메뉴 건너뛰기




Volumn 52, Issue 11, 2009, Pages 3406-3412

Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam

Author keywords

Construction quality; Core rockfill dam; Real time monitoring; System integration

Indexed keywords

CONSTRUCTION QUALITY; CONSTRUCTION QUALITY CONTROL; DAM CONSTRUCTION; IMPLEMENTATION METHODS; INTEGRATED SOLUTIONS; KEY LINKS; REAL TIME MONITORING; REAL-TIME MONITORING SYSTEMS; ROCK-FILL DAM; SYSTEM INTEGRATION; THEORETICAL RESEARCH;

EID: 75749111375     PISSN: 10069321     EISSN: 1862281X     Source Type: Journal    
DOI: 10.1007/s11431-009-0343-6     Document Type: Article
Times cited : (79)

References (10)
  • 1
    • 75749101696 scopus 로고    scopus 로고
    • New development of China earth and stone dam project construction (in Chinese)
    • 1150.82302
    • B. L. Wang Y. Z. Liu H. H. Wu 2005 New development of China earth and stone dam project construction (in Chinese) Water Power 31 1 63 65 1150.82302
    • (2005) Water Power , vol.31 , Issue.1 , pp. 63-65
    • Wang, B.L.1    Liu, Y.Z.2    Wu, H.H.3
  • 2
    • 75749128912 scopus 로고    scopus 로고
    • The control practice of Xiaolangdi dam construction (in Chinese)
    • F. T. Yu B. Wang Z. W. Wu, et al. 2002 The control practice of Xiaolangdi dam construction (in Chinese) Water Resour Hydrop Eng 33 3 31 33
    • (2002) Water Resour Hydrop Eng , vol.33 , Issue.3 , pp. 31-33
    • Yu, F.T.1    Wang, B.2    Wu, Z.W.3
  • 3
    • 75749129724 scopus 로고    scopus 로고
    • Construction supervision of Tianshengqiao face rockfill dam (in Chinese)
    • S. P. Chen 2000 Construction supervision of Tianshengqiao face rockfill dam (in Chinese) Yangtze River 31 8 29 31
    • (2000) Yangtze River , vol.31 , Issue.8 , pp. 29-31
    • Chen, S.P.1
  • 5
    • 0033207798 scopus 로고    scopus 로고
    • Evaluation of global positioning system devices for a quality control system for compaction operations
    • 10.3141/1675-09
    • W. Do A. A. Oloufa H. R. Thomas 1999 Evaluation of global positioning system devices for a quality control system for compaction operations Transport Res Rec 1675 1 67 74 10.3141/1675-09
    • (1999) Transport Res Rec , vol.1675 , Issue.1 , pp. 67-74
    • Do, W.1    Oloufa, A.A.2    Thomas, H.R.3
  • 9
    • 25844516536 scopus 로고    scopus 로고
    • GPS real-time supervisory system and its preliminary application in the construction of face rockfill dam (in Chinese)
    • S. X. Huang J. N. Liu X. M. Wu 2005 GPS real-time supervisory system and its preliminary application in the construction of face rockfill dam (in Chinese) Ed Board Geo Inform Sci Wuhan Univ 30 9 813 816
    • (2005) Ed Board Geo Inform Sci Wuhan Univ , vol.30 , Issue.9 , pp. 813-816
    • Huang, S.X.1    Liu, J.N.2    Wu, X.M.3
  • 10
    • 36049030905 scopus 로고    scopus 로고
    • Theory and practice of construction simulation for high rockfill dam
    • DOI 10.1007/s11431-007-6006-6
    • D. H. Zhong P. Zhang K. X. Wu 2007 Theory and practice of construction simulation for high rock-fill dam Sci China Ser E: Tech Sci 50 1 51 61 10.1007/s11431-007-6006-6 (Pubitemid 350100230)
    • (2007) Science in China, Series E: Technological Sciences , vol.50 , Issue.SUPPL. 1 , pp. 51-61
    • Zhong, D.1    Zhang, P.2    Wu, K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.