-
1
-
-
0002505095
-
An analytical determination of lead time with normal demand
-
Liao C.J., and Shyu C.H. An analytical determination of lead time with normal demand. Int. J. Ope. Prod. Manage. 11 (1991) 72-78
-
(1991)
Int. J. Ope. Prod. Manage.
, vol.11
, pp. 72-78
-
-
Liao, C.J.1
Shyu, C.H.2
-
2
-
-
0028439401
-
Inventory models involving lead time as decision variable
-
Ben-Daya M., and Raouf A. Inventory models involving lead time as decision variable. J. Ope. Res. Soc. 45 (1994) 579-582
-
(1994)
J. Ope. Res. Soc.
, vol.45
, pp. 579-582
-
-
Ben-Daya, M.1
Raouf, A.2
-
3
-
-
0032156988
-
A minimax distribution free procedure for mixed inventory model with variable lead time
-
Ouyang L.Y., and Wu K.S. A minimax distribution free procedure for mixed inventory model with variable lead time. Int. J. Prod. Econ. 56 (1998) 511-516
-
(1998)
Int. J. Prod. Econ.
, vol.56
, pp. 511-516
-
-
Ouyang, L.Y.1
Wu, K.S.2
-
4
-
-
0034309379
-
A periodic review inventory model involving variable lead time with a service level constraint
-
Ouyang L.Y., and Chuang B.R. A periodic review inventory model involving variable lead time with a service level constraint. Int. J. Syst. Sci. 31 (2000) 1209-1215
-
(2000)
Int. J. Syst. Sci.
, vol.31
, pp. 1209-1215
-
-
Ouyang, L.Y.1
Chuang, B.R.2
-
5
-
-
1842671391
-
Optimal inventory policies involving variable lead time with defective items
-
Ouyang L.Y., Chuang B.R., and Wu K.S. Optimal inventory policies involving variable lead time with defective items. Opsearch 36 (1999) 374-389
-
(1999)
Opsearch
, vol.36
, pp. 374-389
-
-
Ouyang, L.Y.1
Chuang, B.R.2
Wu, K.S.3
-
6
-
-
0033285739
-
Lead time and ordering cost reductions in continuous review inventory systems with partial back orders
-
Ouyang L.Y., Chen C.K., and Chang H.C. Lead time and ordering cost reductions in continuous review inventory systems with partial back orders. J. Ope. Res. Soc. 50 (1999) 1272-1279
-
(1999)
J. Ope. Res. Soc.
, vol.50
, pp. 1272-1279
-
-
Ouyang, L.Y.1
Chen, C.K.2
Chang, H.C.3
-
7
-
-
0030733394
-
The distribution free job control problem
-
Moon I., and Yun W. The distribution free job control problem. Comput. Ind. Eng. 32 (1997) 109-113
-
(1997)
Comput. Ind. Eng.
, vol.32
, pp. 109-113
-
-
Moon, I.1
Yun, W.2
-
8
-
-
0000752798
-
Investing in reduced setups in the EOQ model
-
Porteus E.L. Investing in reduced setups in the EOQ model. Manage. Sci. 31 (1985) 998-1010
-
(1985)
Manage. Sci.
, vol.31
, pp. 998-1010
-
-
Porteus, E.L.1
-
9
-
-
84985822213
-
The classic economic production quantity model with setup cost as a function of capital expenditure
-
Billington P. The classic economic production quantity model with setup cost as a function of capital expenditure. Decision Sci. 18 (1987) 25-42
-
(1987)
Decision Sci.
, vol.18
, pp. 25-42
-
-
Billington, P.1
-
10
-
-
0025258126
-
Setup cost reduction inventory model with finite range stochastic lead times
-
Nasri F., Affiso J.F., and Paknejad M.J. Setup cost reduction inventory model with finite range stochastic lead times. Int. J. Prod. Res. 28 (1990) 199-212
-
(1990)
Int. J. Prod. Res.
, vol.28
, pp. 199-212
-
-
Nasri, F.1
Affiso, J.F.2
Paknejad, M.J.3
-
11
-
-
84985788519
-
Setup reduction in economic production quantity model
-
Kim K.L., and Haya J.C. Setup reduction in economic production quantity model. Decision Sci. 23 (1992) 500-508
-
(1992)
Decision Sci.
, vol.23
, pp. 500-508
-
-
Kim, K.L.1
Haya, J.C.2
-
12
-
-
0004102424
-
-
Dow Jones Irwin, Homewood, Illinois
-
Hall R.W. Zero Inventories (1983), Dow Jones Irwin, Homewood, Illinois
-
(1983)
Zero Inventories
-
-
Hall, R.W.1
-
13
-
-
0000341101
-
Defective units in a continuous review (s,Q) system
-
Paknejad M.J., Nasri F., and Affiso J.F. Defective units in a continuous review (s,Q) system. Int. J. Prod. Res. 33 (1995) 2767-2777
-
(1995)
Int. J. Prod. Res.
, vol.33
, pp. 2767-2777
-
-
Paknejad, M.J.1
Nasri, F.2
Affiso, J.F.3
-
14
-
-
0031145351
-
Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
-
Sarker B.R., and Coates E.R. Manufacturing setup cost reduction under variable lead times and finite opportunities for investment. Int. J. Prod. Econ. 49 (1997) 237-247
-
(1997)
Int. J. Prod. Econ.
, vol.49
, pp. 237-247
-
-
Sarker, B.R.1
Coates, E.R.2
-
15
-
-
0035247926
-
(Q, r, L) Inventory model with defective items
-
Wu K.-S., and Ouyang L.-Y. (Q, r, L) Inventory model with defective items. Comput. Ind. Eng. 39 (2001) 173-185
-
(2001)
Comput. Ind. Eng.
, vol.39
, pp. 173-185
-
-
Wu, K.-S.1
Ouyang, L.-Y.2
-
16
-
-
1842671391
-
Optimal inventory policies involving variable lead time with defective items
-
Ouyang L.Y., Chuang B.R., and Wu K.S. Optimal inventory policies involving variable lead time with defective items. J. Ope. Res. Soc. 36 (1994) 374-389
-
(1994)
J. Ope. Res. Soc.
, vol.36
, pp. 374-389
-
-
Ouyang, L.Y.1
Chuang, B.R.2
Wu, K.S.3
-
17
-
-
75449120374
-
EOQ under inspection costs, production and inventory management
-
Schwaller R.L. EOQ under inspection costs, production and inventory management. J. Third Quarter (1998) 22-24
-
(1998)
J. Third Quarter
, pp. 22-24
-
-
Schwaller, R.L.1
-
19
-
-
0027642234
-
The distribution free Newsboy problem, Review and extentions
-
Gallego G., and Moon I. The distribution free Newsboy problem, Review and extentions. J. Ope. Res. Soc. 44 (1993) 825-834
-
(1993)
J. Ope. Res. Soc.
, vol.44
, pp. 825-834
-
-
Gallego, G.1
Moon, I.2
|