메뉴 건너뛰기




Volumn 12, Issue 3, 2010, Pages 194-198

A tool for productivity and cost forecasting of decentralised wood chipping

Author keywords

Biomass; Chipping; Modelling; Productivity

Indexed keywords

BIOMASS SECTOR; BUSINESS OPPORTUNITIES; CHIPPER PRODUCTIVITY; CHIPPING; COST FORECASTING; DECENTRALISED; EUROPEAN FORESTS; FIELD TRIAL; FOREST BIOMASS; INPUT DATAS; MICROSOFT EXCEL; OPERATION SCHEDULING; OPERATIONAL CONDITIONS; PREDICTIVE EQUATIONS; PRICE SETTING; RELIABLE ESTIMATES; STANDARD COSTING; UNIVERSITY OF CALIFORNIA; VALIDATION TEST; WOOD CHIPPING; WORKING CONDITIONS;

EID: 74449093964     PISSN: 13899341     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.forpol.2009.10.002     Document Type: Article
Times cited : (57)

References (19)
  • 1
    • 34547426405 scopus 로고    scopus 로고
    • Productivity and cost of cut-to-length and whole-tree harvesting in a mixed-conifer stand
    • Adebayo A., Han H., and Johnson L. Productivity and cost of cut-to-length and whole-tree harvesting in a mixed-conifer stand. Forest Products Journal 57 6 (2007) 59-69
    • (2007) Forest Products Journal , vol.57 , Issue.6 , pp. 59-69
    • Adebayo, A.1    Han, H.2    Johnson, L.3
  • 4
    • 13844271964 scopus 로고    scopus 로고
    • An engineering economics approach to the estimation of forest fuel supply in North-Trøndelag County, Norway
    • Bjørnstad E. An engineering economics approach to the estimation of forest fuel supply in North-Trøndelag County, Norway. Journal of Forest Economics 10 (2005) 161-188
    • (2005) Journal of Forest Economics , vol.10 , pp. 161-188
    • Bjørnstad, E.1
  • 5
    • 74449085317 scopus 로고    scopus 로고
    • Alabama Agric. Exp. Station, Auburn University Revised, 32 pp.
    • Brinker R.W., Lynard J., Rummer B., and Lanford B.L. Machine rates for selected forest harvesting machines. Circular vol. 296 (2002), Alabama Agric. Exp. Station, Auburn University Revised, 32 pp.
    • (2002) Circular , vol.296
    • Brinker, R.W.1    Lynard, J.2    Rummer, B.3    Lanford, B.L.4
  • 6
    • 0141916204 scopus 로고
    • Evaluating operator-machine interactions in comparative time studies
    • Gullberg T. Evaluating operator-machine interactions in comparative time studies. International Journal of Forest Engineering 7 1 (1995) 51-61
    • (1995) International Journal of Forest Engineering , vol.7 , Issue.1 , pp. 51-61
    • Gullberg, T.1
  • 7
    • 45949109532 scopus 로고    scopus 로고
    • The economics of alternative fuel reduction treatments in the western United States dry forests: financial and policy implications from the National Fire and Fire Surrogate Study
    • Hartsough B., Abrams S., Barbour J., Drews E., McIver J., Moghaddas J., Schwilk D., and Stephens S. The economics of alternative fuel reduction treatments in the western United States dry forests: financial and policy implications from the National Fire and Fire Surrogate Study. Forest Policy and Economics 10 (2008) 344-354
    • (2008) Forest Policy and Economics , vol.10 , pp. 344-354
    • Hartsough, B.1    Abrams, S.2    Barbour, J.3    Drews, E.4    McIver, J.5    Moghaddas, J.6    Schwilk, D.7    Stephens, S.8
  • 8
    • 34147190926 scopus 로고    scopus 로고
    • Management alternatives of energy wood thinning stands
    • Heikkilä J., Sirén M., and Äijälä O. Management alternatives of energy wood thinning stands. Biomass and Bioenergy 31 (2007) 255-266
    • (2007) Biomass and Bioenergy , vol.31 , pp. 255-266
    • Heikkilä, J.1    Sirén, M.2    Äijälä, O.3
  • 10
    • 0001851622 scopus 로고
    • Verification of computer simulation models
    • Naylor T., and Finger J. Verification of computer simulation models. Management Science 14 2 (1967) 92-101
    • (1967) Management Science , vol.14 , Issue.2 , pp. 92-101
    • Naylor, T.1    Finger, J.2
  • 14
    • 67649923315 scopus 로고
    • Work measurement: observed time to standard time
    • Work study in forestry. Wittering W. (Ed) 1973, n.47
    • Scott A. Work measurement: observed time to standard time. In: Wittering W. (Ed). Work study in forestry. Forestry Commission Bulletin (1973) 26-39 1973, n.47
    • (1973) Forestry Commission Bulletin , pp. 26-39
    • Scott, A.1
  • 15
  • 16
    • 60749096332 scopus 로고    scopus 로고
    • Analysing and estimating delays in wood chipping operations
    • Spinelli, R., Visser, R., 2009. Analysing and estimating delays in wood chipping operations. Biomass and Bioenergy 33, 429-433.
    • (2009) Biomass and Bioenergy , vol.33 , pp. 429-433
    • Spinelli, R.1    Visser, R.2
  • 17
    • 34247509724 scopus 로고    scopus 로고
    • Measuring the productivity and physical workload of brushcutters within the context of a production-based pay system
    • Toupin D., LeBel L., Dubeau D., Imbeau D., and Bouthillier L. Measuring the productivity and physical workload of brushcutters within the context of a production-based pay system. Forest Policy and Economics 9 (2007) 1046-1055
    • (2007) Forest Policy and Economics , vol.9 , pp. 1046-1055
    • Toupin, D.1    LeBel, L.2    Dubeau, D.3    Imbeau, D.4    Bouthillier, L.5
  • 19
    • 67650773152 scopus 로고
    • MIT Model Analysis Program: what we have learned about policy model review
    • Wood D. MIT Model Analysis Program: what we have learned about policy model review. Proceedings of the 1986 Winter Simulation Conference (1986) 559-568
    • (1986) Proceedings of the 1986 Winter Simulation Conference , pp. 559-568
    • Wood, D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.