948 Document Type: Conference Paper |
Times cited : (3)
|
References (9)
|