메뉴 건너뛰기




Volumn 37, Issue 11, 2009, Pages 50-55

Prediction of original reliability parameters of power system using optimized GM (1, 1) model

Author keywords

Fuzzy nearness; Optimized GM (1, 1) prediction; Original reliability parameter; Power system

Indexed keywords

DEVELOPMENT TRENDS; GM (1 , 1); GM (1 , 1) MODEL; INITIAL VALUES; LEAST SQUARE METHODS; ORIGINAL SERIES; POWER SYSTEMS; PREDICTION PRECISION; RELIABILITY ASSESSMENTS; RELIABILITY PARAMETERS; SMALL SAMPLES; WEIGHT COEFFICIENTS;

EID: 74849102644     PISSN: 1000565X     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (19)
  • 1
    • 74849128324 scopus 로고    scopus 로고
    • Chinese source
    • 2003.
    • (2003)
  • 2
    • 74849126316 scopus 로고    scopus 로고
    • Chinese source
    • 2008.
    • (2008)
  • 3
    • 0041529959 scopus 로고    scopus 로고
    • Reliability evaluation algorithm of electrical power systems using sensitivity analysis
    • Wu Kai-gui, Wu Zhong-fu. Reliability evaluation algorithm of electrical power systems using sensitivity analysis [J]. Automation of Electric Power Systems, 2003, 23 (4): 53-56.
    • (2003) Automation of Electric Power Systems , vol.23 , Issue.4 , pp. 53-56
    • Wu, K.-G.1    Wu, Z.-F.2
  • 4
    • 0029307426 scopus 로고
    • Sensitivity analysis of reliability indices with respect to equipment failure and repair rates
    • Melo A C G, Pereira M V F. Sensitivity analysis of reliability indices with respect to equipment failure and repair rates [J]. IEEE Transactions on Power Systems, 1995, 10 (2): 1014-1021.
    • (1995) IEEE Transactions on Power Systems , vol.10 , Issue.2 , pp. 1014-1021
    • Melo, A.C.G.1    Pereira, M.V.F.2
  • 5
    • 0034335195 scopus 로고    scopus 로고
    • The evaluation method of fuzzy reliability in electric power network planning
    • Zhang Yan. The evaluation method of fuzzy reliability in electric power network planning [J]. Proceedings of the CSEE, 2000, 20 (11): 77-80.
    • (2000) Proceedings of the CSEE , vol.20 , Issue.11 , pp. 77-80
    • Zhang, Y.1
  • 7
    • 2442680641 scopus 로고    scopus 로고
    • A novel Interval method for reliability evaluation of large scale distribution system
    • Zhang Peng, Wang Shou-xiang. A novel Interval method for reliability evaluation of large scale distribution system [J]. Automation of Electric Power Systems, 2004, 24 (3): 77-84.
    • (2004) Automation of Electric Power Systems , vol.24 , Issue.3 , pp. 77-84
    • Zhang, P.1    Wang, S.-X.2
  • 8
    • 1642308655 scopus 로고    scopus 로고
    • An interval approach to evaluate distribution system reliability with parameters uncertainty
    • Ren Zhen, Wan Guan-quan, Huang Wen-ying. An interval approach to evaluate distribution system reliability with parameters uncertainty [J]. Proceedings of the Csee, 2003, 23 (12): 68-73.
    • (2003) Proceedings of the Csee , vol.23 , Issue.12 , pp. 68-73
    • Ren, Z.1    Wan, G.-Q.2    Huang, W.-Y.3
  • 11
    • 60949093959 scopus 로고    scopus 로고
    • Selection of reliability original parameters in power system based on the fuzzy difference degree
    • Zhang Yong-jun, Yuan De-fu, Wang Sui-feng. Selection of reliability original parameters in power system based on the fuzzy difference degree [J]. Electric Power Automation Equipment, 2009, 29 (2): 43-46.
    • (2009) Electric Power Automation Equipment , vol.29 , Issue.2 , pp. 43-46
    • Zhang, Y.-J.1    Yuan, D.-F.2    Wang, S.-F.3
  • 12
    • 74849094747 scopus 로고
    • Chinese source
    • 1995.
    • (1995)
  • 13
    • 0032071963 scopus 로고    scopus 로고
    • Distribution system reliability: Defaut data and model validation
    • Brown R E, Ochoa J R. Distribution system reliability: Defaut data and model validation [J]. IEEE Transactions on Power Systems, 1998, 13 (2): 704-709.
    • (1998) IEEE Transactions on Power Systems , vol.13 , Issue.2 , pp. 704-709
    • Brown, R.E.1    Ochoa, J.R.2
  • 14
    • 0036042303 scopus 로고    scopus 로고
    • Grey relational and fuzzy nearness analysis on the reliability study of power system
    • Chen Ju-hua, Zhao Jian-guo, Guo Yi-zhi. Grey relational and fuzzy nearness analysis on the reliability study of power system [J]. Proceedings of the CSEE, 2002, 22 (1): 59-63.
    • (2002) Proceedings of the CSEE , vol.22 , Issue.1 , pp. 59-63
    • Chen, J.-H.1    Zhao, J.-G.2    Guo, Y.-Z.3
  • 15
    • 33749455149 scopus 로고    scopus 로고
    • Rolling prediction and residual error revise of original reliability parameter of power system
    • Ren Zhen, Wu Min-dong, Huang Wen-ying. Rolling prediction and residual error revise of original reliability parameter of power system [J]. Electric Power Automation Equipment, 2006, 26 (7): 10-12.
    • (2006) Electric Power Automation Equipment , vol.26 , Issue.7 , pp. 10-12
    • Ren, Z.1    Wu, M.-D.2    Huang, W.-Y.3
  • 16
    • 74849113035 scopus 로고    scopus 로고
    • Chinese source
    • 2004.
    • (2004)
  • 17
    • 74849121479 scopus 로고    scopus 로고
    • Chinese source
    • 2006.
    • (2006)
  • 18
    • 70449134346 scopus 로고    scopus 로고
    • A novel load forecasting method based on grey relational weighing combination model
    • Zhu Chang-qing, Wang Xiu-he, Zhang Xin, et al. A novel load forecasting method based on grey relational weighing combination model [J]. Proceedings of the CSU-EPSA, 2006, 18 (2): 78-81.
    • (2006) Proceedings of the CSU-EPSA , vol.18 , Issue.2 , pp. 78-81
    • Zhu, C.-Q.1    Wang, X.-H.2    Zhang, X.3
  • 19
    • 74849129365 scopus 로고    scopus 로고
    • Chinese source
    • 2002.
    • (2002)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.