Strategic analysis framework for evaluating distributed generation and utility strategies
-
July
-
G. W. Ault, J. R. McDonald, and G. M. Burt, "Strategic analysis framework for evaluating distributed generation and utility strategies," IEE Proc.-Gener. Transm. Distrib., vol. 150, pp. 475-481, July 2003.
-
(2003)
IEE Proc.-Gener. Transm. Distrib.
, vol.150
, pp. 475-481
-
-
Ault, G.W.1
Mcdonald, J.R.2
Burt, G.M.3
-
2
-
-
4043160511
-
Optimal investment planning for distributed generation in a competitive electricity market
-
Aug.
-
W. El-Khattam, K. Bhattacharya, Y. Hegazy, and M. M. A. Salama, "Optimal investment planning for distributed generation in a competitive electricity market," IEEE Trans. Power Syst., vol. 19, pp. 1674-1684, Aug. 2004.
-
(2004)
IEEE Trans. Power Syst.
, vol.19
, pp. 1674-1684
-
-
El-Khattam, W.1
Bhattacharya, K.2
Hegazy, Y.3
Salama, M.M.A.4
-
3
-
-
8744242810
-
Financial and economic evaluation of projects in the electricity supply industry
-
H. Khatib, Financial and economic evaluation of projects in the electricity supply industry. Bath: IEE Power Series, 23, 1997.
-
(1997)
Bath: IEE Power Series
, vol.23
-
-
Khatib, H.1
-
6
-
-
0036508482
-
Short-term generation asset valuation: A real options approach
-
C. -L. Tseng and G. Barz, "Short-term generation asset valuation: a real options approach," Oper. Res., vol. 50, no.2, pp. 297-310, 2002.
-
(2002)
Oper. Res.
, vol.50
, Issue.2
, pp. 297-310
-
-
Tseng, C.-L.1
Barz, G.2
-
7
-
-
30544446955
-
Exercising real unit operational options under price uncertainty
-
Singapore, 23-27 Jan.
-
C. -L. Tseng, "Exercising real unit operational options under price uncertainty," in Proc. 2000 IEEE PES Winter Meeting, pp. 436-440, Singapore, 23-27 Jan. 2000.
-
(2000)
Proc. 2000 IEEE PES Winter Meeting
, pp. 436-440
-
-
Tseng, C.-L.1
-
8
-
-
0038380755
-
Incorporating operational characteristics and startup costs in option-based valuation of power generation capacity
-
S. -J. Deng and S. S. Oren, "Incorporating operational characteristics and startup costs in option-based valuation of power generation capacity," Probab. Eng. Inform. Sci., vol. 17, no.2, pp. 155-182, 2003.
-
(2003)
Probab. Eng. Inform. Sci.
, vol.17
, Issue.2
, pp. 155-182
-
-
Deng, S.-J.1
Oren, S.S.2
-
9
-
-
34247512655
-
A framework using two-factor price lattices for generation asset valuation
-
C. -L. Tseng, and K. Y. Lin, "A framework using two-factor price lattices for generation asset valuation," Oper. Res., vol. 55, no.2, pp. 234-251, 2007.
-
(2007)
Oper. Res.
, vol.55
, Issue.2
, pp. 234-251
-
-
Tseng, C.-L.1
Lin, K.Y.2
-
10
-
-
37249041609
-
Power plant multistage investment under market uncertainty
-
P. F. Correia, P. M. S. Carvalho, L. A. F. M. Ferreira, J. Guedes, and J. Sousa, "Power plant multistage investment under market uncertainty," IET -Gener. Transm. Distrib., vol. 2, pp. 149-157, 2008.
-
(2008)
IET -Gener. Transm. Distrib.
, vol.2
, pp. 149-157
-
-
Correia, P.F.1
Carvalho, P.M.S.2
Ferreira, L.A.F.M.3
Guedes, J.4
Sousa, J.5
-
11
-
-
37249093697
-
Gas-fired power plants: Investment timing, operating flexibility and abandonment
-
Washington D.C. 10-12 July
-
S. -E. Fleten and E. Näsäkkälä, "Gas-fired power plants: Investment timing, operating flexibility and abandonment," in Proc. Seventh Annual Int. Conf. on Real Options, Washington D.C., 10-12 July 2003.
-
(2003)
Proc. Seventh Annual Int. Conf. on Real Options
-
-
Fleten, S.-E.1
Näsäkkälä, E.2
-
12
-
-
29444431746
-
Flexibility and technology choice in gas fired power plant investments
-
E. Näsäkkälä and S. -E. Fleten, "Flexibility and technology choice in gas fired power plant investments", Rev. Financ. Econ., Special Issue on Real Options, vol. 14, no.3-4, pp. 371-393, 2005.
-
(2005)
Rev. Financ. Econ., Special Issue on Real Options
, vol.14
, Issue.3-4
, pp. 371-393
-
-
Näsäkkälä, E.1
Fleten, S.-E.2
-
13
-
-
33646047398
-
Electric power generation planning for interrelated projects: A real options approach
-
C. -H. Wang and K. J. Min, "Electric power generation planning for interrelated projects: A real options approach," IEEE Trans. Eng. Manag., vol. 53, no.2, pp. 312-322, 2006.
-
(2006)
IEEE Trans. Eng. Manag.
, vol.53
, Issue.2
, pp. 312-322
-
-
Wang, C.-H.1
Min, K.J.2
-
14
-
-
33846199123
-
Optimal investment strategies in decentralized renewable power generation under uncertainty
-
S. -E. Fleten, K. M. Maribu, and I. Wangensteen, "Optimal investment strategies in decentralized renewable power generation under uncertainty," Energy, vol. 32, pp. 803-815, 2007.
-
(2007)
Energy
, vol.32
, pp. 803-815
-
-
Fleten, S.-E.1
Maribu, K.M.2
Wangensteen, I.3
-
15
-
-
0002177194
-
Numerical procedures for implementing term structure models I: Single-factor models
-
J. Hull J. and A. White, "Numerical procedures for implementing term structure models I: Single-factor models," Journal of Derivatives, vol. 2, no.1, pp. 7-16, 1994.
-
(1994)
Journal of Derivatives
, vol.2
, Issue.1
, pp. 7-16
-
-
Hull, J.J.1
White, A.2
-
16
-
-
84944829853
-
Term structure movements and pricing interest rate contingent claims
-
December
-
T. S. Y. Ho and S. B. Lee, "Term structure movements and pricing interest rate contingent claims," Journal of Finance, vol. 41, pp. 1011-1029, December 1986.
-
(1986)
Journal of Finance
, vol.41
, pp. 1011-1029
-
-
Ho, T.S.Y.1
Lee, S.B.2
-
17
-
-
74949138444
-
-
Polo Español, S.A
-
Operador del Mercado Ibérico de Energía - Polo Español, S.A., http://www.omel.es.
-
-
-
-
18
-
-
74949131048
-
-
Royal Decree 661/2007 of the 25th of May, regulating the activity of energy production in a special regime, Available at, (in Spanish)
-
Royal Decree 661/2007 of the 25th of May, regulating the activity of energy production in a special regime. Available at www.boe.es/boe/dias/2007/05/ 26/pdfs/A22846-22886.pdf (in Spanish).
-
-
-
|