메뉴 건너뛰기




Volumn , Issue , 2009, Pages 503-515

Project delivery selection for Southern Nevada's Lake mead intake no. 3

Author keywords

[No Author keywords available]

Indexed keywords


EID: 74949089166     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (2)
  • 1
    • 84888448951 scopus 로고    scopus 로고
    • Feroz, M., Jensen, M. and Lindell, J.E., The Lake Mead Intake 3 Water Tunnel and Pumping Station, Las Vegas, NV, USA, RETC 2007, Toronto, Canada
    • Feroz, M., Jensen, M. and Lindell, J.E., The Lake Mead Intake 3 Water Tunnel and Pumping Station, Las Vegas, NV, USA, RETC 2007, Toronto, Canada
  • 2
    • 84888447557 scopus 로고    scopus 로고
    • Nevada Revised Statutes (NRS), NRS 338.1721, NRS 338.1723, NRS 338.1725, NRS 338.1727, Procedure for Qualifying Bidders, October 2005
    • Nevada Revised Statutes (NRS), NRS 338.1721, NRS 338.1723, NRS 338.1725, NRS 338.1727, Procedure for Qualifying Bidders, October 2005


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.