메뉴 건너뛰기




Volumn 29, Issue 5-6, 2006, Pages 616-628

A strategy for integrating product conceptualization and bid preparation

Author keywords

Bid preparation; Collaborative product development; Conceptual design; Concurrent cost schedule estimation; General sorting; Self organizing map

Indexed keywords

BID PREPARATION; CELLULAR PHONE DESIGN; COLLABORATIVE PRODUCT DEVELOPMENT; DESIGN OPTION; DESIGN SYSTEMS; ESTIMATION STRATEGIES; GENERAL SORTING; GLOBAL BUSINESS; NEW PRODUCT DEVELOPMENT; PRODUCT PLATFORMS; PROTOTYPE SYSTEM; REQUIREMENTS ACQUISITION; SELF-ORGANIZING MAP NEURAL NETWORK; SMALL AND MEDIUM-SIZED ENTERPRISE; TECHNICAL ACTIVITIES;

EID: 73649100302     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/BF02729116     Document Type: Article
Times cited : (9)

References (38)
  • 1
    • 0030122476 scopus 로고    scopus 로고
    • Succeeding at product development involves more than avoiding failure
    • DOI 10.1016/0263-2373(95)00061-5
    • A Johne 1996 Succeeding at product development involves more than avoiding failure Eur Manage J 14 2 176 179 10.1016/0263-2373(95)00061-5 (Pubitemid 126170205)
    • (1996) European Management Journal , vol.14 , Issue.2 , pp. 176-180
    • Johne, A.1
  • 2
    • 0036728124 scopus 로고    scopus 로고
    • Supply chain planning opportunities for small and medium sized companies
    • DOI 10.1016/S0166-3615(02)00054-4, PII S0166361502000544
    • HH Hvolby J Trienekens 2002 Supply chain planning opportunities for small and medium sized companies Comput Ind 49 3 8 10.1016/S0166-3615(02)00054-4 (Pubitemid 34974870)
    • (2002) Computers in Industry , vol.49 , Issue.1 , pp. 3-8
    • Hvolby, H.-H.1    Trienekens, J.2
  • 3
    • 0037246964 scopus 로고    scopus 로고
    • Change management in concurrent engineering from a parameter perspective
    • 10.1016/S0166-3615(02)00138-0
    • K Rouibah KR Caskey 2003 Change management in concurrent engineering from a parameter perspective Comput Ind 50 15 34 10.1016/S0166-3615(02)00138-0
    • (2003) Comput Ind , vol.50 , pp. 15-34
    • Rouibah, K.1    Caskey, K.R.2
  • 4
    • 0036729811 scopus 로고    scopus 로고
    • Efficient collaboration between main and sub-suppliers
    • DOI 10.1016/S0166-3615(02)00056-8, PII S0166361502000568
    • B Fagerström M Jackson 2002 Efficient collaboration between main and sub-suppliers Comput Ind 49 25 35 10.1016/S0166-3615(02)00056-8 (Pubitemid 34974872)
    • (2002) Computers in Industry , vol.49 , Issue.1 , pp. 25-35
    • Fagerstrom, B.1    Jackson, M.2
  • 5
    • 0036731839 scopus 로고    scopus 로고
    • B2B eMarketplaces and small- and medium-sized enterprises
    • DOI 10.1016/S0166-3615(02)00058-1, PII S0166361502000581
    • T Gulledge 2002 B2B eMarketplaces and small- and medium-sized enterprises Comput Ind 49 47 58 10.1016/S0166-3615(02)00058-1 (Pubitemid 34979784)
    • (2002) Computers in Industry , vol.49 , Issue.1 , pp. 47-58
    • Gulledge, T.1
  • 6
    • 0023961978 scopus 로고    scopus 로고
    • Developing competitive bids: A framework for information processing
    • 10.1057/palgrave.jors.0390202
    • SC Ward CB Chapman 1998 Developing competitive bids: A framework for information processing J Oper Res Soc 39 2 123 134 10.1057/palgrave.jors.0390202
    • (1998) J Oper Res Soc , vol.39 , Issue.2 , pp. 123-134
    • Ward, S.C.1    Chapman, C.B.2
  • 9
    • 0036885449 scopus 로고    scopus 로고
    • A modelling tool for the management of product data in a co-design environment
    • DOI 10.1016/S0010-4485(01)00188-9, PII S0010448501001889
    • F Giannini M Monti D Biondi F Bonfatti PD Monari 2002 A modelling tool for the management of product data in a co-design environment Comput Aided Des 34 1063 1073 10.1016/S0010-4485(01)00188-9 (Pubitemid 34873668)
    • (2002) CAD Computer Aided Design , vol.34 , Issue.14 , pp. 1063-1073
    • Giannini, F.1    Monti, M.2    Biondi, D.3    Bonfatti, F.4    Monari, P.D.5
  • 10
    • 0031223629 scopus 로고    scopus 로고
    • An infrastructure to support concurrent engineering in bid preparation
    • 10.1016/S0166-3615(97)00025-0
    • M Krömker KD Thoben A Wickner 1997 An infrastructure to support concurrent engineering in bid preparation Comput Ind 33 201 208 10.1016/S0166-3615(97)00025-0
    • (1997) Comput Ind , vol.33 , pp. 201-208
    • Krömker, M.1    Thoben, K.D.2    Wickner, A.3
  • 11
    • 32144455979 scopus 로고    scopus 로고
    • A reference model and software support for bid preparation in supply chains in the construction industry
    • Wagner RR, Tjoa AM (eds.) Vienna, Austria, 26-28 August 1998 IEEE Comput Soc
    • Krömker M, Weber F, Steinlechner V, Wämke P (1998) A reference model and software support for bid preparation in supply chains in the construction industry. In: Wagner RR, Tjoa AM (eds.) Proc Ninth International Workshop on Database and Expert Systems Applications, DEXA'98. Vienna, Austria, 26-28 August 1998, pp 1009-1014, IEEE Comput Soc
    • (1998) Proc Ninth International Workshop on Database and Expert Systems Applications, DEXA'98 , pp. 1009-1014
    • Krömker, M.1    Weber, F.2    Steinlechner, V.3    Wämke, P.4
  • 12
    • 0029488119 scopus 로고
    • Life cycle engineering and design
    • 10.1016/S0007-8506(07)60504-6
    • L Alting JB Legarth 1995 Life cycle engineering and design Ann CIRP 44 2 569 588 10.1016/S0007-8506(07)60504-6
    • (1995) Ann CIRP , vol.44 , Issue.2 , pp. 569-588
    • Alting, L.1    Legarth, J.B.2
  • 13
    • 0036729958 scopus 로고    scopus 로고
    • Product configuration and inter-firm co-ordination: An innovative solution from a small manufacturing enterprise
    • DOI 10.1016/S0166-3615(02)00057-X, PII S016636150200057X
    • C Forza F Salvador 2002 Product configuration and inter-firm coordination: An innovative solution from a small manufacturing enterprise Comput Ind 49 37 46 10.1016/S0166-3615(02)00057-X (Pubitemid 34974873)
    • (2002) Computers in Industry , vol.49 , Issue.1 , pp. 37-46
    • Forza, C.1    Salvador, F.2
  • 14
    • 0035201184 scopus 로고    scopus 로고
    • Efficient method for scheduling construction projects with resource constraints
    • DOI 10.1016/S0263-7863(00)00024-7
    • M Chelaka L Abeyasinghe DJ Greenwood DE Johnsen 2001 An efficient method for scheduling construction projects with resource constraints Int J Project Manage 19 29 45 10.1016/S0263-7863(00)00024-7 (Pubitemid 32020456)
    • (2001) International Journal of Project Management , vol.19 , Issue.1 , pp. 29-45
    • Abeyasinghe, M.C.L.1    Greenwood, D.J.2    Johansen, D.E.3
  • 15
    • 0036132285 scopus 로고    scopus 로고
    • Project management applications of the theory of constraints beyond critical chain scheduling
    • DOI 10.1016/S0263-7863(00)00054-5, PII S0263786300000545
    • H Steyn 2002 Project management applications of the theory of constraints beyond critical chain scheduling Int J Project Manage 20 75 80 10.1016/S0263-7863(00)00054-5 (Pubitemid 33102307)
    • (2002) International Journal of Project Management , vol.20 , Issue.1 , pp. 75-80
    • Steyn, H.1
  • 16
    • 0036568539 scopus 로고    scopus 로고
    • Effects of resource management regimes on project schedule
    • DOI 10.1016/S0263-7863(01)00020-5, PII S0263786301000205
    • S Al-jibouri 2002 Effects of resources management regimes on project schedule Int J Project Manage 20 271 277 10.1016/S0263-7863(01)00020-5 (Pubitemid 34276407)
    • (2002) International Journal of Project Management , vol.20 , Issue.4 , pp. 271-277
    • Al-jibouri, S.1
  • 17
    • 0037402152 scopus 로고    scopus 로고
    • Project scheduling for collaborative product development using DSM
    • DOI 10.1016/S0263-7863(02)00023-6
    • CH Chen SF Ling W Chen 2003 Project scheduling for collaborative product development using DSM Int J Project Manage 21 291 299 10.1016/S0263-7863(02) 00023-6 (Pubitemid 36386770)
    • (2003) International Journal of Project Management , vol.21 , Issue.4 , pp. 291-299
    • Chen, C.-H.1    Ling, S.F.2    Chen, W.3
  • 18
    • 0036352425 scopus 로고    scopus 로고
    • Scheduling of flexible-sequenced process plans in a mould manufacturing shop
    • DOI 10.1007/s001700200144
    • PY Gan KS Lee 2002 Scheduling of flexible-sequenced process plans in a mould manufacturing shop Int J Adv Manuf Technol 20 214 222 10.1007/ s001700200144 (Pubitemid 34964544)
    • (2002) International Journal of Advanced Manufacturing Technology , vol.20 , Issue.3 , pp. 214-222
    • Gan, P.Y.1    Lee, K.S.2
  • 19
    • 0038333268 scopus 로고    scopus 로고
    • Ahierrachical cost estimation tool
    • 10.1016/S0166-3615(03)00016-2
    • D Koonce R Judd D Sormaz DT Masel 2003 Ahierrachical cost estimation tool Comput Ind 50 293 302 10.1016/S0166-3615(03)00016-2
    • (2003) Comput Ind , vol.50 , pp. 293-302
    • Koonce, D.1    Judd, R.2    Sormaz, D.3    Masel, D.T.4
  • 22
    • 0031077255 scopus 로고    scopus 로고
    • An analysis of knowledge acquisition roles and participants
    • 10.1111/1468-0394.00036
    • WP Wagner CW Holsapple 1997 An analysis of knowledge acquisition roles and participants Expert Syst 14 1 3 14 10.1111/1468-0394.00036
    • (1997) Expert Syst , vol.14 , Issue.1 , pp. 3-14
    • Wagner, W.P.1    Holsapple, C.W.2
  • 23
    • 85050419017 scopus 로고    scopus 로고
    • Faster, cheaper, deeper user research
    • V Kumar P Whitney 2003 Faster, cheaper, deeper user research Des Manage J 14 2 50 57
    • (2003) Des Manage J , vol.14 , Issue.2 , pp. 50-57
    • Kumar, V.1    Whitney, P.2
  • 27
    • 0000405679 scopus 로고    scopus 로고
    • A knowledge sorting process for a product design expert system
    • 10.1111/1468-0394.00106
    • CH Chen LG Occeña 1999 A knowledge sorting process for a product design expert system Expert Syst 16 3 170 182 10.1111/1468-0394.00106
    • (1999) Expert Syst , vol.16 , Issue.3 , pp. 170-182
    • Chen, C.H.1    Occeña, L.G.2
  • 28
    • 0036545528 scopus 로고    scopus 로고
    • An integrated approach to the elicitation of customer requirements for engineering design using picture sorts and fuzzy evaluation
    • W Yan CH Chen LP Khoo 2002 An integrated approach to the elicitation of customer requirements for engineering design using picture sorts and fuzzy evaluation Artif Intell Eng Des, Anal Manuf 16 59 71
    • (2002) Artif Intell Eng Des, Anal Manuf , vol.16 , pp. 59-71
    • Yan, W.1    Chen, C.H.2    Khoo, L.P.3
  • 29
    • 0026910250 scopus 로고
    • The use of 'contrived' knowledge elicitation technique
    • 10.1111/j.1468-0394.1992.tb00395.x
    • P McGeorge G Rugg 1992 The use of 'contrived' knowledge elicitation technique Expert Syst 9 3 149 154 10.1111/j.1468-0394.1992.tb00395.x
    • (1992) Expert Syst , vol.9 , Issue.3 , pp. 149-154
    • McGeorge, P.1    Rugg, G.2
  • 30
    • 0030144382 scopus 로고    scopus 로고
    • ACRE: Selection methods for requirements acquisition
    • NAM Maiden G Rugg 1996 ACRE: Selection methods for requirements acquisition Softw Eng J 11 183 192
    • (1996) Softw Eng J , vol.11 , pp. 183-192
    • Maiden, N.A.M.1    Rugg, G.2
  • 31
    • 0031140369 scopus 로고    scopus 로고
    • A bid solicitation and selection method for developing a competitive spot priced electric market
    • 10.1109/59.589669
    • JJ Ancona 1997 A bid solicitation and selection method for developing a competitive spot priced electric market IEEE Trans Power Syst 12 2 743 748 10.1109/59.589669
    • (1997) IEEE Trans Power Syst , vol.12 , Issue.2 , pp. 743-748
    • Ancona, J.J.1
  • 32
    • 0034269643 scopus 로고    scopus 로고
    • Key factors in bid reasoning model
    • Sept/Oct
    • Chua DKH, Li D (2000) Key factors in bid reasoning model. J Constr Eng Manage Sept/Oct:349-357
    • (2000) J Constr Eng Manage , pp. 349-357
    • Chua, D.K.H.1    Li, D.2
  • 33
    • 0035426615 scopus 로고    scopus 로고
    • Multi-criteria assessment of the probability of winning in the competitive bidding process
    • DOI 10.1016/S0263-7863(00)00020-X, PII S026378630000020X
    • E Cagno F Caron A Perego 2001 Multi-criteria assessment of the probability of winning in the competitive bidding process Int J Project Manage 19 313 324 10.1016/S0263-7863(00)00020-X (Pubitemid 32646671)
    • (2001) International Journal of Project Management , vol.19 , Issue.6 , pp. 313-324
    • Cagno, E.1    Caron, F.2    Perego, A.3
  • 36
    • 33745724835 scopus 로고    scopus 로고
    • An affective design system for product conceptualization via sorting technique and Kohonen self-organizing map
    • Tsukuba, Japan, 14-17 October 2003
    • Chen CH, Khoo LP, Yan W An affective design system for product conceptualization via sorting technique and Kohonen self-organizing map. The 6th Asian Design International Conference, Tsukuba, Japan, 14-17 October 2003, p 10
    • The 6th Asian Design International Conference , pp. 10
    • Chen, C.H.1    Khoo, L.P.2    Yan, W.3
  • 37
    • 0035193271 scopus 로고    scopus 로고
    • GA-based fuzzy optimal model for construction time-cost trade-off
    • DOI 10.1016/S0263-7863(99)00035-6
    • SS Leu AT Chen CH Yang 2001 A GA-based fuzzy optimal model for construction time-cost trade-off Int J Project Manage 19 47 58 10.1016/S0263-7863(99)00035-6 (Pubitemid 32020457)
    • (2001) International Journal of Project Management , vol.19 , Issue.1 , pp. 47-58
    • Leu, S.-S.1    Chen, A.-T.2    Yang, C.-H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.