-
1
-
-
0003515463
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Ahuja K.R., Magnanti T.L., and Orlin J.B. Network Flows: Theory, Algorithms and Applications (1993), Prentice-Hall, Englewood Cliffs, NJ
-
(1993)
Network Flows: Theory, Algorithms and Applications
-
-
Ahuja, K.R.1
Magnanti, T.L.2
Orlin, J.B.3
-
2
-
-
33845405527
-
Optimization of the quadratic assignment problem using an ant colony algorithm
-
Demirel N.Ç., and Toksan M.D. Optimization of the quadratic assignment problem using an ant colony algorithm. Applied Mathematics and Computation 183 (2006) 427-435
-
(2006)
Applied Mathematics and Computation
, vol.183
, pp. 427-435
-
-
Demirel, N.Ç.1
Toksan, M.D.2
-
4
-
-
0001179988
-
Crane scheduling with time windows in circuit board production lines
-
Ge Y., and Yih Y. Crane scheduling with time windows in circuit board production lines. International Journal of Production Research 33 (5) (1995) 1187-1199
-
(1995)
International Journal of Production Research
, vol.33 5
, pp. 1187-1199
-
-
Ge, Y.1
Yih, Y.2
-
7
-
-
0242634697
-
An immunity-based ant colony optimization algorithm for solving weapon-target assignment problem
-
Lee Z.-J., Lee C.-Y., and Su S.-F. An immunity-based ant colony optimization algorithm for solving weapon-target assignment problem. Applied Soft Computing 2 (2002) 39-47
-
(2002)
Applied Soft Computing
, vol.2
, pp. 39-47
-
-
Lee, Z.-J.1
Lee, C.-Y.2
Su, S.-F.3
-
8
-
-
77951139709
-
Complexity of machine scheduling problems
-
Hammer P.L., Johnson E.L., Korte B.H., and Nemhauser G.L. (Eds), North-Holland, Amsterdam
-
Lenstra J.K., Rinnooy Kan A.H.G., and Brucker P. Complexity of machine scheduling problems. In: Hammer P.L., Johnson E.L., Korte B.H., and Nemhauser G.L. (Eds). Annals of Discrete Mathematics vol. 1 (1977), North-Holland, Amsterdam 343-362
-
(1977)
Annals of Discrete Mathematics
, vol.1
, pp. 343-362
-
-
Lenstra, J.K.1
Rinnooy Kan, A.H.G.2
Brucker, P.3
-
9
-
-
0036918864
-
Crane scheduling using tabu search
-
IEEE International Conference on Tools with Artificial Intelligence
-
Lim, A., Rodgrigues, B., Xiao, F., Zhu, Y., 2002. Crane scheduling using tabu search. In: Proceedings of the 14th IEEE International Conference on Tools with Artificial Intelligence.
-
(2002)
Proceedings of the 14th
-
-
Lim, A.1
Rodgrigues, B.2
Xiao, F.3
Zhu, Y.4
-
10
-
-
0000197379
-
A crane scheduling problem in a computer integrated manufacturing environment
-
Matsuo H., Shang J.S., and Sullivan R.S. A crane scheduling problem in a computer integrated manufacturing environment. Management Science 37 5 (1991) 587-605
-
(1991)
Management Science
, vol.37
, Issue.5
, pp. 587-605
-
-
Matsuo, H.1
Shang, J.S.2
Sullivan, R.S.3
-
11
-
-
10444233579
-
Crane scheduling in container yards with inter-crane interference
-
Ng W.C. Crane scheduling in container yards with inter-crane interference. European Journal of Operational Research 164 (2005) 64-78
-
(2005)
European Journal of Operational Research
, vol.164
, pp. 64-78
-
-
Ng, W.C.1
-
12
-
-
1642559633
-
Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs
-
Rajendran C., and Ziegler H. Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs. European Journal of Operational Research 155 (2004) 426-438
-
(2004)
European Journal of Operational Research
, vol.155
, pp. 426-438
-
-
Rajendran, C.1
Ziegler, H.2
-
13
-
-
6344253119
-
Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time
-
Shyu S.J., Lin B.M.T., and Yin P.Y. Application of ant colony optimization for no-wait flowshop scheduling problem to minimize the total completion time. Computers & Industrial Engineering 47 (2004) 181-193
-
(2004)
Computers & Industrial Engineering
, vol.47
, pp. 181-193
-
-
Shyu, S.J.1
Lin, B.M.T.2
Yin, P.Y.3
-
15
-
-
0942269532
-
An ant colony system for permutation flow-shop sequencing
-
Ying K.-C., and Liao C.-J. An ant colony system for permutation flow-shop sequencing. Computers & Operations Research 31 5 (2004) 791-801
-
(2004)
Computers & Operations Research
, vol.31
, Issue.5
, pp. 791-801
-
-
Ying, K.-C.1
Liao, C.-J.2
|