메뉴 건너뛰기




Volumn 59, Issue 1, 2010, Pages 98-116

SMED: For quick changeovers in foundry SMEs

Author keywords

Foundry engineering; Lead times; Productivity rate; Small to medium sized enterprises

Indexed keywords


EID: 73649111056     PISSN: 17410401     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410401011006130     Document Type: Article
Times cited : (55)

References (20)
  • 2
    • 0033896757 scopus 로고    scopus 로고
    • Developing management strategies: Influence of technology and other issues
    • Banerjee, S.K. (2000), "Developing management strategies: influence of technology and other issues" in International Journal of Production Research, Vol. 64, No. 2, pp. 79-90.
    • (2000) International Journal of Production Research , vol.64 , Issue.2 , pp. 79-90
    • Banerjee, S.K.1
  • 3
    • 73649133186 scopus 로고    scopus 로고
    • A real time dynamic lot sizing heuristic for a manufacturing system
    • Burman, M.H., Gershwin, S.B. (1996), "A real time dynamic lot sizing heuristic for a manufacturing system" in Productivity Journal, Vol. 53, No. 4, pp. 80-91.
    • (1996) Productivity Journal , vol.53 , Issue.4 , pp. 80-91
    • Burman, M.H.1    Gershwin, S.B.2
  • 4
    • 73649087827 scopus 로고    scopus 로고
    • SMED: Set-up time reduction and its components
    • Chao, H.C. (2001), "SMED: set-up time reduction and its components" in International Journal of Production Research, Vol. 41, No. 4, pp. 257-61.
    • (2001) International Journal of Production Research , vol.41 , Issue.4 , pp. 257-261
    • Chao, H.C.1
  • 7
    • 73649091652 scopus 로고
    • A work load balancing model for determining set-up time and batch size reduction in G.T. flow line work cells
    • Gung, D., Studel, F. (1990), "A work load balancing model for determining set-up time and batch size reduction in G.T. flow line work cells" in International Journal of Production Research, Vol. 28, No. 4, pp. 255-92.
    • (1990) International Journal of Production Research , vol.28 , Issue.4 , pp. 255-292
    • Gung, D.1    Studel, F.2
  • 8
    • 73649134564 scopus 로고    scopus 로고
    • Economic justification of set-up time reduction - a mathematical model
    • Hurley, R.B. (2000), "Economic justification of set-up time reduction - a mathematical model" in International Journal of Production Research, Vol. 32, No. 7, pp. 73-83.
    • (2000) International Journal of Production Research , vol.32 , Issue.7 , pp. 73-83
    • Hurley, R.B.1
  • 9
    • 73649084295 scopus 로고    scopus 로고
    • Estimating the distribution and variance of time to produce a fixed lot size from given deterministic processing times and random down times
    • Kim, D.S. (1997), "Estimating the distribution and variance of time to produce a fixed lot size from given deterministic processing times and random down times" in Journal of Industrial Engineering, Vol. 21, pp. 90-101.
    • (1997) Journal of Industrial Engineering , vol.21 , pp. 90-101
    • Kim, D.S.1
  • 10
    • 0005895467 scopus 로고    scopus 로고
    • The relationship between firm size, competitive advantages and export performance revisited
    • Moen, O. (1999), "The relationship between firm size, competitive advantages and export performance revisited" in International Small Business Journal, Vol. 18, pp. 53-72.
    • (1999) International Small Business Journal , vol.18 , pp. 53-72
    • Moen, O.1
  • 11
    • 3543131930 scopus 로고    scopus 로고
    • Manufacturing competitive priorities and productivity: An empirical study
    • Noble, M.A. (1997), "Manufacturing competitive priorities and productivity: an empirical study" in International Journal of Operations & Production Management, Vol. 17, No. 1, pp. 85-99.
    • (1997) International Journal of Operations & Production Management , vol.17 , Issue.1 , pp. 85-99
    • Noble, M.A.1
  • 12
    • 73649143036 scopus 로고
    • Lead time competitiveness in make-to-order manufacturing firm
    • Pannesi, R.T. (1995), "Lead time competitiveness in make-to-order manufacturing firm" in International Journal of Production Research, Vol. 3, No. 6, pp. 150-63.
    • (1995) International Journal of Production Research , vol.3 , Issue.6 , pp. 150-163
    • Pannesi, R.T.1
  • 13
    • 0035645982 scopus 로고    scopus 로고
    • Effective quick response practices in a supply chain partnership: Australian case study
    • Perry, M., Sohal, A.S. (2001), "Effective quick response practices in a supply chain partnership: Australian case study" in International Journal of Operations & Production Management, Vol. 21, pp. 840-54.
    • (2001) International Journal of Operations & Production Management , vol.21 , pp. 840-854
    • Perry, M.1    Sohal, A.S.2
  • 14
    • 0003106484 scopus 로고
    • The core competence of the corporation
    • Prahlad, C.K., Hamel, G. (1990), "The core competence of the corporation" in Harvard Business Review, Vol. 68, No. 3, pp. 79-91.
    • (1990) Harvard Business Review , vol.68 , Issue.3 , pp. 79-91
    • Prahlad, C.K.1    Hamel, G.2
  • 15
    • 73649119071 scopus 로고    scopus 로고
    • A revolution in manufacturing: The SMED system
    • Shingo, S. (2000), "A revolution in manufacturing: the SMED system" in Productivity Journal, Vol. 50, No. 3, pp. 241-50.
    • (2000) Productivity Journal , vol.50 , Issue.3 , pp. 241-250
    • Shingo, S.1
  • 17
    • 33745469200 scopus 로고    scopus 로고
    • Competitiveness of small and medium enterprises: Case of an Indian auto component manufacturing organization
    • Singh, R.K., Garg, S.K., Deshmukh, S.G. (2004), "Competitiveness of small and medium enterprises: case of an Indian auto component manufacturing organization" in IIMB Management Review, Vol. 16, No. 4, pp. 245-55.
    • (2004) IIMB Management Review , vol.16 , Issue.4 , pp. 245-255
    • Singh, R.K.1    Garg, S.K.2    Deshmukh, S.G.3
  • 18
    • 73649123418 scopus 로고    scopus 로고
    • Small scale sector: An engine of growth
    • Times of India, 24 October
    • Times of India (2002), "Small scale sector: an engine of growth" in Times of India, p. 16, 24 October.
    • (2002) Times of India , pp. 16
  • 19
    • 73649118732 scopus 로고    scopus 로고
    • Manufacturing needs a budget boost
    • Times of India, 22 January
    • Times of India (2005), "Manufacturing needs a budget boost" in Times of India, p. 18, 22 January.
    • (2005) Times of India , pp. 18


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.