메뉴 건너뛰기




Volumn , Issue , 2009, Pages

Clustering based Short Term Load Forecasting using Support Vector Machines

Author keywords

Clustering; Short term load forecasting; Support vector machines

Indexed keywords

AVERAGE TEMPERATURE; CLUSTERING; HOURLY LOAD; INPUT PATTERNS; NOVEL CLUSTERING; PROPOSED ARCHITECTURES; SHORT TERM LOAD FORECASTING; TESTING PATTERN; TRAINING PATTERNS;

EID: 74949112384     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PTC.2009.5282144     Document Type: Conference Paper
Times cited : (69)

References (47)
  • 2
    • 1842854020 scopus 로고    scopus 로고
    • Application of fuzzy neural networks and artificial intelligence for load forecasting
    • G. C. Liao, T. P. Tsao, "Application of Fuzzy Neural Networks and Artificial Intelligence for Load Forecasting", vol.70, Elsevier, Electric Power Systems Research, 2004, pp. 237-244.
    • (2004) Elsevier, Electric Power Systems Research , vol.70 , pp. 237-244
    • Liao, G.C.1    Tsao, T.P.2
  • 3
    • 0038684886 scopus 로고    scopus 로고
    • A new methodology for nodal load forecasting in deregulated power systems
    • May
    • X. Wang, N. Hatziargyriou, L. H. Tsoukalas, "A new methodology for nodal load forecasting in deregulated power systems", IEEE Power Eng. Review. May 2002, pp. 48-51.
    • (2002) IEEE Power Eng. Review , pp. 48-51
    • Wang, X.1    Hatziargyriou, N.2    Tsoukalas, L.H.3
  • 4
    • 74949123063 scopus 로고    scopus 로고
    • Implementation of fuzzy logic for short term load forecasting
    • Shimoga, India & MIT, Cambridge, USA, Dec.
    • S. Chenthur Pandian, K. Duraiswamy, A. A. Sadagopan, "Implementation of fuzzy logic for short term load forecasting", International Conference JNNCE, Shimoga, India & MIT, Cambridge, USA, Dec.2004.
    • (2004) International Conference JNNCE
    • Pandian, S.C.1    Duraiswamy, K.2    Sadagopan, A.A.3
  • 6
    • 0027544506 scopus 로고
    • Load forecasting via sub optimal seasonal auto regressive models and iteratively reweighted least squares estimation
    • G. A. N. Mbamalu and M. E. El-Hawary, "Load forecasting via sub optimal seasonal auto regressive models and iteratively reweighted least squares estimation," IEEE Trans. Power Systems, vol.8, no.1, 1993, pp. 343-348.
    • (1993) IEEE Trans. Power Systems , vol.8 , Issue.1 , pp. 343-348
    • Mbamalu, G.A.N.1    El-Hawary, M.E.2
  • 7
    • 0032205039 scopus 로고    scopus 로고
    • The impact of temperature forecast uncertainty on Bayesian load forecasting
    • Douglas, A.P. Breipohl, A.M. Lee, F.N. Adapa, R. "The impact of temperature forecast uncertainty on Bayesian load forecasting", IEEE Transactions on Power Systems, vol. 13, no.4, 1998, pp. 1507-1513.
    • (1998) IEEE Transactions on Power Systems , vol.13 , Issue.4 , pp. 1507-1513
    • Douglas, A.P.1    Breipohl, A.M.2    Lee, F.N.3    Adapa, R.4
  • 8
    • 0000273668 scopus 로고    scopus 로고
    • Short-term forecasting of industrial electricity consumption in Brazil
    • R. Sadownik and E. P. Barbosa, "Short-term forecasting of industrial electricity consumption in Brazil", J. Forecast., vol.18, 1999, pp. 215-224.
    • (1999) J. Forecast. , vol.18 , pp. 215-224
    • Sadownik, R.1    Barbosa, E.P.2
  • 9
    • 0031222649 scopus 로고    scopus 로고
    • Short-term load forecasting using threshold auto regressive models
    • S. R. Huang, "Short-term load forecasting using threshold auto regressive models", IEE Proceedings on Generation, Transmission and Distribution, vol.144, no.5, 1997, pp.477-481.
    • (1997) IEE Proceedings on Generation, Transmission and Distribution , vol.144 , Issue.5 , pp. 477-481
    • Huang, S.R.1
  • 10
    • 0032141864 scopus 로고    scopus 로고
    • Optimal smoothing for trend removal in short term electricity demand forecasting
    • D. G. Infield and D. C. Hill, "Optimal smoothing for trend removal in Short term electricity demand forecasting", IEEE Transactions on Power Systems, vol. 13, no.3, 1998, pp.1115-1120.
    • (1998) IEEE Transactions on Power Systems , vol.13 , Issue.3 , pp. 1115-1120
    • Infield, D.G.1    Hill, D.C.2
  • 11
    • 0026154960 scopus 로고
    • Composite modeling for adaptive short-term load forecasting
    • J. H. Park, Y. M. Park and K. Y. Lee, "Composite modeling for adaptive short-term load forecasting", IEEE Transactions on Power Systems, vol.6, no.2, 1991, pp.450-457.
    • (1991) IEEE Transactions on Power Systems , vol.6 , Issue.2 , pp. 450-457
    • Park, J.H.1    Park, Y.M.2    Lee, K.Y.3
  • 13
    • 0023399522 scopus 로고
    • The time series approach to short term load forecasting
    • M. T. Hagan and S. M. Behr, "The time series approach to short term load forecasting", IEEE Transactions on Power Systems, vol. PWRS-2, no.3, 1987, pp. 785-791.
    • (1987) IEEE Transactions on Power Systems , vol.PWRS-2 , Issue.3 , pp. 785-791
    • Hagan, M.T.1    Behr, S.M.2
  • 14
    • 0003724776 scopus 로고
    • Practical experiences with modeling and forecast
    • G. M. Jenkins, "Practical experiences with modeling and forecast", Time Series, 1979.
    • (1979) Time Series
    • Jenkins, G.M.1
  • 15
    • 0031996523 scopus 로고    scopus 로고
    • A new short-term load forecasting approach using self-organizing fuzzy ARMAX models
    • H. T. Yang and C. M. Huang, "A new short-term load forecasting approach using self-organizing fuzzy ARMAX models", IEEE Transactions on Power Systems, vol.13, no.1, 1998, pp.217-225.
    • (1998) IEEE Transactions on Power Systems , vol.13 , Issue.1 , pp. 217-225
    • Yang, H.T.1    Huang, C.M.2
  • 16
    • 0030087191 scopus 로고    scopus 로고
    • Identification of ARMAX model for short term load forecasting: An evolutionary programming approach
    • H. T. Yang, C. M. Huang and C. L. Huang, "Identification of ARMAX model for short term load forecasting: An evolutionary programming approach", IEEE Transactions on Power Systems, vol.11, no.1, 1996, pp.403-408.
    • (1996) IEEE Transactions on Power Systems , vol.11 , Issue.1 , pp. 403-408
    • Yang, H.T.1    Huang, C.M.2    Huang, C.L.3
  • 17
    • 0030146914 scopus 로고    scopus 로고
    • A temperature match based optimization method for daily load prediction considering DLC effect
    • Z. Yu, "A temperature match based optimization method for daily load prediction considering DLC effect", IEEE Transactions on Power Systems, vol.11, no.2, 1996, pp.728-733.
    • (1996) IEEE Transactions on Power Systems , vol.11 , Issue.2 , pp. 728-733
    • Yu, Z.1
  • 19
    • 21344477644 scopus 로고
    • Forecasting hourly electricity demand using time-varying splines
    • A. Harvey and S. J. Koopman, "Forecasting hourly electricity demand using time-varying splines", Journal of American Statistics Assoc., vol.88, no.424, 1993, pp.1228-1236.
    • (1993) Journal of American Statistics Assoc. , vol.88 , Issue.424 , pp. 1228-1236
    • Harvey, A.1    Koopman, S.J.2
  • 20
    • 0343090870 scopus 로고    scopus 로고
    • Using combined forecast switch changing weights for electricity demand profiling
    • J. W. Taylor and S. Majithia, "Using combined forecast switch changing weights for electricity demand profiling", Journal Operations Research Society, vol.51, no.1, 2000, pp.72-82.
    • (2000) Journal Operations Research Society , vol.51 , Issue.1 , pp. 72-82
    • Taylor, J.W.1    Majithia, S.2
  • 21
    • 84979434249 scopus 로고
    • Modeling peak electricity demand
    • R. F. Engle, C. Mustafa and J. Rice, "Modeling peak electricity demand", Journal Forecast., vol.11, 1992, pp.241-251.
    • (1992) Journal Forecast. , vol.11 , pp. 241-251
    • Engle, R.F.1    Mustafa, C.2    Rice, J.3
  • 22
    • 0028546825 scopus 로고
    • Regression based peak load forecasting using a transformation technique
    • T. Haida and S. Muto, "Regression based peak load forecasting using a transformation technique", IEEE Transactions Power Systems, vol.9, no.4, 1994, pp.1788-1794.
    • (1994) IEEE Transactions Power Systems , vol.9 , Issue.4 , pp. 1788-1794
    • Haida, T.1    Muto, S.2
  • 23
    • 0025519319 scopus 로고
    • A regression based approach to short-term system load forecasting
    • A. D. Papalexopoulos and T. C. Hesterberg, "A regression based approach to short-term system load forecasting", IEEE Transactions Power Systems, vol.5, no.4, 1990, pp.1535-1547.
    • (1990) IEEE Transactions Power Systems , vol.5 , Issue.4 , pp. 1535-1547
    • Papalexopoulos, A.D.1    Hesterberg, T.C.2
  • 25
    • 0000320366 scopus 로고    scopus 로고
    • Application of least absolute value parameter estimation based on linear programming to short-term load forecasting
    • S. A. Soliman, S. Persaud, K. El-Nagar and M. E. El-Hawary, "Application of least absolute value parameter estimation based on linear programming to short-term load forecasting", Electrical Power & Energy Systems, vol.19, no.3, 1997, pp.209-216.
    • (1997) Electrical Power & Energy Systems , vol.19 , Issue.3 , pp. 209-216
    • Soliman, S.A.1    Persaud, S.2    El-Nagar, K.3    El-Hawary, M.E.4
  • 27
    • 0028424925 scopus 로고
    • A real-time implementation of short-term load forecasting for distribution power systems
    • J. Y. Fan and J. D. Mc Donald, "A real-time implementation of short- term load forecasting for distribution power systems", IEEE Transactions Power Systems, vol. 9, no. 2, 1994, pp.988-994.
    • (1994) IEEE Transactions Power Systems , vol.9 , Issue.2 , pp. 988-994
    • Fan, J.Y.1    Mc Donald, J.D.2
  • 28
    • 0031078358 scopus 로고    scopus 로고
    • An adaptable automated procedure for short-term electricity load forecasting
    • O. Hyde and P. F. Hodnett, "An adaptable automated procedure for short-term electricity load forecasting", IEEE Transactions Power Systems, vol. 12, no. 1, 1997, pp. 84-93.
    • (1997) IEEE Transactions Power Systems , vol.12 , Issue.1 , pp. 84-93
    • Hyde, O.1    Hodnett, P.F.2
  • 29
    • 0026154960 scopus 로고
    • Composite modeling for adaptive short-term load forecasting
    • J. H. Park, Y. M. Park, and K. Y. Lee, "Composite modeling for adaptive short-term load forecasting", IEEE Transactions on Power Systems, vol.6, no.2, 1991, pp. 450-457.
    • (1991) IEEE Transactions on Power Systems , vol.6 , Issue.2 , pp. 450-457
    • Park, J.H.1    Park, Y.M.2    Lee, K.Y.3
  • 30
    • 0025519350 scopus 로고
    • Short term load forecasting of Taiwan power system using a knowledge-based expert system
    • K. L. Ho, Y. Y. Hsu, C. F. Chen, T. E. Lee, C. C. Liang, T. S. Lai and K. K. Chen, "Short term load forecasting of Taiwan power system using a knowledge-based expert system", IEEE Transactions Power Systems, vol.5, no.4, 1990, pp.1214-1221.
    • (1990) IEEE Transactions Power Systems , vol.5 , Issue.4 , pp. 1214-1221
    • Ho, K.L.1    Hsu, Y.Y.2    Chen, C.F.3    Lee, T.E.4    Liang, C.C.5    Lai, T.S.6    Chen, K.K.7
  • 31
    • 0027590291 scopus 로고
    • A generalized knowledge-based short-term load-forecasting technique
    • S. Rahman and O. Hazim, "A generalized knowledge-based short-term load-forecasting technique", IEEE Transactions Power Systems, vol.8, no.2, 1993, pp.508-514.
    • (1993) IEEE Transactions Power Systems , vol.8 , Issue.2 , pp. 508-514
    • Rahman, S.1    Hazim, O.2
  • 32
    • 0024764917 scopus 로고
    • Analysis and evaluation of five short-term load forecasting techniques
    • October
    • I. Moghram and S. Rahman, "Analysis and evaluation of five short-term load forecasting techniques", IEEE Transactions on Power Systems, Vol. 4, No. 4, October 1989, pp.1484-1491.
    • (1989) IEEE Transactions on Power Systems , vol.4 , Issue.4 , pp. 1484-1491
    • Moghram, I.1    Rahman, S.2
  • 33
    • 0030084673 scopus 로고    scopus 로고
    • Optimal fuzzy inference for short-term load forecasting
    • H. Mori and H. Kobayashi, "Optimal fuzzy inference for short-term load forecasting", IEEE Trans. Power Systems, vol.11, no.1, 1996, pp.390-396.
    • (1996) IEEE Trans. Power Systems , vol.11 , Issue.1 , pp. 390-396
    • Mori, H.1    Kobayashi, H.2
  • 37
    • 35248833159 scopus 로고
    • Neural networks: Forecasting break through or passing fad?
    • C. Chatfield, "Neural networks: Forecasting break through or passing fad?", Int. J. Forecast, vol.9, 1993, pp.1-3.
    • (1993) Int. J. Forecast , vol.9 , pp. 1-3
    • Chatfield, C.1
  • 38
    • 0032203310 scopus 로고    scopus 로고
    • ANNSTLF- Artificial neural network short term load forecaster-generation three
    • Nov.
    • A. Khotanzad, R. A. Rohani and D. Maratukulam, "ANNSTLFArtificial neural network short term load forecaster-Generation Three", IEEE Transactions PAS, Vol. 13, No. 4, Nov. 1998, pp. 1413-1422.
    • (1998) IEEE Transactions PAS , vol.13 , Issue.4 , pp. 1413-1422
    • Khotanzad, A.1    Rohani, R.A.2    Maratukulam, D.3
  • 42
    • 0037170654 scopus 로고    scopus 로고
    • Support vector machines for short-term electrical load forecasting
    • M. Mohandes, "Support Vector Machines for Short-Term Electrical Load Forecasting", International Journal of Energy Research, vol. 26, 2002, pp. 335-345.
    • (2002) International Journal of Energy Research , vol.26 , pp. 335-345
    • Mohandes, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.